ML20037A656
| ML20037A656 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/07/2020 |
| From: | Robert Kuntz Plant Licensing Branch III |
| To: | Gebbie J Indiana Michigan Power Co |
| Kuntz R | |
| References | |
| EPID L-2019-LLA-0248 | |
| Download: ML20037A656 (18) | |
Text
August 7, 2020 Mr. Joel P. Gebbie Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 - ISSUANCE OF AMENDMENT NOS. 352 AND 333 TO REVISE TECHNICAL SPECIFICATIONS IN ACCORDANCE WITH TSTF-569, REVISE RESPONSE TIME TESTING DEFINITION (EPID L-2019-LLA-0248)
Dear Mr. Gebbie:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment Nos. 352 and 333 to Renewed Facility Operating License Nos. DPR-58 and DPR-74, for the Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2, respectively. The amendments consist of changes to the technical specifications (TSs) in response to your application dated October 31, 2019.
The amendments revise the CNP, Unit Nos. 1 and 2, TSs in accordance with Technical Specifications Task Force (TSTF) Change Traveler TSTF-569, Revise Response Time Testing. A copy of our related safety evaluation is also enclosed. A Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
- 1. Amendment No. 352 to DPR-58
- 2. Amendment No. 333 to DPR-74
- 3. Safety Evaluation cc: Listserv
INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-315 DONALD C. COOK NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 352 License No. DPR-58
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Indiana Michigan Power Company dated October 31, 2019, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-58 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 352, are hereby incorporated in this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: August 7, 2020 Joel S.
Wiebe Digitally signed by Joel S. Wiebe Date: 2020.08.07 14:26:29 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 352 DONALD C. COOK NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE DOCKET NO. 50-315 Renewed Facility Operating License No. DPR-58 Replace the following page of the Renewed Facility Operating License No. DPR-58 with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the area of change INSERT REMOVE Technical Specifications Replace the following pages of the Renewed Facility Operating License, Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
INSERT REMOVE 1.1-3 1.1-3 1.1-5 1.1-5 Renewed License No. DPR-58 Amendment No:332, 334, 335, 336, 337, 338, 343, 344, 345, 346, 347, 348, 349, 350, 351, 352 and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not to exceed 3304 megawatts thermal in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 352, are hereby incorporated in this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Less than Four Loop Operation The licensee shall not operate the reactor at power levels above P-7 (as defined in Table 3.3.1-1 of Specification 3.3.1 of Appendix A to this renewed operating license) with less than four reactor coolant loops in operation until (a) safety analyses for less than four loop operation have been submitted, and (b) approval for less than four loop operation at power levels above P-7 has been granted by the Commission by amendment of this license.
(4) Fire Protection Program Indiana Michigan Power Company shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the licensees amendment request dated July 1, 2011, as supplemented by letters dated September 2, 2011, April 27, 2012, June 29, 2012, August 9, 2012, October 15, 2012, November 9, 2012, January 14, 2013, February 1, 2013,
Definitions 1.1 Cook Nuclear Plant Unit 1 1.1-3 Amendment No. 287, 298, 335, 345, 352 1.1 Definitions dose conversion factors for air submersion listed in Table III.1 of EPA Federal Guidance Report No. 12, 1993, External Exposure to Radionuclides in Air, Water, and Soil.
ENGINEERED SAFETY The ESF RESPONSE TIME shall be that time interval from FEATURE (ESF) RESPONSE when the monitored parameter exceeds its actuation setpoint TIME at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.). Times shall include diesel generator starting and sequence loading delays, where applicable. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
INSERVICE TESTING The INSERVICE TESTING PROGRAM is the licensee PROGRAM program that fulfills the requirements of 10 CFR 50.55a(f).
LEAKAGE LEAKAGE shall be:
- a.
Identified LEAKAGE
- 1.
LEAKAGE, such as that from pump seals or valve packing (except reactor coolant pump (RCP) seal water injection or leakoff), that is captured and conducted to collection systems or a sump or collecting tank,
- 2.
