IE Insp Rept 50-320/81-19 on 811005-07.Deviation Noted: Failure to Satisfy Guidelines Per Commitment to App a BTP 9.5-1 Re Fire Barrier Penetration Seals
ML20038B636
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/20/1981
From: Ebneter S, Koltay P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20038B619 List:
References
50-320-81-19, NUDOCS 8112080452
Download: ML20038B636 (7)


See also: IR 05000320/1981019

Text

-

,

.

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

Region.I

Report No. 50-320/81-19

Docket No 50-320

License No. DPR-73

Priority

--

Category

C

Licensee: Metropolitan Edison Company

P.O. Box 480

Middletown, PA 17057

Facility Name: Three Mile Island Nuclear Station, Unit 2

Inspection at: Middletown, Pennsylvania

Inspectionconducpd:

Oc ger - , 1981

Inspectors:

{'

&

[ dr

//!N

/

P. S. Kol af,

ac rI

ctor

date/ sign 6d

~

Approved by:

4

&,///

V

///EC/cf/

e

S." D. EbnWW, Chief, IPlant Systems

dat6 signed

Section, DETI

Inspection Summary,:

Inspection on October 5-7, 1981 (Report No. 50-320/81-19)

Areas Inspected:

Routine unannounced inspection of the Fire Protection /-

Prevention Program including: administrative procedures, assignment of functional

responsibilities, observation of critical fire area, action on previous inspection

findings, fire barrier penetration seals, and technical specification surveillance

records. The inspection involved 13 inspector hours on site by one regional based

inspector.

Results: Of the six areas inspected, no items of noncompliance were identified

in five areas; one deviation from a commitment was identified in one area.

(Deviation

paragraph 7)

'

i

f

8112080452 811123

PDR ADOCK 05000320

0

PDft

J

._-_.t.y~.,

,.g....-p.7,.m..,,,,

7 v,.y

, ,,,

m

,...-m

.,._.,,y.,,m,.

~.,-e,

,. .

_

m

-

-

_

_.

. _ - _ .

_

__

_

_

. - - -

4

.

. .

.

2

-

DETAILS

1.

Persons Contacted

S. D. Cha'plin, Licensing Engineer

E. H. Gischel, Director, Plant Engineering

.-

)

G. A. Kunder,. Technical Specification Compliance Supervisor

S. E. Lane, Fire Protection Engineer

'

T. A. O'Connor, Lead Fire Protection Engineer

'

J. W. Quinnette, Fire Protection Engineer

,

C. D. Rowe, Modifications / Operations Quality Assurance

All the above personnel attended the exit meeting.

i

2.

Licensee Action on Previous Inspection Findings

(Closed) Inspector Followup Item (320/79-19-03) and Infraction (320/78-38-01).

Poor housekeeping in the Cable Spreading Room.

j

!

The referenced reports identified the licensee's failure to maintain the

'

cable spreading room free of transient combustible materials such as

,

accumulated debris, recording tape and temporary tables.

l

4

The inspector reviewed procedure AP 1008, Good Housekeeping, dated November

12, 1980. The inspector verified that the cable spreading room was free-

of transient combustibles at the time of the inspection, and that the

,

licensee conducts periodic housekeeping inspections of the area.

(Closed) Unresolved Item (320/79-15-01) Auxiliary Building Roof Charcoal

'

Filter Sprinkler System.

The inspector verified that the auxiliary building roof charcoal filters

-

and the associated sprinkler systems have been removed from service.

This item is no longer applicable and it is considered closed.

(Closed) Unresolved Item (320/79-15-04 and 79-19-01) Auxiliary Diesel

Generators, Fire Protection.

l

The licensee stated that the auxiliary generators are no longer vital to

i

the safe maintenance of existing plant conditions and tichnical specification

requirement for the equipment have been eliminated. Accordingly unresolved

items relating to the fire protection of the above equ!ncast are considered

closed.

1

(Closed) Unresolved Item (320/79-26-06)- Fire Barrier Penetration Seals

Utilizing Silicone Foam.

i

The referenced report discussed the licensee's use of mineral wool as a

chafing guard in electrical cable floor penetration seals. Due to the

placement of chafing guards, the required uniform depth may not have been

maintained for all penetrations.

!

, . . . . - - - . , , , , , _ , , . , - . , , .

, , _ . - . _ , , . . . - , - .

_ . - - ,

.

. - - - - . - - - - - . . . - . . , . - - . , . , . , , _

,,

--

.

.

.

.

