Duke Power Company
,
i
ATTN: Mr. W. O. Parker, Jr.
.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject:
Report Nos.TX3/81-Dd 50-414/81-22
.
This refers to the routine safety inspection conducted by Mr. P. K. Van Doorn of
e
~,
this office on August 26 - September 25. 1981, of activities authorized by NRC
Construction Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility. Our
preliminary findings were discussed with fir. J. C. Rogers, Project Manager, at
the conclusion of the inspection.
Areas examined during the inspection and our' findings are discussed in- the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
,
personnel, and observations by the inspector.
During the inspection, it was fcund that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the' Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
<
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
Two new unresolved items are identified in the enclosed inspection report. These
items will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this'
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this-
office by; telephone within ten days from the date of this letter of your
intention to file a request'for withholding; and (b) submit within twenty-five-
days from the.date of this letter a written application to this office to
. withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please- notify this-
office.promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed- by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
- disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
8112160122 811200
PDR ADOCK 05000413
0
u. . _ _
. _ _ _ . . . . , _- -
____--.._-_-__,___%
.
.
_
.
.
.
.
.
,
.
Duke Power Company
2
sought to be withheld shall be incorporated as far. as possible into a separate
part of the affidavit.
If we do not hear from you in this . regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
!
Paul J. Kellogg, Chief
Reactor Projects Branch 2,
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/81-22
ar.d 50-414/81-22
cc w/ encl:
J. W. Hampton, Station fianager
J. C. Rogers, Project lianager
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State.of South Carolina
RII
RII
RII
RII
7
3rn:dt
ryant
AIg
is
PJK
ogg
10/).le/81
0///f/81
10/)3/81
10/g/81
-1