LEAKAGE into the containment atmosphere from sources that are both specifically located and known either not to interfere with the operation of leakage detection systems or not to be pressure boundary LEAKAGE, or
- 3.
Reactor Coolant System (RCS) LEAKAGE through a steam generator to the Secondary System (primary to secondary LEAKAGE);
- b.
Unidentified LEAKAGE All LEAKAGE (except RCP seal water injection or leakoff) that is not identified LEAKAGE; and
Definitions 1.1 Cook Nuclear Plant Unit 1 1.1-5 Amendment No. 287, 352 1.1 Definitions RATED THERMAL POWER RTP shall be a total reactor core heat transfer rate to the (RTP) reactor coolant of 3304 MWt.
REACTOR TRIP SYSTEM The RTS RESPONSE TIME shall be that time interval from (RTS) RESPONSE TIME when the monitored parameter exceeds its RTS trip setpoint at the channel sensor until loss of stationary gripper coil voltage. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
SDM shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:
- a.
All rod cluster control assemblies (RCCAs) are fully inserted except for the single RCCA of highest reactivity worth, which is assumed to be fully withdrawn. With any RCCA not capable of being fully inserted, the reactivity worth of the RCCA must be accounted for in the determination of SDM; and
- b.
In MODES 1 and 2, the fuel and moderator temperatures are changed to the nominal zero power design level.
SLAVE RELAY TEST A SLAVE RELAY TEST shall consist of energizing all slave relays in the channel required for channel OPERABILITY and verifying the OPERABILITY of each required slave relay.
The SLAVE RELAY TEST shall include a continuity check of associated required testable actuation devices. The SLAVE RELAY TEST may be performed by means of any series of sequential, overlapping, or total steps.
STAGGERED TEST BASIS A STAGGERED TEST BASIS shall consist of the testing of one of the systems, subsystems, channels, or other designated components during the interval specified by the Surveillance Frequency, so that all systems, subsystems, channels, or other designated components are tested during n Surveillance Frequency intervals, where n is the total number of systems, subsystems, channels, or other designated components in the associated function.
INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-316 DONALD C. COOK NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 333 License No. DPR-74
- 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Indiana Michigan Power Company dated October 31, 2019, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-74 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 333, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: August 7, 2020 Joel S.
Wiebe Digitally signed by Joel S. Wiebe Date: 2020.08.07 14:27:50 -04'00'
ATTACHMENT TO LICENSE AMENDMENT NO. 333 DONALD C. COOK NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE DOCKET NO. 50-316 Renewed Facility Operating License No. DPR-74 Replace the following page of the Renewed Facility Operating License No. DPR-74 with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the area of change.
INSERT REMOVE Technical Specifications Replace the following pages of the Renewed Facility Operating License, Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
INSERT REMOVE 1.1-3 1.1-3 1.1-5 1.1-5 Renewed License No. DPR-74 Amendment No. 313, 314, 316, 317, 318, 319, 320, 325, 326, 327, 328, 329, 330, 331, 332, 333 radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not to exceed 3468 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to the renewed operating license.
The preoperational tests, startup tests and other items identified in Attachment 1 to this renewed operating license shall be completed. Attachment 1 is an integral part of this renewed operating license.
(2) Technical Specifications The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 333, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Additional Conditions (a) Deleted by Amendment No. 76 (b) Deleted by Amendment No. 2 (c) Leak Testing of Emergency Core Cooling System Valves Indiana Michigan Power Company shall prior to completion of the first inservice testing interval leak test each of the two valves in series in the
Definitions 1.1 Cook Nuclear Plant Unit 2 1.1-3 Amendment No. 269, 279, 317, 327, 333 1.1 Definitions dose conversion factors for air submersion listed in Table III.1 of EPA Federal Guidance Report No. 12, 1993, External Exposure to Radionuclides in Air, Water, and Soil.
