ML20033B754
| ML20033B754 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 11/03/1981 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Tallman W PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| References | |
| NUDOCS 8112020032 | |
| Download: ML20033B754 (2) | |
Text
f i
.w 4
DISTRIBUTION:
Docket File 50-443/444 LPDR N0Y 3 198l pW y g N
TERA f
LB#3 Files
/p A
?.
Docket Nos.: 50-443/444 DGEisenhut e
RAPurple j
gPO y
, % g <,9 RLTedesco T
Y,4 IA 9) f@%(
William C. Tallman FJMiraglia
/
Chairman and Chief Executive Officer LLWheeler Public Service Company of New Hampshire IJLee
~
h@/
P. O. Box 330 ACRS (16)
Manchester, New Hampshire 03105 IE (3)
Dear Mr. Tallman:
Subject:
NRC Staff Visit to Seabrook Station (Environmental Review)
The NRC staff will visit the Seabrook Station on December 1-2, 1981. This visit is part of the review process for preparing the environmental statement related to the operating license application.
The first day of the visit is scheduled for a site tour to make observations of conditions where Seabrook Station plant facilities and structures have an interface with the surrounding environment. The second day is scheduled for a meeting between the NRC staff and Public Service Company of New Hampshire, et.al., to discuss specific areas of staff interest. These discussions will encompass the questions that resulted from the acceptance review of the Environmental Report and forwarded as Enclosure 3 to the NRC letter of acceptance dated September 30, 1981. Other areas of interest developed during the site tour may also be discussed.
Enclosed herewith is a copy of the meeting notice with attached agenda and other related details.
Sincerely, Original signed by 3 pert L Tedese Robert L. Tedesco, Assistant Director for Licensing Divison of Licensing
Enclosure:
As stated cc: See next page.
8112020032 811103
{DRADOCK 05000443 PDR
"'">.DL;L,8 3,,
,DL -
J
,,D(;AD/L sux m e)
LLW er:S ' FJF g'lia RLTedesco
..h..../. 8l ' ih...k.. N1
"...'........".. ~...
lb
~
lb...../..N 1 om>
nje ronw ate no.coinacu o24o OFFICIAL RECORD COPY 4 - = -a29 24
SE AbkDi..;
" illicm C.1allman Chaimar. ac Chief Executive Officer Public Se vice CcTpany of New Hampshire P. O. Bux 330 Manchester, Nc.e Hampshire 03105 JohnA.Ritschch,Esq.
E. Tupper, Kinder, Esq.
Ropes and Gray Assistant Attorney Gentral 225 Franklin Street Office of Attorney Genaral Boston, Massachusetts 02110 208 State House Annex Concord, New Hampshire 03301 Mr. Bruce
.'2. Beckley, Project Manager Public Service Company of New Hampshire The Honorable Arnold Wight P. O. Box 330 New Hampshire House of Representatives Manchester, Ne.i Hampshire 03105 Science, Technology and Energy Comittee State HoJse G. Sanborn Concord, New Hampshire 03301 U. S. NRC - Region 1 631 Park Avenue Residcat Inspector King of Prussia, Pennsylvania 19406 Seabrook Nuclear Power Station.
c/o U. S. Nuclear Regulatory Commission Ms. Elizabeth H. Weinhold P. O. Box 700 3 Godfrey Avenue Seabrook, New Hampshire 03874 Hampton, New Hampshire 03842 Mr. John DeVincentis, Project Manager Robert A. Backus, Esq.
Yankee Atomic Electr_ic Company.
0'Neill, Backus and Spielman 1671 Worcester Road 116 Lowell Street Famingham, Massachusetts 01701 Manchester, New Hampshire 03105 Mr. G. F. Cole, Project Manager Norman Ross, Esq.
United Engineers and Constructors 30 Francis Street 30 South 17th Street Brookline, Massachusetts 02146 Post Office Box 8223 Philadelphia, Pennsylvania 19101 Karin P. Sheldon, Esq.
Sheldon, Harmon & Weiss lir. W. Wright, Projer. Manager 1725 I Street, N. W.
Vestinghouse Electric.orporation Washington, D. C.
