Forwards IE Insp Repts 50-317/81-18 & 50-318/81-17 on 810818-1006 & Notice of Violation
ML20033A484
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/03/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20033A485 List:
References
NUDOCS 8111250489
Download: ML20033A484 (2)


See also: IR 05000317/1981018

Text

-.

.

'

-

.4

-s

NOV 3

1981

Docket Nos.

50-317

50-318

.

Baltimore Gas and Electric Company

,e

ATTN: Mr. A. E. Lundvall, Jr.

/#

'

-

-

,

r b. I

b)#

"

'

Vice Fresident, Supply

/g

!

P. O. Box 1475

j

J

!-

Baltimore, Maryland 21203

'(

NOV3 41981a- ~9I

Gentlemen:

d @c

Subject:

Inspection Nos.

317/81-18

%

,d

// ,D

318/81-17

M

3

_

This refers to the routine safety inspection conducted b'y .

h Architzel

'

of this office on Aug. 18 - Oct. 6, 1981 at the Calvert Cliffs Nuclear

~5

Power Plant, Lusby, Maryland of activities authorized by NRC License

Nos. DPR-53 and 69 and to the discussions of our findings held by Ralph

.

Architzel with Mr. L. Russell and other members of your staff at the

conclusion of the inspection.

Areas examined during this insoection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, measurements made by the inspector, and observations by tLe

inspector.

,

Based on the results of this inspection, it appears that certain of your

!

activities were not conducted in full compliance with NRC requirements,

-

as set forth in the Notice of Violation, enclosed heresith as Appendix

A.

These items of noncompliance have been categorized irito the levels

described in the Federal Register Notice (45 FR 46754) dated October 7,

1980. You are required to respond to this letter end in preparing your

response, you should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

i

of this letter and the enclosures will be placed in the NRC's Public

Document Room.

If this report contains' any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within 25 days from the

date of this letter a written application to this office to withhold such

information.

Consistent with section 2 790(b)(1), any such application

K

g

DRPI 6 %

McCab@a

Architzel

ORPI

C

I

10/20,'81

.1D M 81

0 /81

'

o b-

it h-

ll

' ;

8111250489 811103

g' I

PLR ADOCK 05000317

C

PDR

ggj

-

>

r

.'

-

,

.

-

NOV 1

O

Baltimore Gas and Electric Company

2

-

,

.

,

-must be- a: companied by an affidavit ey,ecuted by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons on the basis which it is claimed

~

that,the information shculd be withheld from public disclosure. This

7

'

section further requires the statement to 'eddr9 s with specificity the

consic5 rations listed in 10 CFR 2.790(b)(4f.

The information sought to

be withheld shall be' incorporated as far as possible into a separate

part of the affidavit.

If we do not hear frem you in this regard within

the specified periods noted above, the report will be placed in the -

Public Document Room. The telephone notification of your intent to

<

equest withholding, or any' request fer r. extension of the 10 day

,

period which you believe necessary, should be made to the Supervisor,'

/

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

S'heuld you have any questiuns concerning this inspection, we will be

pleased to discuss tham.with you.

~

Si ncei e'ly,

_

~

Original Sin Ad 378

( l

.r

.

.

R. R. 7eimig, Chief

,

Projects Granch No. 2,

"

Division of Resident

e

.

and Project Inspection

f

"

'

Enc 1csure: Combined Office of Inspection and Enforcement Inspection

-

Report Number 317/81-18; 318/81-17

cc w/ encl:

h. M. Douglass, Manager, Quality Assurance

'. B. Russell, Plant Superintendert

-

Sydnor. General Suptryisor, Operations QA

1. C. L. Olsea, Principal Engineer

'). A. Tiernan, Manager, Nuclear Power

i. E. Denton, General Supervisor, Training and Technical Services

'

F blic Document Room (PDR).

s

L(cal Public Document Room (LPDR) ,

Ncclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryiand (2)

bec wa ncl:

Region I Docket Room (with concurrences)

Cr. Steven Long, Administrator for Nuclear Evaluations

Chief, Operational Support Section (w/o encis)

/

..J

m:-