3

Through visual inspections of a random sample of the affected penetrations,

the inspector verified that the licensee removed all chafing materials

and filled the penetrations with silicone foam.

(Closed) Unresolved Item (320/79-15-05) Hose Houses, 1 1/2 inch Fire

Hose.

The referenced report discusses the licensee's failure to provide adequate

lengths of 1 1/2 inch diameter fire hose in hose houses.

The inspector verified that the licensee provided 300 feet of 1 1/2 inch

diameter hose in each of the hose houses located near building access

routes.

(Closed) Unresolved Item (320/79-19-02 and 79-29-02) Rad Waste Storage

Area, Fire Protection.

The referenced reports discuss the lack of fire protection for the radwaste

storage building (Paint Shed).

The inspector verified that the licensee installed automatic sprinklers

and fire detection devices inside the storage area.

In addition, a

hydrant was installed in the vicinity of the building. The licensee also

developed a fire fighting plan for the area. HP monitoring equipment is

located in the fire brigade van, which is used to respond in case of a

fire emergency.

(Closed) Inspector Followup Item (320/79-19-04) Fire Extinguisher Inspections.

The referenced report discussed the licensee's failure to conduct monthly

portable fire extinguisher inspections in several plant areas.

The inspector randomly checked portable extinguisher stickers in all

accessable plant areas.

The inspector verified that monthly fire extinguisher

inspections are conducted by the licensee.

(Closed) Unresolved Item (320/79-19-06) Fire Brigade Training _

The referenced report discussed the inadequacies of certain segments

(hands on equipment) of the licensee's fire brigade training program.

Since the issuance of the referenced report, the licensee has established

a fire brigade training program, wnich satisfies 10CFR50, Apper. dix R

requirements, including classroom training of brigade members and brigade

leaders, regular drills with offsite fire department participation and

hands on equipment training at the York County Fire School. Various

segments of the training have been reviewed by the inspector during this

and previous inspections and found to be acceptable.

.

,-...M

'

.

.

,

4

(Closed) Deficiency (320/78-38-02) Fire Pump Monthly Surveillance Test

3303-MI.

The referenced report discussed the licensee's failure to perform certain

steps prescribed in the procedure for the monthly functional fire pump

test.

The inspector reviewed the results of each monthly fire pump test performed

during 1981 to date. The inspector verified that the monthly tests were

performed in accordance with procedure.SP3303MI, revision 9.

The inspector

noted that the requirements of the procedure were satisfied during each

'

test.

No item of noncompliance was identified.

3.

Fire Protection / Prevention Program

a.

Administrative Controls

The inspector reviewed the following procedures and documents:

AP-1038, revision 2, Administrative Controls, Fire Protection

--

Program;

--

AP-1034, revision 4, Control of Combustible Materials;

--

AP-2101-1.2, Transient Combustible List;

-- 'AP-1008, revision 9, Geod Housekeeping;

--

1410-4-26, revision 5, Welding, Cutting, Grinding and Open

Flame Work Procedure for Fire Safety;

The inspector verified that the licensee has established an adequate

fire protection organization and has implemented an adequate fire

protection / prevention program which includes:

delineation'of responsi-

bility for personnel participating in the program, implementation of

administrative procedures, training for fire brigade members and

leaders, coordination and communication with offsite fire departments,

fire fighting strategies for vital areas and maintenance and surveillance

of fire protection equipment.

4.

Reactor Building Fire Protection

The inspector, during the course of the inspection and at the exit interview,

discussed with the licensee the status of the fire protection equipment

located inside the reactor containment building. The licensee stated

that to date the phy:.ical condition of fire protection equipment inside

containment has not been_ examined. However, during the course of discussions

the following was agreed to by the licensee:

a.

Fire detection devices and annunciated circuits are no longer

functional.

. _ -

-

. .

. n

.

. .

.

,

5

.

b.

The rubber fire hoses attached to the containment standpipe connections,

and the rubber discharge hoses of the portable CO2 extinguishers are

probably no longer functional.

l

The inspector expressed concerns regarding the introduction of

combustible materials in the containment building as part of a

decontamination program.

The licensee agreed that prior to initation of any type of prolonged

activity, inside containment, a complete review of existing and

.

'

newly introduced combustible materials will be conducted and adequate

fire protection measures will be taken.

The results of such reviews will be submitted to the NRC for review.

This item is considered unresolved.

(320/81-19-01).

5.

Review of Surveillance Test Rc;ords Associated with Technical

Specification Requirements

The inspector selected and reviewed the following records to' verify that

the associated required fire protection surveillances had been performed

and that the acceptance criteria had been met:

--

SP 4333 SAI, Fire System Detectors Instrument Functional Test, rev.