20006 Jost Office Box 355 Pittsburg, Pennsylvania 15230 Laurie Burt, Esq.
Office of the assistant Attorney General Thomas Dignan, Esq.
Environmental Protection Division Ropes and Gray One Ashburton Place 225 Franklin Street Boston, Massachusetts 02108 Boston, Massachusetts 02110 D. Pierre G. Cameron, Jr., Esq.
General Counsel Public Service Company of New Hampshire P. O. Box 330 Manchester, New Hamps' e 03105
~
'~
'c m;n t o ".i t u r.
v
['$.A,.g i,,
NUCLE AR REGULATORY CO*."C!T!
,_q y WASWNGMN, D C 2W' s 14,9u s
%, ' u.< ** y
....+
Docket Nos :
50-443/444 MEMORANDUM F0P.:
F. J. fiiraglia, Chief, Licensing Orr.:h No. 3, DL FROM:
L. Wheeler, Project Manager, Licensing Branch No. 3, DL
SUBJECT:
!DTICE OF !!EETING FOR PP.ELI:lINARY DISCUSSION OF INFOR'4ATION FOR ENVIR0!NENTAL REVIEW AND SITE TO'JR - SEABROOK STATION U' IT 1 AND 2 DATE AND TIME:
December 1, 1981 - 9: 00 a.m. to 4: 00 p.m.
Deceter 2,1981 - 9:00 a.m. to 11:33 a.m.
LOCATION:
Decenber 1,1981 (Site Tour)
Seabrook Station Plant Site December 2,1981 (Discussion)
Seabrook Station Conference Room PURPOSE:
DECEMBER 1:
TO OBSERVE ENVIR0!TiENTAL CONDITIONS AT SELECTED LOCATIONS DECEMBER 2:
TO DISCUSS PRELI'11 NARY INF0PJ4ATION FOR
- ENVIR0!NENTAL REVIEW 0F THE SEABROOK PLANT PARTICIPANTS:
NRC Staff
~~
~
F. Miraglia, L. Wheeler, R. Codell, G. Gears, C. Hickey, M. Kaltman, J. Lehr, L. O'Reilly Public Service Company of New Hampshire,
B. Beckley, J. DeVincentis, P. Littlefield, R. MacPherson, B. Smith, et al
,8,
~. (. !
er, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosure:
Agenda cc: See next page The meeting of December 2,1981 is open to interested nenbers of the public, petitioners or other parties to attend as observers pursuant to NRC staff policy on open meetings. Members of the public wishing to attend should contact Mr. L.
Wheeler at 301-492-7792 by November 23, 1981, so that arrangements can be made for their attendance.
o4\\
- pr go qe
...i, "
,.a.-at SEABROOM Pr!!D0'">TNTAL REVIEW SITE VISIT
- CENDA December 1,1981 - 9:00 a.m. - 4:00 p.n. i A site tour will be made with the applicant and consultants.
General areas to be n,cluded in the tour are:
- 1. - Terrestrial Resources 2
Aquatic Resources 3.
Consumptive Water Use 4.
Thermal Hydrology 5.
Water Quality 6.
Chemical and Biocide Wastes 7.
Environmental Radiological Assessment Specific areas te be highlighted during the tour are:
1.
The barge dock facility at Seabrook Harbor 2.
The intake pumphouse and traveling screen system 3.' Construction effluent points into the estuary 4.
On-site settling basins, sewage treatment lagoon, landfills,-waste disposal areas.
5.
Site boundary at the estuary 6.
Education Center 7.
Transmission line alignment AD persons to go on the tour are to meet inside the Seabrook Education Center at 9:00 a.m.'
The specific route will be determined at that time (based on tide conditions at the estuary and any other relevant considerations). This meeting is expected to take no more than 10 minutes.
The decision on when and how long to break for lunch will be made af ter the tour has started,and will be based on how well the tour is progressing.
December 2, '1981 - 9:00 a.m. - 11:30 a.m.
Discussions will be held between the NRC staff and the applicant. The outline of the discussions will follow the topics identified during the ER-DL acceptance review that are cited in the questions in
, to the NRC letter of acceptance dated September 30, 1981.
Additional j
items may be discussed if the site taur indicates such discussions are required for a complete review.