ML20037A634
| ML20037A634 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/02/1972 |
| From: | Faulkner H US ATOMIC ENERGY COMMISSION (AEC) |
| To: | US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20037A627 | List: |
| References | |
| NUDOCS 8003250644 | |
| Download: ML20037A634 (1) | |
Text
_
/./
\\
q&
^
' Docket No.30-302 JUN 2 472 NOTE TO FILES
~
Ev neans of_corresoondence dated May 30. 1972, Florida Power Corcoration requested an extension of tire f rom June 1, 1972 :n March 31, 1975 for completion of Crystal River Unit 3, as covered by Provisional Construction Permit No. CPPR-51. The extension date corresoonds to the anolicant's estimate for latest corrercial coeration of the olant. The aeolicant's estimate for latest fuel loading was stated to be Decerber,1974.
By reans of a telecon we incuired as to the best estinate fuel _ loading date for Crystal itiver Unit 3.
J. Hancock of Floride Power Corcerstion, I
with J. Rodgers' concurrence, identified the best esticate fuel loadine date as Scotember 30, 1974 An order extending the Construction Perrit comoletten date for this unit to September 30, 1974, correspendine to the applicant's best estirate fuel loading date, was issued by tho 1.EC on June 1,1472, h4 fill 3
\\
_1 y
i u.i
...t. v '.. g H. ' J. Faulkner, Proj ect le3 tar P'?R/ Branch No. 4 Directorate of Licensine cc:
Oceket PiiR-4 Readine DL Readine A. Schwencer, L R.-C. DeYoung, L H. Faulkner, L F. Karas, L c)
YO_
800s250[W-
.