ENGINEERED SAFETY The ESF RESPONSE TIME shall be that time interval from FEATURE (ESF) RESPONSE when the monitored parameter exceeds its actuation setpoint TIME at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.). Times shall include diesel generator starting and sequence loading delays, where applicable. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
INSERVICE TESTING The INSERVICE TESTING PROGRAM is the licensee PROGRAM program that fulfills the requirements of 10 CFR 50.55a(f).
LEAKAGE LEAKAGE shall be:
- a.
Identified LEAKAGE
- 1.
LEAKAGE, such as that from pump seals or valve packing (except reactor coolant pump (RCP) seal water injection or leakoff), that is captured and conducted to collection systems or a sump or collecting tank,
- 2.
LEAKAGE into the containment atmosphere from sources that are both specifically located and known either not to interfere with the operation of leakage detection systems or not to be pressure boundary LEAKAGE, or
- 3.
Reactor Coolant System (RCS) LEAKAGE through a steam generator to the Secondary System (primary to secondary LEAKAGE);
- b.
Unidentified LEAKAGE All LEAKAGE (except RCP seal water injection or leakoff) that is not identified LEAKAGE; and
- c.
Pressure Boundary LEAKAGE LEAKAGE (except primary to secondary LEAKAGE) through a nonisolable fault in an RCS component body, pipe wall, or vessel wall.
Definitions 1.1 Cook Nuclear Plant Unit 2 1.1-5 Amendment No. 269, 333 1.1 Definitions RATED THERMAL POWER RTP shall be a total reactor core heat transfer rate to the (RTP) reactor coolant of 3468 MWt.
REACTOR TRIP SYSTEM The RTS RESPONSE TIME shall be that time interval from (RTS) RESPONSE TIME when the monitored parameter exceeds its RTS trip setpoint at the channel sensor until loss of stationary gripper coil voltage. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
SDM shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:
- a.
All rod cluster control assemblies (RCCAs) are fully inserted except for the single RCCA of highest reactivity worth, which is assumed to be fully withdrawn. With any RCCA not capable of being fully inserted, the reactivity worth of the RCCA must be accounted for in the determination of SDM; and
- b.
In MODES 1 and 2, the fuel and moderator temperatures are changed to the nominal zero power design level.
SLAVE RELAY TEST A SLAVE RELAY TEST shall consist of energizing all slave relays in the channel required for channel OPERABILITY and verifying the OPERABILITY of each required slave relay.
The SLAVE RELAY TEST shall include a continuity check of associated required testable actuation devices. The SLAVE RELAY TEST may be performed by means of any series of sequential, overlapping, or total steps.
STAGGERED TEST BASIS A STAGGERED TEST BASIS shall consist of the testing of one of the systems, subsystems, channels, or other designated components during the interval specified by the Surveillance Frequency, so that all systems, subsystems, channels, or other designated components are tested during n Surveillance Frequency intervals, where n is the total number of systems, subsystems, channels, or other designated components in the associated function.
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 352 AND 333 TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-58 AND DPR-74 INDIANA MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-315 AND 50-316
1.0 INTRODUCTION
By application dated October 31, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19310D766), Indiana Michigan Power Company (the licensee) submitted a license amendment request (LAR) for the Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (CNP). The amendments would revise technical specification (TS) definitions for engineered safety feature (ESF) response time and reactor trip system (RTS) response time that are referenced in surveillance requirements (SRs), hereafter, referred to as response time testing (RTT).
The proposed changes are based on Technical Specifications Task Force (TSTF) traveler TSTF-569, Revision 2, Revise Response Time Testing Definition, dated June 25, 2019 (ADAMS Accession No. ML19176A034). The U.S. Nuclear Regulatory Commission (NRC or the Commission) issued a final safety evaluation (SE) approving TSTF-569, Revision 2, on August 14, 2019 (ADAMS Accession No. ML19176A191). The description of the generic changes and their justification are contained in these two documents.
