Text
,
_
_
'
'
J/el/o uS
-
,
g%
, & ]to, , .
Carolina Power and Light Company
b
Wt
ATTN: Mr. J. A. Jones, Senior Executive
Q,
/j e,,
-
Vice President and Chief
gy
['f ~ q
3
operating Officer
OEg7
-
411 Fayetteville Street
/p
k , u,,,k
g
Raleigh, NC 27602
,
Gentlemen:
9
7
Subject: Report Nos.d0-324/81-273nd 50-325/81-27
l
This refers to the routine safety inspection conducted by Mr. D. F. Johnson of
this office on September 15 - October 15, 1981, of activities authorized by NRC
Operating Licensee Nos. DPR-71 and DPR-62 for the Brunswick facility and to the
discussion of our findings held with Mr. C. R. Dietz, Plant Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective exanications of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were
disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and tiie enclosed report will be placed in We NRC's Public Document Room.
If the report contains any information that you salieve to be exempt from dis-
~
closure under -10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request .for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such
information. If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so:
that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the cwner of the
information which identifies the document or part.therecf sought to be withheld,
and a' full statement of the reasons on the basis of which it is claimed that- the
information - should be withheld frcm public disclosure. -This section further
requires the statement to address with specificity the considerations listed in
8112070332 81103 ?
PDR ADOCK 05000
G
3
-
. - - -
-
.
---
y
-.
.
\\
'
o
2
OCT 3 0 1981
10 CFR 2.790(b)(4). The-information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidsvit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to-discuss
them with you.
Sincerely,
ts/
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
Inspection Report Nos. 50-324/81-27
50-325/81-27
cc w/ encl:
C. R. Dietz, Plant Manager
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of North Carolina.
-R
R
RII: 'RPI
RI
PI.
R
M DFJohnson:gr
I.WGarner.
CJ
an:
RButcher.
Clewis
/
10/ 6 /81
10Af/81
10/30/81z
"10gg81-
'10p1
-
,
0
%
- :
5