ML20032E735

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 811013-16
ML20032E735
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/03/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20032E731 List:
References
50-289-81-19, NUDOCS 8111200856
Download: ML20032E735 (2)


Text

Appendix A NOTICE OF VIOLATION Nebraska Public Power District Docket: 50-298 Cooper Nuclear Station License: DPR-46 Based on the results of an NRC inspection conducted during the period October 13-16, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified:

Failure to Follow Instructions for Welding Criterion V of Appendix B to 10 CFR Part 50 requires that activities affecting quality shall be prescribed by documented instructions of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions.

Technical Specification for installation of torus saddles, NPPD Contract No. 80-28, Section G, Part IV, paragraph 6.4.2 requires that the weld overlay used on the torus shell shall extend 1/2 inch minimum beyond the toe of attachment welds.

Contrary to the above:

The NRr inspector observed, during a previous inspection on September 3, 1981, that areas on each of the four saddles inspected, saddles 8 through 11, did not satisfy the Technical Specification requirement, in that, the overlay extends less than 1/4 inch beyond the attachment weld toe.

The NRC inspector determined on October 14, 1981, that the change in welding technique, from that specified in the Technical Specification, had not been authorized; and during this inspection, upgraded the unresolved item to a violation.

This is a Severity Level V violation (Supplement I.E.).

(8119-01)

Pursuant to the provisions of 10 CFR Part 2.201, Nebraska Public Power District is hereby required to submit to this office, within 30 days of the date of this Notice, a writtcn statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation. Consideration may be given to extending your response time for good cause shown.

8111200856 911103' PDR ADOCK 05000299 G

PDR

1 The response directed by this Notice is not subject to the clearance proce-dures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Dated:

November 3,1981 4 W. Cr. Seidle, Chief F Engineering Inspection Branch b

f 2

. -.... - - -.;:L. L.. ::T:

~~ ~~;.~L-

-