Forwards Safety Evaluation Accepting Util 900321 Proposed Revised Capsule Withdrawal & Insertion Schedule
ML20034B198
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/19/1990
From: Silver H
Office of Nuclear Reactor Regulation
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20034B199 List:
References
TAC-76364, NUDOCS 9004260157
Download: ML20034B198 (2)


Text

_

~

April 19, 1990 Docket No. S0-302 Mr. Percy M. Beard, Jr.

Senior Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Operations Licensing P.O. Box 219-NA-21 Crystal River, Florida 32629

Dear Mr. Beard:

SUBJECT:

CRYSTAL RIVER UNIT 3 (CR-3)-CAPSULE WITHDRAWAL SCHEDULE (TAC No. 76364)

By letter dated March 21, 1990, Florida Power Corporation (FPC) requested approval of a revised capsule withdrawal and insertion schedule for CR-3.

Based on our review of your submittal, as summarized in the enclosed Safety Evaluation, we conclude that the revised schedule is acceptable.

This completes our effort on TAC No. 76364.

Sincerely, Original S1 ned By 6

Harley Silver, Project Manager -

Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

,DISTRIBbfLON:

Docket File.

E. Jordan NRC & L6 cal PDRs ACRS (10)

PD22 Rdg. File CYCheng S. Varga G. Lainas 1

H. Silver OGC Y==%

OFC

LA:PDII-2
900W7
0:PDII-2

<::.J...............

NAME $

k7h fliSil/er: 51

$HBerkod e

..................................,...q

. g...............................................

DATE :4/f[/90

4/l9/90
4/M/90 OFFICIAL RECORD COPY Document Name:

CR3 CAPSULE 9004260157 900419 ADOCK 0500 g,DR

ft

g Mr. Percy M. Beard, Jr.

- Florida Power Corporation Crystal River Unit No. 3 Nuclear

^

Generating Plant ec:

Mr. A. H. Stephens General Counsel State Planning and Develooment Florida Power Corporation Clearinghouse MAC - A50 Office of Planning and Budget P. O. Box 14042 Executive Office of the Governor-The Capitol Building St. Petersburg, Florida 33733 Tallahassee, Florida 32301 Mr. P. F. McKee, Director Chairman Nuclear Plant Operations Florida Power Corporation Board of County Commissioners P. O. Box 219-NA-2C Citrus County 110 North Apopka Avenue Crystal River, Florida 32629 Inverness, Florida 32650 Mr. Robert B. Borsum Babcock & Wilcox Mr. Rolf C. Wide 11, Director Nuclear Operations Site Support Nuclear Power Generation Division Florida Power Corporation 1700 Rockville Pike, Suite 525 P.O. Box 219-NA-21 Rockville, Maryland 20852 Crystal River, Florida 32629' Senior Resident Inspector Crystal River Unit 3 Mr. Gary L Boldt U.S. Nuclear Regulatory Commission Vice President, Nuclear Production 15760 West Powerline Street Florida Power Corporation =

P. O. Box 219-SA-2C Crystal River, Florida 32629 Crystal River, Florida 32629 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Administrator Department of Environmental Regulation Power Piart Siting Section State of i'.orida 2600 Blair Stone Road Tallahassee, Florida 32301 Attorney General Department of legal Affairs The Capitol Tallahassee, Florida 32304

.