April 11, 1990 Docket No.
50-400 Mr. Lynn W, Eury Executive Vice President Power Supply Carolina Power & Light Company Post Office Box 1551 Raleigh, North Carolina 27602
Dear Mr. Eury:
SUBJECT:
WAKE 50VTH REGIONAL AIRPORT - SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 (TAC NO. 74338)
At our request, Carolina Power & Light Company (CP&L) submitted the results of i
their aircraft hazards study associated with the proximity of the proposed WakeSouth Regional Airport (WakeSouth) to'the Shearon Harris Nuclear Power Plant, Unit 1, (Harris) (January 17, 1990 letter from A. Cutter).
By letter i
dated March 6,1990. Mr. Cutter advised the NRC that CP&L believes no
+
further information requiretients or regulatory actions are pending with the NRC on the WakeSouth issue.
We are currently performing a review of the data and methodology used in the hazards study described in the January 17, 1990 submittal.
When we have concluded our review, we intend to forward our comments to you.
We plan no further regulatory action at this time.
However, we would like to note that the introduction of a new external hazard or the modification of an existing external hazard in the vicinity of any licensed nuclear power plant is of concern to the NRC and may require regulatory action relative to the plant when that hazard is deemed to i
be a significant contributor to risk.
Sincerely, Original Signed By:
Steven A. Varga, Director Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION See attached page
- SEE PREVIOUS CONCURRENCES 9004200729 900411 PDR ADOCK 05000400 P
FDC 0FC : LAPDII-1 * : PM: PDil-1
~li:PDII-1
- 0GC:
- ADR2:NRR"
- D:DRP:N R 3- ---:-----------
NAME$PAnderson
- RBecker:sw :EAdensam hMi /
- Glainas i
............................... : - - -- - - - - - - - h / > / 9 0
- 3/8/90
/90 DATE$3/.23/90
$3/ /90
- 3/ /90 k
OFFICIAL RECORD COPY l
Document Name: -LTR2 EURY 74338 d
o Mr. L. W. Eury Carolina Power & Light Conpary Shearon Harris CC' Mr. R. E. Jones, General Counsel Regional Administrator, Region 11 Carolina Power & Light Company U.S. Nuclear Regulatory Concission P. O. Box 1551 101 Marietta Street Raleigh, North Carolina 27002 Suite 2900 Atlanta, Georgia 30323 Resident Inspector / Harris NPS c/o U. S. Nuclear Regulatory Consnission W. C. S. Hinnant toute 1, Box 310B Plant General Manager New Hill, North Carolina 27562 Harris Nuc1ccr Plant P. O. Box 105 Mr. R. B. Richey, Panager Nw Hill, North Carolina 27562 Harris Nuclear Project Harris Luclear Plant Mr. Dayne H. Brwn, Director P. O. Box 165 Division of Raciation Protection New Hill, North Carolina 27562 N. C. Department of Environmental, Commerce & Natural Resources Mr. H. A. Cole P. O. Box 27687 Special Deputy Attorney General Raleigh, North Carolina 27611-7687 State of North Carolina P. O. Box 629 Raleigh, North Carolina 27002 l
~
y f-i 4-v~
t DISTRipuTION-DecheerfMe" NRC POR.
-Local PDR:.
S..Varga-14.g.4
- 6. Lainas 14.g.3
- E.' ~ Adensem -
14.g.20 P. Anderson 14 3 20-R. Becker 06C-(ForInform.Only)
. 14.g.20:
- 15818 E. Jcrden MN8B.3302
.ACRS (10)-
P.315 l.
d.
9..
I i
l,i I -_
O, N
1 i
't l-l.)
.i~
I 3
3
M f
.