ML20037A612

From kanterella
Jump to navigation Jump to search
Tech Specs 3.7.11.2 & 4.7.11.2 for Deluge & Sprinkler Sys. Page for Amend 13 to License DPR-72
ML20037A612
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/23/1978
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20037A611 List:
References
NUDOCS 8003240924
Download: ML20037A612 (1)


Text

^<s

.(])

PLANT SYSTEMS j

DELUGE AND SPRINKLER SYSTEMS i

LIMITING CONDITION FOR OPERATION 3.7.11.2 The deluge and sprinkler systems shown in Table 3.7-4 shall be OPERABLE.

APPLICABILITY: Whenever equipment in the deluge / sprinkler protected areas is required to be OPERABLE.

ACTION:

a.

With one or more of the above required deluge and sprinkler systems inoperable, establish a continuous fire watch with backup fire suppression equipment for the unprotected area (s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; restore the system to OPERABLE status within 14 days or, in lieu of any other report required by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days out-lining the action taken, the cause of the inoperability and the plans and schedu!e for restoring the system to OPERABLE status.

b.

The provisions of Specification 3.0.3 anc 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS

(

4.7.11.2 Each of the chove required deluge and sprinkler systems shall be l

demonstrated OPERABLE:

f a.

At least once per 12 months by cyclin; ("ch te table valve in i

the flow path through at least one cr2nplete ce;;e of full travel.

b.

At least once per 10 months:

1.

By performing a system functional test which inciudes simulated automatic actuation of the system, and:

a)

Verifying that the automatic valves in the flow path actuate to their correct po:itions.

800824o 7 27 CRYSTAL RIVER - UNIT 3 3/4 7-41 Amendment No.13

,,.,r.,,.

_r

,.-,-,y~.......,,,,

,_,,.,,m,

--.,,.