IR 05000460/1981009
| ML20040E757 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 01/29/1982 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20040E758 | List: |
| References | |
| NUDOCS 8202050318 | |
| Download: ML20040E757 (1) | |
Text
,
.
-
- - - - -
-
-
- - - - - -
s
~4 m
_Q
-.
-
~Q n
JAN 2 0 1987.
@
-
%g Docket No. 50-460/513
'C gEC3itig y ;'
d
":
FEB A2
cra Y E32m !
Washington Public Power Supply System
-
rN P. O. Box 968
3000 George Washington Way t*
,
Richland, Washington 99352 Attention: Mr. D. W. Mazur Program Director, WNP-1/4 Gentlemen:
Thank you for your letter dated January 15, 1982, G01-82-0018, infoming us of the steps you are taking to correct items which we brought to your attention in our letter dated December 3,1981, transmitting IE Inspection Report 81-09.
Your response did not indicate an evaluation of work performed under completed contracts 207, 204, 213, 243, 246, and 254.
If appropriate, they and possibly others should be included in your sampling plan.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, B. H. Faulkenberry, Chief Reactor Construction Projects Branch
.
bec:
Docuemtn Control Desk (RIDS)
Distributed by RV:
State of WA (Lewis), Resident r202050318 820129 l
bk PDR ADOCK 05000460 Qh
PDR omce p.RV g....
..RV RV M I
....y..
.....
..........
....
....
...............
..............
...
...
" "^"'>.Narbut/cb
,Doddo Faullg e,,,, er 1,,,,,
,,,,,
,,,,,,,,,,
,,,,,,,
,,,,,,,
- * " >.u.Dt.6.a......u.11B.2......U2292.....
................
...........
........
......
...
NRC FORM 318 ttO.80l NRCM O240 OFFICIAL RECORD COPY
' " '9% -32 82 q
_