Responds to NRC Re Violations Noted in IE Insp Repts 50-321/81-23 & 50-366/81-23.Corrective Actions: Procedure HNP 424 Re Notification of Significant Events Changed & Approved on 811006
ML20039B479
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/24/1981
From: Beckham J
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20039B472 List:
References
NUDOCS 8112230101
Download: ML20039B479 (2)


Text

.

L

, ' ' m;

W NRC RET ~ -

c -

n N Tl.

.. o ;.,,

I November 24, 1981 Georgia Power 71 p'mr '25 Pl2 20

.,,, me,n,,,,,

J.T.Beckham,Jr U. S. Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement RII: JPG Region II - Suite 3100 50-321/50-366 101 Marietta Street, NW Inspection Report Atlanta, Georgia 30303 81-23 ATTENTION:

Mr. James P. O'Reilly GENTLEMEN:

The following information is submitted in response to Inspection Report 81-23 concerning the inspection conducted by R. F. Rogers of your office on August 21 through September 28, 1981.

One apparent violation was identified.

VIOLATION 10 CFR 50.72(a)(7) requires that each licensee of a Nuclear Power Reactor shall notify the NRC Operations Center as soon as possible and in all cases within one hour by telephone of the occurrence of any event resulting in automatic actuation of the Reactor Protection System.

Contrary to the above, the NRC Operations Center was not notified within one hour of a reactor scram which occurred on September 9,1981, due to a main steam isolation valve (MSIV) closure.

Notification was made one hour and twenty four minutes following the event.

This violation is applied to Unit 2 only.

This is a Severity Level V Violation (Supplement I.E.).

RESPONSE

Admission or denial of alleged violation:

The violation occurred as stated.

Reason for the violation:

The slight delay in notification was due to supervisory involvement in operations immediately following the RPS actuation to ensure that prompt decisions could be made in the event of any problem.

In addition, time was needed to compile information so that a reliable, accurate notification could be made.

By due process of providing decisive supervisory direction and control of operations, the collection and transmission of the notification data was not completed until one hour and twenty-four minutes past the time of the event.

8112230101 011216 PDR ADOCK 05000321 O

PDR O

4 k

jamer 1.-

- U. S. Ibclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 tbvember 24, 1981 Page Two Corrective steps which have been taken and results achieved:

Procedure HtF 424, " Notification of Significant Events" was changed and approved on October 6, 1981 to include notification of the Resident Inspector.

This procedure already includes notification of the NRC Operations Center within one hour.

Additionally, the importance of timely event notification has been stressed to the Shift Supervisors.

Corrective steps which will be taken to avoid further violations:

No further actions are requireo.

Date when full compliance will be achieved:

l e are presently in full compliance.

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEGRGIA POWER COMPANY O,%

By:

fJ.T.Beckham,Jr.

Sworn to and subscribed before me this 24th day of November, 1981.

//

Notary Public, Georgia, State at Large f

Q MM)

My Commission Expires Sept. 20,1983 Notary Public REB /mb xc:

M. Manry R. F. Rogers, III

k Georgia Power n U. S. tbclear Regulatory Commission Office of Inspection and Enforcement h

Region II - Suite 3100 November 24, 1981 Page Two Corrective steps which have been taken and results achieved:

Proaadure HtP 424, " Notification of Significant Events" was changed and apptoved on October 6, 1981 to include notification of the Resident Inspector.

This procedure already includes notification of the NRC Operations Center within one hour.

Additionally, the importance of timely event notification has been stressed to the Shift Supervisors.

Corrective steps which will be taken to avoid further violations:

No further actions are required.

Date when full compliance will be achieved:

We are presently in full compliance.

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this l

letter are true.

GEORGIA POWER COMPANY By:

0,%

i p.T.Beckham,Jr.

Sworn to and subscribed before me this 24th day of November, 1981.

//

Notary Public, Georgia, State at Large

_f Q

HM)

My Commission Expires Sept. 20,1983 Notary Public REB /mb xc:

M. Manry R. F. Rogers, III

_ _ _. _ _ _ _ _ _ _ _ _