ML20035D924
| ML20035D924 | |
| Person / Time | |
|---|---|
| Issue date: | 03/27/1992 |
| From: | Blaha J NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Fraley R Advisory Committee on Reactor Safeguards |
| Shared Package | |
| ML20035D884 | List: |
| References | |
| ACRS-2812, NACNUCLE, NUDOCS 9304140117 | |
| Download: ML20035D924 (6) | |
Text
_
~,.
tw 17 mz15:DJr:
/
UNITED STATES NUCLEAR REGULATORY COMMISSION 2
o 3
2 WA4MiseGTON D. C. 20004
'59.....
March 27, 1992 MEM0RANDUM FOR:
R. F. Fraley, Executive Director
-l Advisory Committee on Reactor Safeguards FROM Jasoc L. Riaha, Assistant for Operations office of the Executive Director for Operations
SUBJECT:
PROPOSED AGENDA IThMS FOR IHh ACMb ANU IMt At,NW Enclosed is a listing of proposed agenda items for the ACRS for the months of 1
May
.luly 1417. Also, nnclosed is a listing of the proposed ACitW agenda items for May - October 1992.
If any of these items are of no or limited interect to the committees, or should be relegated to subcommittees I woult!
appreciate your views.
I understand the next ACRS meeting will be May 7'- 9, 1992 and the ACNW j
will meet on Mry 28 - 29, 1992.
J We have enclosed an annotated copy or our Wok items Tracking System (WITC) tor the upcoming Litree monta period.
In acc1 tion, we nave provided a projwc-l g
tion of' office originated Countission papers that any alsn he of internt to the ACRS/ACmi. If there are particular items identified out of the field of 1
projected Commission papers that we had not planned to brin for formal review or briefing, but that are of Committee (s)g to the ACRS/ACNW interest, we-I would appreciate receiving timely feedback on such preferences.
^
W s L. Blaha A istant for Operations fice of the Executive Director for Operations
Enclosure:
As stated 1
h-N 9304140117 920531 PDR ACRS 2812 PDR I
1 4
MY Titi?ftssue Furpose Priority Related Documents
,61-806, Piping and Use of.
Proposed Package to 82e provided MighlyCogstib*eGasesin Review by early April 1992.
g Vits1 Arets.(Kreil)
/ ANP1 an Part 56 rule change on Request ACRS liigh (RES)
ANPR to be provided by early T
SevereAccifentsfContainment Review April 1992.
g, P;rfoemence Cr-teria (T. King) 3 Regulatorv Gutees Implementing (See Footnote)*
iigh (RES)
(See Footnote)
Part 20 (D. Cool)
Prepcsed Minition of Large Request ACRS Bigh (RES)
Package to be provided by early R21:ese for Safety Goal (T. Klag) Review to mid April 1992.
Evtit.atica of Test Program:
Request ACRS Higt (MRR/
Proposed Commission Paper was GE Pa.ssive Smet (A. Thadant/
Review RES}
provided to ACRS.
- 8. Sheron) cContinu'ng ageoda entry - ACRS/ACNW review process has pmceeded as described in SECY-gt-023 and by the Msy 30, 1991 meno from D. Moeller. ACNW, to Commissioner Rogers. ACRS/ACNW casaments have t een received.
en proposed t.G.s Staff stands ready to continue with ary A RS/ACNbi briefing and review needs on those R.G.s issued for pubile -nt.
y
t
+
MAY - continued Titf2/ Issue Purpose Priority Related Documents Devalopment of Regulatory Guide Inforsation Medium (RES)
Draft of R.G. provided in for Maintamance Rule (R. Baer)
Briefing January 1997.
Revised draf t to be provided by the end of March.
Pr yosed Changes to Reporting Infonasti on Medium (AE00)
Package to be provided in t
- RHputremerts 10 CFR 50.72 and triefing April !!12.