2.0 REGULATORY EVALUATION
2.1 Description of Response Time Testing The RTS initiates a unit shutdown, based on the values of selected unit parameters, to protect against violating the core fuel design limits and the reactor coolant system (RCS) pressure boundary during anticipated operational occurrences and to assist the engineering safety feature actuation system (ESFAS) in mitigating accidents. The ESFAS initiates necessary safety systems, based on the values of selected unit parameters, to protect against violating core design limits and the RCS pressure boundary and to mitigate accidents.
RTT verifies that the individual channel or train actuation response times are less than or equal to the maximum values assumed in the accident analyses. The RTT acceptance criteria are under licensee control. Individual component response times are not modeled in the accident analyses. The analyses model the overall or total elapsed time, from the point at which the parameter exceeds the trip setpoint value at the sensor to the point at which the equipment reaches the required functional state (e.g., control and shutdown rods fully inserted in the reactor core).
2.2 Proposed Changes to the Technical Specifications CNP Limiting Condition for Operation (LCO) 3.3.2 requires the ESFAS instrumentation for each Function in TS Table 3.3.2-1 "Engineered Safety Feature Actuation System Instrumentation" to be OPERABLE. To assure the LCO is met, surveillance requirement (SR) 3.3.2.12 requires the licensee to verify that ESF RESPONSE TIMES are within limits. Similarly, CNP LCO 3.3.1 requires the RTS instrumentation for each Function in TS Table 3.3.1-1 "Reactor Trip System Instrumentation" to be OPERABLE, and SR 3.3.1.19 requires the licensee to verify that RTS RESPONSE TIMES are within limits. Section 1.1 of the TS define "ENGINEERED SAFETY FEATURE (ESF) RESPONSE TIME" and "REACTOR TRIP SYSTEM (RTS) RESPONSE TIME," state acceptable means to measure each response time, and provide an alternative that may be used "[i]n lieu of measurement."
THe LAR stated that it requests adoption of NRC-approved TSTF-569, "Revise Response Time Testing Definition." The only revision of TSTF-569 that is NRC-approved is Revision 2. As described in Section 1. "Summary Description" of Revision 2 of TSTF-569:
The proposed change revises the definitions to eliminate the requirement for prior NRC review and approval of the response time verification of similar components, while retaining the requirement for the verification to be performed using the methodology contained in Attachment 1, titled, "Methodology to Eliminate Pressure Sensor and Protection Channel (for Westinghouse Plants only) Response Time Testing." The proposed change will permit licensees to verify the response time of similar component types using the methodology contained in Attachment 1, without obtaining prior NRC approval for each component.
Accordingly, as shown in the LAR, the request would add an additional "in lieu of measurement" alternative to measuring ESF RESPONSE TIME and RTS RESPONSE TIME. The additional alternative for ESF RESPONSE TIME would be "[i]n lieu of measurement, response time may be verified for selected components provided... the components have been evaluated in accordance with an NRC approved methodology." Similarly, for RTS RESPONSE TIME, "[i]n lieu of measurement, response time may be verified for selected components provided that...
the components have been evaluated in accordance with an NRC approved methodology."
The application stated that the licensee concluded that the justifications presented in TSTF-569 and the safety evaluation prepared by the NRC staff are applicable to CNP and provide the justifcation for the amendent request. The application identifed the requested variations (e.g.,
identifiying the site-specific TS numbers).
2.3 Applicable Regulatory Requirements and Guidance Under 10 CFR 50.90, whenever a holder of a license wishes to amend the license, including technical specifications in the license, an application for amendment must be filed, fully describing the changes desired. Under 10 CFR 50.92(a), determinations on whether to grant an applied-for license amendment are to be guided by the considerations that govern the issuance of initial licenses to the extent applicable and appropriate. Both the common standards for licenses in 10 CFR 50.40(a), and those specifically for issuance of operating licenses in 10 CFR 50.57(a)(3), provide that there must be reasonable assurance that the activities at issue will not endanger the health and safety of the public, and that the applicant will comply with the Commission's regulations.
