Forwards IE Insp Rept 50-293/81-06 on 810310-13 & Notice of Violation
ML20037D466
Person / Time
Site: Pilgrim
Issue date: 06/22/1981
From: Snyder G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20037D467 List:
References
NUDOCS 8107100269
Download: ML20037D466 (2)


See also: IR 05000293/1981006

Text

.

8

UNITED STATES

E%e

g

NUCLEAR REGULATORY COMMISSION

t

REGION I

ti .

%]'.W..[.,o

9,8

631 PARK AVENUE

8

xima or Pauss:A, PENNSYLVANIA 19406

.

N

Docket No. 50-293

2 2 JUN 1981

h

?

'/

/' G

Boston Edison Company M/C Nuclear

(

ff

ATTN:

Mr. A. V. Morisi

8

Of,

f fA

'a\\

Nuclear Operations Support Manager

U

'J

4,

' , '

800 Boylston Street

'p

0 9 1997 m

Boston, Massachusetts

02199

8gcug,

Gentlemen:

b./h

2

Subject:

Inspection 50-293/81-06

  • k

This refers to the routine safety inspection conducted by Ms. C. Sakenas of

this office on March 10-13, 1981 at Pilgrim Nuclear Power Station, Plymouth

Massachusetts and Boston Edison Offices, Boston, Massachusetts of activities

authorized by NRC License No. DPR-35 and to the discussions of our findings

held by Ms. Sakenas with Mr. Machon and others of your staff at the conclusion

of the inspection, and to a subsequent telephone discussion between Ms.

Sakenas and Mr. Sowdon on March 18 and 27, 1981.

Areas examined during this inspection are described in the Office of Inspection-

and Enforcement Ins;.ection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Our inspector also verified the steps you have taken to correct the item of

noncompliance brought to your attention in the enclosure to our letter

dated January 3, 1979. We have no further questions regarding your action

at this time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This iten of

noncompliance has been categorized into the levels described in tne Federal

Register Notice (45 FR 66754) dated October 7, 1980.

You are required to

respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

[6Db

s/

l/l

8107100269 810622

PDR ADOCK 05000293

G

PDR

l

ll

-

.

.

Boston Edison Company

2

2 2 JUN 1981

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intentiun to file a reque - for withholding;

and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information.

Consistent with section

2.790(b)(1), any suet application must be accompanied by an affidavit

executed by the owne of the information which identifies the document or

part sought to be withheld, and which contains a full statuent of the

reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

a

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

The telephone notification of your

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sinc kely,

'

/

8

Garyhe

nyde , Chi f, Emergency

.

Prepa dness and P4 ogram Support

Branch, Division of Emergency

Preparedness and Operational

Support

Enclosures:

1. Appendix A, Notice of Violation

2. Office of Inspection and Enforcement Inspection

Report Number 50-293/81-06

cc w/encls:

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

- , . . . . . , _ . .

, - - . - -

_.,

.

- . . - . . .

- - . - - . - ..

. .

-

. .-

~ - - .

- -