ML20032B645
| ML20032B645 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 10/20/1981 |
| From: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20032B646 | List: |
| References | |
| NUDOCS 8111050755 | |
| Download: ML20032B645 (2) | |
See also: IR 05000361/1981025
Text
s
-AI&f
gjf
~&
y
G
f
..y
y
g
.
-
_.y
n
,
.
OCT 2 01981
Docket'No.
50-361
. . . .Ie
Southern California Edison Company
g
P. O.
Box 800
-
v
'
224 Walnut Grove Avenue
f
Rosemead, California 91770
-
NOyo 4
N'
u,,, Map ;.g ?
Attention:
Dr.
L. T.
Papay, Vice President
Advanced Engineering
V3-
-
Gentlemen:
s
.
Subjecc:
NRC Inspection of San Onofre Unit No. 2
This refers to the inspection conducted by Mr. G.W. Johnston of
this office on September 15-25, _1981, of activities authorized by
NRC Construction Permit No. CPPR-97, and to the discussion of our
findings held by Mr. Johnston with Mr. Chavez and other members
of your staff at the conclusion of the inspection.
Areas examined.during this inspection are ' described in the enclosed
inspection _ report.
Within these areas, the inspection consisted of
selective examinations of procedures-and representative records, in-
terviews with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified
within the scope of this inspection.
In accordance'with 10 CFR 2.790 of the Commission's regulations,
a' copy of this letter and the enclosed inspection report will be
placed in tha NRC's Public Document Room.
If this report contains
any information that you believe to be exempt from disclosure under
i
10 CFR 9.5 (a) (4) , it is necessary that you-(a). notify this office
,
i
by telephone within ten (10) days from the date of this_ letter of
~
your intention to file a request for_ withholding;.and (b) submit
.
within 25 days from the date of this letter a written application
to this office to' withhold such information.
If your receipt of
this letter has been delayed such that less than seven (7) days
are available for your review, please notify this offica promptly
so that a new due date may be established.
Consistent with section
,
2.790(b)(1), any such application must be accompanied by an affi-
T$
3
davit executed by the owner of the information which identifies
s
- ~
the' document or part sought to be withheld, and which contains a
full statement of the reasons on the basis which it is claimed
/[
that the'information should be' withheld from public_ disclosure.
l
<
-
= = >
-1
I
I
-
' g .....
..... eiitoso7ss etio2o
"
$DRADOCK05000g
~ ~ " " "
"-
-
-
..
..
........
..
- * * > G .. .
s.to n..
.c.t.z.1,g .D..
ennbor.g....
..
...............
cv4 m.!k.m... w.d6.t.e.i...... pa th.t.e.i. .... ................-.4.-..............-\\..L..---.
. - - - - -
I
" * - ' ' " ' '
-
- ,_ - .
-- .. .. . .- .-
~ .I, A L R ECO Fi D C O PY
318 (10:00) NRCM O240
OFFIC
-
- - - -
- - - - - .
NRC FORM
__
__
_ . . . .
_
r
/
f
Southern California Edison Company
-2-
OCr z o sal
. .
i
5
h
This section further requires the statement to address with speci-
ficity the considerations listed in 10 CFR 2.7 90(b) (4) .
The in-
}
formation sought to be withheld shall be incorporated as far as
l
possible into a separate part of the affidavit.
If we do not hear
t
from you in this regard within the specified periods noted above,
the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we vill
be glad to discuss them with you.
5
Sincerely,
Original signed by
[
D.
M.
Sternberg
I
}
D. M.
Sternberg, Chief
Reactor Operations Projects Branch
L
Enclosure:
,
-
IE Inspection Report
p
No. 50-361/81-25
-
cc w/o enclosure:
-
R.
Dietch, Vice President,
g
i
Nuclear Engineering and Operations, SCE
_
H.
Ray, SCE
<
bcc:
DMB/ Document Control Desk (RIDS)
L.
d
Distributed by RV:
g
Engelken (ltr)
Resident Inspector
g
[
A.
Johnson
E
State of CA (Hahn/ Johnson)
F
5
L
E
{
s e
E
?
-
..
.
E.
a
.
.
"
$
_
.
,w -
-
_ - - . .' '
.
.,