ML20039B259

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-460/81-09 & 50-513/81-09 on 811001,09 & 19-23 & Notice of Violation
ML20039B259
Person / Time
Site: Washington Public Power Supply System
Issue date: 12/03/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20039B260 List:
References
NUDOCS 8112220467
Download: ML20039B259 (2)


See also: IR 05000460/1981009

Text

.

._

..

.

_ - - _ _ _

_ _ _ _ _

.

2

w

g,(

q

y

,

,

p

g.

jy

y

g

y

g.-

f-

> -

l

.

DEC 3 1981

Docket Nos. 50-460

v

y

50-513

g

4

i

RECEWEO

d

DEC 211981" ~-

Washington Public Pcy.or Supply System

P. O. Box 968

'" $ dr6 C 2ii' il

u

_O

3000 George Washington Way

Richland, Washington -99352

,

,

@

Attention: Mr. D. W. Mazur

Program Director, WNP-1/4

Gentlemen:

Subject:

NRC Inspection of Washington Nuclear Projects 1 and 4

This Mfers to the inspection conducted by Messrs. Narbut and Toth of

this office on Oc.tober 1, 9, and 19-23, 1981 of activities authorized by

NRC Construction Permit No. CPPR-134 and CPPR-174, and to the discussions

of our findings held by Mr. Narbut and Mr. Toth with Mr. C. Edwards and

other members of your staff at the conclusion of the inspections.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the innection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

Your response to this notice is to be submitted in accordance with the

rrovisions of 10 CFR 2.201 as stated in Appendix A. Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this

office, by telephone, within ten days of the date of this letter and

submit written application to withhold infomation contained therein

within thirty days of the date of this letter. Such application must be

consistent with the requirements of 2.790(b)(1).

~ 60/

.p

.5

$ BEN"E8M'offfggg;

II

PDR.

_ _ _ _

o"'c4! . Ry,,,, ypQ ,

,,,,,k,,,,,,,

,

,,,,,

,,,,

,,,

,,, ,

, ,,,,,,,,, ,, ,,

, , , ,,,,,,, ,, ,,

,,,,,,,,,, ,,,, ,,,

-+

. .NA,RB,y]/,mn,, ,,]lH,,,,,,,

, , , , , , , , p,S , , , ,

fay,14,,,NBERp

,

,

,

,,,,,,,,,,, ,,,,,,,

,,

,, ,,,,,,,,

,,,,, ,,, , , , ,,

==>

12 9.9.I.8

.... #f8

l.El.8

22 m 81

.

....

. .....

. ...

. ...

....

,,,,

, , ,,,,,,, , ,,,,,,,

, , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , ,

NRC FORM 3'8110,90) NRCM O240 -

OFFICIAL RECOFiD COPY

' m mo-329 e2

_

_ _ _

' Washington Public Power Supply System -2-

.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

The responses directed by this letter and the accompanying Notice are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely,

Original signed by

B. H. Faulkenberry

B. H. Faulkenberry, Chief

Reactor Construction Projects

Branch

,

Enclosures:

A. Notice of Violation

B. IE Inspectioa Report

Nos. 50-46u/81-09

50-513/81-09

cc w/o cnclosure B:

R. B. Glasscock, Quality

Assurance Director

bec:

DMB/ Document Control Desk (RIDS)

,

Distributed by RV:

Engelken (ltr)

ResidentInspector(3)

tate of WA (Lewis)

3600 son

.

9

- (

l

i'-

4

%

,.s

-

3

,,

._

,_

. - - , , . , - , . . . _

_

_ _ - . - ,

4

,-

,-