O.

The inspector reviewed the results of the test performed on

October 15, 1980.

--

SP 4333 SA2, Fire Detection Circuit Operational Check, rev. O. The

i'prector reviewed the results of tests performed on August 20,

ou.

--

33 43331 R3 Fire Barrier Penetration Fire Seal Inspection, rev. 1.

The inspector reviewed the results of inspections conducted since

September 12, 1981. The inspection process is still underway by the

licensee.

No item of noncompliance was identified.

6.

Critical Fire Areas

The inspector verified that the cable spreading room is free of: transient

combustible materials.

No item of noncompliance was identified.

7.

Fire Barrier Penetration Seals

The inspector reviewed temporary corrective measures taken by the licensee

to maintain electrical cable penetration fire seals functional. The

progressive dcterioration of fire barriers using Firewall 50 sealant, a

trade name for the Chemtrol Corporation, was previously described in the

following reference documents:

)

. .. ; '. .

6

a.

Nonconformance Report (NCR) No.78-132, dated June 15: 1978;

b.

Licensee Event Report LER No. 79-12/3L, dated September 11, 1979;

c.

IE Inspection Report 50-320/79-26

d.

Licensee's letter GQL 1583 to Mr. B. H. Grier, Director, NRC Region

I, dated December 31, 1980.

e.

Licensee letter LL2-81-0028 to B. H. Grier, Director, NRC, Region I,

dated February 4,1981.

f.

Licensee Event Report LER LL2-81-0062, dated March 3, 1981.

The licensee developed a methodical program for conducting temocrary

repairs on the defective penetration seals.

The program consi ns of

yearly inspections of the penetrations in accordance with procedure

SP4331-R3 and repair of cracks and separation openings in accordance

with procedure MP-1410-43.

During the course of this inspection, the inspector noted that the

deterioration of Firewall 50 sealant has increased.

Several penetra-

tions developed bulges, indicating that layers of the materials are

separating from the core of the penetration.

The inspector also

brought to the attention of the licensee, that two penetrations in

the cable spreading room have developed 1/4 to 1/2 inch wide and

10-15 inch long cracks which penetrate the depth of the material.

The licensee, following the requirements of Technical Specification 3.11.7, posted a fire watch in the area while temporary repairs were

initiated and completed by the licensee.

Fire barrier penetration seals were designed and installed to meet

the requirements of Appendix A to Branch Technical Position APCSB

9.5-1 " Guidelines for Fire Protection for Nuclear Power Plants",

-

section D3, which states in part, " Cable and cable tray penetrations

of fire barriers should be sealed to give protection at least equivalent

to that fire barrier. The design of the fire barriers ... should as

a minimum, meet the requirements of ASTME-119, Fire Test of Building

"

Construction and Materials .

Licensee's document NY0-77-002, rev. O, Fire Protection Program

Evaluation, Three Mile Island Nuclear Station, Unit 2, page 4.1-61,

states in part:

"All vertical cable trays and conduits passing

through fire rated floors and all horizontal cable trays and conduits

passing through fire rated walls have penetration seals installed to

prevent flame and smoke passage or propagation through the penetration.

The penetration seals have the same fire rating as the 5all or floor

they penetrate." The penetration seals used on TMI-2 have been

tested in accordance with the requirements of ASTM E-119-73, " Standard

Methods of Fire Tests of Building Construction and Materials"."

Ccstrary to the above, due to the extensive deterioration of Firewall

50 ealant material, the penetration seals do not have the same fire

rat,1g as the wall or floor they penetrate. Also contrary to licensee

commitments indicated in references b, d and f, a permanent repair

program has not been initiated.

.

.

.

'

. . .

.

7

,

The licensee's failure to satisfy the above guidelines is considered

to be a deviation from the licensee's commitment to Appendix A to

the BTP 9.5-1.

(320/81-19-02)

8.

Unresolved Item

Unresolved items are matters about which more information is required to

determine whether they are acceptable, items of noncompliance or deviations.

Unresolved items are discussed in paragraph 3b.

9.

Exit Interview

The inspector met with the licensee representatives listed in paragraph 1

at the conclusion of the inspection on October 7, 1981 to discuss the

scope and findir.gs of the inspection. On October 16, 1981, a telephone

call between Mr. P. Koltay of this office and Mr. J. Larson, Licensing

Supervisor, the scope and findings of this inspection, as documented in

this report, also were presented.