ML20038B618

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/81-19 on 811005-07 & Notice of Deviation
ML20038B618
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/23/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: J. J. Barton
METROPOLITAN EDISON CO.
Shared Package
ML20038B619 List:
References
NUDOCS 8112080438
Download: ML20038B618 (2)


See also: IR 05000320/1981019

Text

.

,

NOV 2 31981 '

Docket No. 50-320

Metropolitan Edison Company

O$/

ATTN: Mr. J. J. Barton

6

'S

Acting Vice President and

d hh 9

Director of TMI-2

p

%$' lit

't -

P. O. Box 480

ie

4

-

4,

' . ~

]2,

%.

Middletown, Pennsylvania 17057

.

Q

5

Gentlemen:

/4

4g

y/

Subject:

Inspection No. 50-320/81-19

g,,

,

This refers to the routine safety inspection conducted by Mr. P.-Koltay of

this office on October 5-7, 1981 at Middletown, Pennsylvania of activities

authorized by NRC and to the discussions of our findings held by

Mr. P. Koltay with Mr. E. H. Gischel and other members of your staff at

f

the conclusion cf the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with

this letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

"

Howe'er, one activity appears to be a deviation from commitments made with

v

. respect to the installation of certain fire barrier penetrations as set

forth in the Notice of Deviation, enclosed herewith as Appendix A.

In your

reply, please include your comments concerning the deviation, and the date

correctiv,e action was or will be completed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this' letter of your intention to file a request for withholding; and

-

(b) subm h within 25 days from the date of this letter a written application

i

to thisfoffice to withhold such information.

Consistent with section

2.790(b)(1),'any such. application must be accompanied by an affidavit executed

by the-owner of the information which identifies the document or part sought

i

RI:DETI

RI:DETI

RI:

I

Koltay/gwch y Ebneter

Kei

ir

i p 1i

11/17/81 ]/

'

N

OFFICIAL RECORD COPY

'

l{

,

1

-7,60

.

s

l

l

81120e0438 G11123

DR ADOCK 05000320

PDR

Ib

L

.

- .-

-.

. _ _ .

.- . . _

-__-

_-

'

'

.

.

Metropolitan Edison Company

2

to be withheld, and which contains a full statement of the reasons on the

basis which it is claimed that the information should be withheld from public

I

disclosure. This section further requires the statement to address with

i

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

'

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public

Document Room. The telephone notification of your intent to request

withholding, or any request for an extension of the 10 day period which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

l

USNRC' Region I, at (215) 337-5223.

i

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

j

i

Or15 :1311 sigand BY &

'

R. R. Keimig, Chief

Projects Branch No. 2, Division of

j.

Resident and Project Insptction

1

j

Enclosures:

1.

Appendix A, Notice of Deviation

2.

Office of Inspection and Enforcement Inspection Report

>

Number 50-320/81-19

cc w/encls:

J. J. Barton, Director, Site Operations

J. E. Larson, TMI-2 Licensing Supervisor

,

'

E. G. Wallace,'PWR Licensing Manager

J. B. Liberman, Esquire

G. F. Trowbridge, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

,

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

Ms. Mary V. Southard, Co-Chairman, Citizens for a Safe Environment

(Without Report)

'

F

bec w/encis:

Region I Docket Room (with concurrences)

i

I

L. Barrett, Deputy Program Director, TMI Program Office

-

'

Chief, Operational Support Section (w/o encis)

'

...

Ms. Mary V. Southard, Co-Chairman, Citizens for a Safe Environment

'

0FFICIAL RECORD COPY

.

!'

,

,

.,.r-.-

. . -

..

_ _ . . _ . ,

, _ _ _ _

- -

m

__ - _ , _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ - - . _ _ _ . , _ . . _ _ - -

__-