ML20032E730

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-289/81-19 on 811013-16 & Notice of Violation
ML20032E730
Person / Time
Site: Cooper 
Issue date: 11/03/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20032E731 List:
References
NUDOCS 8111200852
Download: ML20032E730 (2)


See also: IR 05000289/1981019

Text

. . _ _ _ _

_ . . _ _ _ . - - _ . . _ _ . . _ . . . _ _ _ .

_ _.

.-

. _ _

__

_ _ . _

_ _ _

,

i

_ . ,

,

November 3, 1981

In Reply Refer To:

%

RIV

s

Docket: 50-298/Rpt. 81-19

p{r

H

.

/

,

'

L} NOV19193y.8

J

-

,

l

Nebraska Public Power District

-

,-Q .s, % "m

u

A

ATTN: Mr. J. M. P11 ant. Director

m*cu

Licensing and Quality Assurance

,

Post Office Box 499

'

Columbus Nebraska 68601

N

s

,e

,

,

Gentlemen:

This mfers to the inspection conducted by Mr. L. D. Gilbert of our staff

i

during the period October 13-16, 1981, of activities authorized by NRC

Facility Operating License No. DPR-46 for the Cooper Nuclear Station, and

to the discussion of our findings with Mr. L. C. Lessor of your staff at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection mport. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During this inspection, it was found that certain of your activities were

not conducted in full compliance with NRC requirements. Consequently,you

are required to respond to this matter, in writing, in accordance with the

provisions of Section 2.201 of the NRC's ' Rules of Practice," Part 2

Title 10. Code of Federal Regulations. Your response shall be based on the

specifics contained in the Notice of Vioution attached to this letter.

We have also examined actions you have taken with regard to previously

identified inspection finoings. The status of these items is identified

in paracraph 2 of the encised report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. _If this report contains any information that you

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within 10 days from the date of

this letter of your intention to file a request for withholding; and (b) sub-

mit within 25 days from the date of this letter a written application to this

If your receipt of this letter has been ,

p, -

office to withhold such information.

delayed such that less than seven days are available for your review, please

P

notify this office promptly se that a new due date may be established.

g

S111200852 8111

v

e

PDR ADOCK 05

bg

I

O

P

!.

" h

EMS. M .....EN

. . P.S .1

. . . . .RP.B.

N. .. IB

. . . .I ES . . . . . .

..

.

V. .'

so..u >I.... LDGflbert/nh

REHall

TFWes e ,an

GLMa s

Seidle

JEGagl

do

Collin

U'p'v/F/8

/[jki

""T0730781" "fi79781"' T67f. 6/81"" p/

. . . . . . 3. .D/81../ /30/81

/

om ,

"."".".

' " . " " " . " "

"""""'"

................

..................

...... .........

........

emC FORM 318 00-80) NRCM 0240

OFFICIAL RECORD COPY

.

.-

..~.

.

.

.

. -

.

. .

.

. - ~ .

. .

'

'

.

Nebraska Public Power District

-2-

November 3,1981

Consistent with Section 2.790(b)(1), any such application must be accompanied

by an affidavit executed by the owner of the information which identifies the

docment or part sought to be withheld, and which contains a full statement of

the reasons on the basis which it is claimed that the information should be

wit.hheld from public disclosure. This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit. If we do not hear from you in this

regard within the specified periods noted above, tha report will be placed in

the Public Document Rom.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

W. C. Seidle, Chief

Engineering Inspection Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - IE Inspection Report 50-298/81-19

cc: w/ enclosures

L. C. Lessor, St;perintendent

Cooper Nuclear Station

Post Offica Box 98

Brownville, NE 68321

bec to DMD for dist. //-d #/

bec dist. by RIV //%f-#/

BC

NRR/DHFS

Nebraska State Dept. of Health

PM

NRR/0LB

Kansas State Dept. of Health

AEOD

RAD ASMT BR

RRI - Cooper

ELD

RESEARCH

IE FILE

LPDR

IE/RPRIB

NSIC

NRC PDR

NTIS

-

"'C'>

..................

..................

............. . ..

. ... . . .. .

.... .. .. . ..

... ...........

. . .

...

"' * "'>

......... .........

....... .............

...... . ........ ...

. . .. ...... . . .

. ... ...

. .

.. . ..... .. .

...

.... . .

" ' >

..... ............

... ..............

.. ............ .....

...... ............

...... ...... ..

. . . . . . . . . . . . . . .

... ...... ... ..

=c ro:= 3i

no..o. new ez'

OFFICIAL RECORD COPY