Forwards Safety Insp Rept 50-219/90-06 on 900218-0317 & Notice of Violation.Events Show Importance of Timely & Effective Implementation of Performance Improvement Plans in Area of Radiological Controls
ML20034B865
Person / Time
Site: Oyster Creek
Issue date: 04/20/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20034B866 List:
References
NUDOCS 9005010090
Download: ML20034B865 (2)


See also: IR 05000219/1990006

Text

0;u

y

ga

,

' y g4

K

a

,

..

.

s

i

p

y

,

Y

"

APR 2 01990

'

,

H

Docket No.~ 50-219

-

License No. 50-DPR-16

'GPU Nuclear Corporation

<

~ ATTN: Mr. Eugene E. F1tzpatrick

l

Vice President.and Director..

- >

Oyster Creek Nuclear. Generating Station

4

P.O. Box 388-

,

Forked River, New Jersey 08731

}

Gentlemen:

>

Subject:

Inspection Report No. 50-219/90-06-

j

This letter refers to the- routine safety inspection conducted'by M. Banerjee,

n

E. Collins, D. Lew and W.7 Pasciak for the period February!18 through March 17,

1990,'at the;0yster Creek Nuclear Generating Station.-- The inspection consisted

of document reviews, personnel interviews and observations ofc activities. .The

i

enclosed report documents the inspection results.

Inspectors discussed the-

.'

findings with you and members'of your staff after the inspection.

Paragraphs 1.2 and 1.5 discuss operational events where plant equipment was.

4

degraded or misaligned.

In the first event, a fire protection system trouble

t

alarm was not addressed in a timely manner.

In the;second event,-inadequate.

'

.-procedures and operator errors allowed a startup to be conducted with the rod.

worth minimizer bypassed. These-events show a' continuing need to emphasize to

plant personnel the importance of prompt' identification and correction of de-

ficient conditions, including procedural weaknesses.

,

t

Paragraphs 2.1 and 2.2_of this report discuss radiological control events which

'

I

highlight some important-weaknesses. -In the first event, maintenance was

'

.

performed without completing a formal ALARA review.

Poor coordination between

j

the radiological controls group and the maintenance group resulted.in a lack of

understanding of the scope of the. work and an incomplete ALARA review.

In the

second event, radioactive contamination was identified in a'normally nonradio-

'

active system.

However, no safety evaluation was performed or corrective

actions initiated to control or monitor potential release points until an

('

unplanned release of a small amount of radioactive liquid offsite. Both events

show the importance of timely and effective implementation of your performance

improvement plans in the area of radiological controls.

Based on the results of this inspection, four of-your activities were not con-

ducted in full compliance with NRC requirements, as set forth in the Notices

of Violation enclosed herewith as Appendix A.

The violations have been cate-

gorizei by severity level in accordance with the " General Statement of Policy

~

I

and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforce-

ment Policy). You are required to respond to this letter and in preparing your

,

'

response you should follow the instructions in Appendix A.

OFFICIAL RECORD COPY

IR OYC 90-06 - 0001.0.0

I

i

11/29/80

-

9005010090 900420

PDR

ADOCK 03000219

i

O

PDC

..

-

'

)

[.

'

~

._~E

,

.

APR 2 01990

'

GPU Nuclear Corporation

2

I appreciate your cooperation with us in these matters.

Sincerely,

Original Signed'By:

Edward C.'Wenzinger, Chief

,

Projects Branch No. 4'

Enclosures:

1.

Appendix A,' Notice of Violation

2.

NRC Region I Report No. 50-219/90-06

cc w/encls:

BWR Licensing Manager.

Licensing Manager, Oyster Creek

Public Document Room (PDR)

local Public Document Room (LPDR)

- Nuclear Safety Information Center (NSIC)

j

.

NRC Resident Inspector

State of New Jersey

bec w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

Branch Chief, DRSS, FRSS

DRP.Section Chief

DRP Deputy Director (executive summary only)

DRP Director (executive summary only)

-

. DRS Director (exeutive summary only)

,

DRSS Director (executive summary only)

James Caldwell, ED0

'

i

!

4

RI:DRP

gddRI:DRP*($^'

-

-

Hernan(M

Haverka,p 8

E Weginj ee^

p,

g

'f; .M [7)

Y/Ak90

04/p/90

04/$P90

0FFICIAL RECORD COPY

IR OYC 90-06 - 0002.0.0

I

11/29/80

l