ML20039B480
| ML20039B480 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/03/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hancock J FLORIDA POWER CORP. |
| Shared Package | |
| ML20039B474 | List: |
| References | |
| NUDOCS 8112230102 | |
| Download: ML20039B480 (2) | |
See also: IR 05000302/1981022
Text
_ _ _ - - _ - _ _ - _ _ _
. _ _ _ _ _ _ _ _ _ _ _ _ .
.
_ _ - . . _
_ _ _ - _
_
_ _ _ _
_ _ _ _ _ _ _ _ __
_
_ _ _ _ _
__
_ _ _ _ _ _ _
fh
'
'
~
-
.
.
NOV 0 31981
Florida Power Corporation
ATTN: Mr. J. A. Hancock
Assistant Vice President
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
Subject: Report No. 50-302/81-22
.
.This refers to the routine safety inspection conducted by Mr. J. J. Lenahan of
this office on October 13-16, 1981, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River facility. Our preliminary findings were
discussed with Mr. D. C. Poole, Nuclear Plant Manager, at the s
- 1usion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
,
dix A.
Elements to be included in your response are delineated in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the encicsed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this offic'e promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it' is claimed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
-you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
8112230102 81121f
,
PDR ADOCK 05000302
G
PDR.
. _ .
.
. _ , _ _ -
__
_
_
-_ ._-
_.
. .
.
'
NOV 0 31981
~
-
-
Florida Power Corporation
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
P. J. Kellogg, Branch Chief
Division of Re;ident and
Reactor Project Inspection
Enclosures:
1
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/81-22
cc w/ encl:
D. C. Poole, Nuclear Plant Manager
bec w/ancl:
NRC Resident Inspector
Document Management Branch
State of Florida
[
60
/
RI@I
RII)
RII
RII
RII
RII
RII
V
J 0)/ 7$ 1'kinski
JJLenahan:ht
T nlon LCMurphy
Rogge
VBrownlee
PJsel ogg
10/A/81
[l/p/81
16/3 /81
10
14/ ;/81
14/M81
1$/g1
--