ML20033A484
| ML20033A484 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 11/03/1981 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML20033A485 | List: |
| References | |
| NUDOCS 8111250489 | |
| Download: ML20033A484 (2) | |
See also: IR 05000317/1981018
Text
-.
.
'
-
.4
-s
NOV 3
1981
Docket Nos.
50-317
50-318
.
Baltimore Gas and Electric Company
,e
ATTN: Mr. A. E. Lundvall, Jr.
/#
'
-
-
,
r b. I
b)#
"
'
Vice Fresident, Supply
/g
!
P. O. Box 1475
j
J
!-
Baltimore, Maryland 21203
'(
NOV3 41981a- ~9I
Gentlemen:
d @c
Subject:
Inspection Nos.
317/81-18
%
,d
// ,D
318/81-17
M
3
_
This refers to the routine safety inspection conducted b'y .
h Architzel
'
of this office on Aug. 18 - Oct. 6, 1981 at the Calvert Cliffs Nuclear
~5
Power Plant, Lusby, Maryland of activities authorized by NRC License
Nos. DPR-53 and 69 and to the discussions of our findings held by Ralph
.
Architzel with Mr. L. Russell and other members of your staff at the
conclusion of the inspection.
Areas examined during this insoection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by tLe
inspector.
,
Based on the results of this inspection, it appears that certain of your
!
activities were not conducted in full compliance with NRC requirements,
-
as set forth in the Notice of Violation, enclosed heresith as Appendix
A.
These items of noncompliance have been categorized irito the levels
described in the Federal Register Notice (45 FR 46754) dated October 7,
1980. You are required to respond to this letter end in preparing your
response, you should follow the instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
i
of this letter and the enclosures will be placed in the NRC's Public
Document Room.
If this report contains' any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within 25 days from the
date of this letter a written application to this office to withhold such
information.
Consistent with section 2 790(b)(1), any such application
K
g
DRPI 6 %
McCab@a
Architzel
ORPI
C
I
10/20,'81
.1D M 81
0 /81
'
o b-
it h-
ll
' ;
8111250489 811103
g' I
PLR ADOCK 05000317
C
ggj
-
>
r
.'
-
,
.
-
NOV 1
O
Baltimore Gas and Electric Company
2
-
,
.
,
-must be- a: companied by an affidavit ey,ecuted by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons on the basis which it is claimed
~
that,the information shculd be withheld from public disclosure. This
7
'
section further requires the statement to 'eddr9 s with specificity the
consic5 rations listed in 10 CFR 2.790(b)(4f.
The information sought to
be withheld shall be' incorporated as far as possible into a separate
part of the affidavit.
If we do not hear frem you in this regard within
the specified periods noted above, the report will be placed in the -
Public Document Room. The telephone notification of your intent to
<
equest withholding, or any' request fer r. extension of the 10 day
,
period which you believe necessary, should be made to the Supervisor,'
/
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
S'heuld you have any questiuns concerning this inspection, we will be
pleased to discuss tham.with you.
~
Si ncei e'ly,
_
~
Original Sin Ad 378
( l
.r
.
.
R. R. 7eimig, Chief
,
Projects Granch No. 2,
"
Division of Resident
e
.
and Project Inspection
f
"
'
Enc 1csure: Combined Office of Inspection and Enforcement Inspection
-
Report Number 317/81-18; 318/81-17
cc w/ encl:
h. M. Douglass, Manager, Quality Assurance
'. B. Russell, Plant Superintendert
-
Sydnor. General Suptryisor, Operations QA
1. C. L. Olsea, Principal Engineer
'). A. Tiernan, Manager, Nuclear Power
i. E. Denton, General Supervisor, Training and Technical Services
'
F blic Document Room (PDR).
s
L(cal Public Document Room (LPDR) ,
Ncclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryiand (2)
bec wa ncl:
Region I Docket Room (with concurrences)
Cr. Steven Long, Administrator for Nuclear Evaluations
Chief, Operational Support Section (w/o encis)
/
..J
m:-