I' I
2 5C.73 (T. Novak)
Status of PTS Issue (W. Butler)
Infomattom Low (NRR)
Commission papers SECY-91-374 triefing and SEC'-91-414 provided.
R:sults of Pilot Slaulator Infonnetton Low (NRR)
Commission paper has been Extainottan Program (R. Gallo)
Briefing provided to ACR5.
Status of Standard Review Plan Infor1stion Low (NRR)
Implementing Procedures Docurwnt UMato ard Development Program Briefing was provided to ACRS.
(5. Rajwa) 4 9
I 1
1 Il '
l i
L es w
J. --. -
y
'.s JUNE n gose Irfo-ity Related Doctments j
e Tit 10/ Issue
/ EPRI Passive Design DSER
Paper to be provided by mid 0
A r11 1992.
(J. Wilson)
- etfew P
Fcreat and Content Guide for
- essest ACR5 M19h (NRR)
Pater to be prog ided by early v
DesignCertification(T.Soyce) tr iew April 1992.
Revisit-n.to NUEEG-1365, Severe Reguest ACR5 Fedissa (RES)
Drift to be progided by early 1' i
g LAccident Research Program Plan Re-iew May 1992.
-(Eltaw'la)
Proposed Revisions to Part 26, h: guest ACRS 1edium (NIG)
Package to be provided early Fitness.for Du*.y Programs briew April 1992.
-(L. Bush)
Stetzs of ITAC (T. toyce)
Edorettion Med' um (MhR)
Paaer to be prooided by late Erief teg April 1992.
Th2 Onsite Analysis of the
]nformation 14edium (A[OO) - Colunission I-riefing Paper to be Human acters of Operating triefing provided in May 1992.
Ev: ts (T. Novak)
Pilgrili Emergency Response Plan
- rfonmation Low (NRR)
NtstEG-1238 Provided to ACRS.
Demonstration (R. Erickson)
Se lef13 se N
q JULT Titl'/ Issue Purpose Priority Related Docume nts Ti Meeting with the Director for Discuss matters of liigh (EDO)
None Analysis and Evaluation of general interest
'.t:
_ Operational Data E
R;gulat;;ry Analysis GuWellnes, Request ACRS High (RES)
Package to be prosided as sct n
-Rev. 2 (S. Saha& r)
Review as practicable.
It hinges t r.
f, resole. ton of safet,v goal implementation and guidance en,,
F person-rem valuatio1.
EPRI Evolutionary Design FSER Request ACRS High (MRF)
Paper to be provide:1 mid Ma,- 1992.
~(J. Wilsoi)
Review i
G e
Y e
=---
g-
+m-M w-
+. -
e a---g w
--e
+
-w----
-?
t+
r
7 ACNW Titl^/Isste Purpose Priority Related Documents j
Regulatory Evides luglementing (SeeFootnote)*
High (RES)
(See Footnote) if ftrt 20 (s. Cool) 6 proposed Chtages to 10 CFR para Request AClei High(RES)
Proposed Cossaission Paper has beenp 22 E, for ISFSI and MRS (Ader/
Review provided to ACNW.
p Jampochian) folemaktap Controlled-Use Request ACNJ High (NRSS)
Draft Rulemaking Package to be provided 1.rea/ Design Basis Accident Comments by April 22, 1992.
Iose Limit."M. I.ee)
,. une Bone
$dl technical position on Repository Request AC)W Medium (MSS)
Draf t Techn' cal Position to be provided
)esign: Thermal Loads (M. Lee /
Comuments by June 30, 1992.
- 3. Gupta) cContinuing agenda entry - ACl5/ACiel review p ocess has proceeded as described in SECY-91-023 and by the May 30,1991 meno from D. Moslier, ACSW. to Commissioner Rogers. ACRS/ACIRI comments have been received on proposed R.G.s Staff states ready to continue with any ACRS/ACNW briefing and r6 view needs on those R.G.s 15 seed for public cessent.
l 1
Q
-