Text
I TELECOPY MESSA&E TO:
President & Chief Operating Officer TO:
Director of Regulatory Operation Chairman, 5RC USNRC ResIon 1 Seafor Vice President-Muclear Generation 631 Park Avenue King of Prussia, Pennsylvania 194, DATE/ TIME: January 21, 1981 DATE/ TIME:
January 21, IS81 FRDM:
James A. Fir 2 Patrick Nuclear Pcaver Plant P. O. Box 41 co l
e Lycoming, New York 13093 c) 9 g'( f' 's I
quSJECT:
PROMPT REPORTA8LE OC{
- J-L L
00CRET ND.
50-333 s'
JATJ 2 71981 * --
LICINSE NO. CPR-59 11 AssIr.utD OR ND.81-021
-,b "* %Y k LER NO.81-001 4
ronT oATE-January 21,1981l EVENT DATE:
January 21, 1981 nE EVENT DESCRIPTION:
i As port of an investigation into the failure of Safety Relief Valve (SRV) 02-RV-71G to open in response to manual (operator) desnand follow-l Ing a reactor scram and isolation on January 17, 1981, foreign smoterial was found in the SAV solenoid (pilot) valva (02-50V-71G).
'the foreign material has been identified by the vendor representative as excess l
adhesive (Loc-Tite) and 0-ring lubricant used by the vendor during assem6ly. The probless appears to be simiIar to that described in NRC IE Bulletin 80-25. The foreign material has been found in two (2) of eleven (11) solenoid valve pairs installed.
Inspection of the remaining nine (S) solenoid valve pairs with a vendor (Target Rock) representative is in progress.
COMPONENTS INVOLVE 1h I
flain Steam Safety / Relief Valvu (SRV) solenoid (pilot) valves 02-SDV-71 A, B, C, D, E, F, G. H, J, E and L.
,j CAUSE AMD REMEDIAL ACTION:
Cause is believed to be the result of procedural inadequacy of the type refer:
toln75g9.A.I.1.f.
Corrective action will satisfy the requirements of MRC IE t
IN$ 5 N!:
% THERNAL PCuta 0
itoutine Startup Shutden.n X
Routine Shutdce.n-Re fuel ing Steady State Pcwor Other Load Change Not Applicaule l
A wri ctsn follew up report will be sant within two weeks.
.))O IO w him <-
GRd.'W J. PA TERNM i
810 12801%
assioenT n e czR I
b
-- JMES A. FITZPATRICK NECLEAR PouE}- -
- - - - - - - - - - - - - - - - - - - - -