The licensee's request involves adding an option used to satisfy surveillance requirements. As described in 10 CFR 50.36(c),
Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
3.0 TECHNICAL EVALUATION
The staff reviewed the request by comparing the licensees proposal against the changes described in TSTF-569. In particular, the staff assessed whether or how the variations identified by the licensee affect the applicability of NRC-approved TSTF-569. To make this assessment, the staff compared CNPs design and existing TS with the design and TS presumed in TSTF-569. As explained below, the staff concluded that the design and licenses (including TS) were sufficient to justify the licensee's reliance on the staff's safety evaluation of TSTF-569 as justification for adopting TSTF-569 in the CNP licenses.
TSTF-569 is designed to make changes to NUREG-1431, Revision 4.0, Standard Technical Specifications, Westinghouse Plants, April 2012, Volume 1, Specifications (ADAMS Accession No. ML12100A222), and Volume 2, Bases (ADAMS Accession No. ML12100A228).
The technical specifications for CNP are based on the older Revision 2 of the standard technical specifications (see ADAMS Package Accession No. ML051520259 (issuing amendments for the conversion to Improved Technical Specifications with certain beyond-scope items). The staff compared the technical specifiations assumed in TSTF-569 with the current technical specifications for CNP. The staff did not identify any material differences in the relevant technical specifications.
The TSTF-569 traveler is written for a plant design based on the General Design Criteria (GDC) in Appendix A to 10 CFR Part 50 that establish minimum requirements for the principal design criteria for water-cooled nuclear power plants similar in design and location to plants for which construction permits have been issued by the Commission. However, as stated in CNP Update Safety Analysis Report (USAR) Section 1.4, CNP was designed and constructed to meet the intent of the Proposed General Design Criteria [GDCs], published by the Atomic Energy Commission (AEC) in the Federal Register (FR) on July 11, 1967 (32 FR 10213), i.e., prior to the GDC being published in Appendix A to 10 CFR Part 50. The staff compared the design assumptions used in the evaluation of TSTF-569 with the design of CNP. The staff did not identify anything unique in the design of CNP that would preclude the licensee's reliance on the staff's evaluation of TSTF-569.
The licensee is relying on the previous analyses of TSTF-569. For the reasons stated in staff's SE for TSTF-569, the staff found that the methodology contained in TSTF-569, Rev. 2,, "Methodology to Eliminate Pressure Sensor and Protection Channel (for Westinghouse Plants only) Response Time Testing" provides a consistent, clear, and concise framework for determining that replacement components will operate at a level equivalent to that of the components being replaced. As such, using that methodology will assure that the necessary quality of the components is maintained and that the limiting conditions for operation will be met. Accordingly, approving the incorporation of that methodology into the licensing basis, and amending the TS to allow usage of the approved methodology, coupled with approving the aspect of the license amendment request to use the methodology in TSTF-569, Rev. 2, Attachment 1 methodology, results in TS that meet 10 CFR 50.36(c)(3) by assuring that performing SR 3.3.1.19 and 3.3.2.12 while using the new "[i]n lieu of" option, will assure that associated aspects of LCO 3.3.1 and 3.3.2 will be met.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the State of Michigan official was notified of the proposed issuance of the amendments on February 4, 2020. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change the requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes a surveillance requirement. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration in the Federal Register on October 8, 2019 (84 FR 53772), and there has been no public comment on such finding.
Accordingly, the amendments meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: Kristy Bucholtz, NRR Date of issuance: August 7, 2020
- via e-mail OFFICE NRR/DORL/LPL3/PM*
NRR/DORL/LPL3/LA*
NRR/DEX/EICB/BC*
NRR/DSS/STSB/BC*
NAME RKuntz SRohrer MWaters VCusumano DATE 02/13/2020 02/12/2020 02/20/2020 01/03/2020 OFFICE OGC NLO*
NRR/DORL/LPL3/BC*
NRR/DORL/LPL3/PM*
NAME DRoth NSalgado (JWiebe for)
RKuntz DATE 08/05/2020 08/07/2020 08/07/2020