UNlTED STATES
g#
NUCLEAR REGULATORY COMMisslON
o
[
R EGION I
'
o
g
.j
631 PARK AvENUF
'8
KING OF PRUSSI A. PENNSYt.VANI A 19406
2 5 Ni.1981
- 'S
[
9
o)DLb
,\\
Docket Nos. 50-317
(6f
/,9
'
es
50-318
/f
Of.Qf
hG
-l
U
-
4 0 9 1937,,, 9
'
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
' ' ' g ", %*"
'
,,
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
( j g@
'
~
Gentlemen:
Subject: Combined Inspection Report Nos. 50-317/81-01; 50-318/81-01
This refers to the routine inspection conducted by Mr. R. Baer of this office on
January 5-9, 1981, of activities authorized by NRC License Nos. DPR-53 and
DPR-69 ano to the discussions of our findings held by Mr. Baer with Mr. L. B.
Russell of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
(_45 FR 66754) dated October 7, 1980.
Item A.2 in the Notice of Violation enclosed with this letter was identified
l
during a previous inspection of your licensed activities on October 3-5, 1979,
and was documented in the enclosure to our letters dated November 23,1979 and
'
January 15, 1980. Your lett
to this office dated December 20, 1979 stated the
evaluation was completed as of November 3,1979, and results assigned to the
effected individuals' exposure record.
From our January 5-9, 1981 inspection it
appears that the stated corrective actions were not effective since this item
has not been fully corrected.
Recurrent and uncorrected items of noncompliance are given additional weight in
the consideration and selection of appropriate enforcement action.
Therefore,
in your response to this letter, you should give particular attention to those
actions taken or planned to ensure that identified items of noncompliance will
,
be completely corrected and will not recur.
YO
s
pg}$2g4 %g
//
c
o
Q
l
.
- . _ - .
___
. - _
_
.__
..
.
_
- -_.
.-
_ . _ _ ,
A
e
.
.
Baltimore Gas & Electric Co.
2
2 5 JUN 1981
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
(or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within 25 days from the
date of this letter a written application to this office to withhold such
information.
Consistent with section 2.790(b)(1), any such application
must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons on the basis which it is claimed
that the information should be withheld from public disclosure.
This
section further requires the statement to address with specificity the
considerations listed in 10 CFR 2.790(b)(4).
The information sought to be
withheld shall be incorporated as far as possible into a separate part of
the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public
Document Room.
The telephone notification of your intent to request
withholding, or any request for an extension of the 10 day period which
you believe necessary, should be made to the Supervisor, Files Mail and
Records,USNRCRegionI,at(215)337-5223.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
w/
yd
James H. Joyne , Chief
l
Technical Inspection Branch
Enclosures:
I
1.
Appendix A, Notice of Violation
l
2.
Combined Office of Inspection and Enforcement Inspection
Report Number 50-317/81-01; 50-318/81-01
cc w/encls:
R. M. Douglas, Manager, Quality Assurance
L. B. Russell, Plant Superintendent
T. Sydnor, General Supervisor, Operations QA
l
R. C. L. Olson, Principal Engineer
l
J. A. Tiernan, Manager, Nuclear Power
j
R. E. Denton, General Supervisor, Training and Technical Services
I
I
l