ML20032B071
| ML20032B071 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 10/23/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20032B072 | List: |
| References | |
| NUDOCS 8111040352 | |
| Download: ML20032B071 (2) | |
See also: IR 05000454/1981016
Text
_
,
s
o
e.
O
,
s
/
)
OCl e 3 aSt
7
,
m
f
'3%
'
3'
%
Docket No. 50-454.
Docket No. 50-455
7 jh,%
i.
M s L5J
a,
s
,
Commonwealth Edison Compar.y
- { i NOV0 31981>
~
^
. ATTN:
Mr. Corde11 Reed
,
Vice President
~
,
,.' .-
Post Office Box 767
'A * *T.Y,,
'"
'
Chica p , IL 60690
W,
//
.y
'
,
,
/,,
m
s
Gentlemen:
'b s j g-
(a
'
This refers to the routine safety inspection conducted by Mr. R. S. Love
-
of this office on September 22-25, 1981, of activities at Byron Generating
- 7
,
,
Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-130 ",
^'
and No. CPPR-131 and to the discussion of our findings with Mr. R. Tuetken,
,
Assistant Project Superintendent at the conclusion of the inspection.
,
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
,
examination of procedures and representative records, observazions, and in-
'
terviews with personnel.
\\
,
.
a,.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
<'
written response, su5nitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
'
of this letter, the enclosures, and your response to this letter will be
1.
placed in the NRC's Public Document Room.
If the enclosures contain any
X
information that you or your contractors believe to be exempt from dis-
.
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
.
j
office by telephone within seven (7) days from the date of this letter of
'
your intention to file a request for withholding; and (b) submit withia
C
twenty-five (2.5) days from the date of this letter a written application
to this office to withhold such information. Section 2.790(b)(1) requires
that any such application must be accompanied by an affidavit executed by
,
"
the owner of the information which identifies the document or part sought
'
to be withheld, and which contains a full statement of the reasons which '
are the bases for the claim that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
A
q-~(S j
,0
lI I
'
8111040352 811023
s
5
PDR ADOCK 05000454
G
~
f[ Q/
'
.
-
.g
it.
~,
n
r
,
m
'
s,,
-
. \\
a
-
',
a
I
Cone.onwealth Edison Company
- ? '-
'
,3
,
,d ,i o
,.
s det
.
,
-
'
'
N
s
-
_
informat ion nought to be withheld shall be' incorporated as far as possible
'
ihto s s9parhte part of the affidavit..
If pe do-not hear from you in this
ccgard wittiinthe specified periods noted above, a copy of this letter,
the enclosu m , and your response to this letter will be placed in the
, Public Document Rapm.
,We will' glad 1y discuss any questir.na_you have;doncerning this inspection.
_
.
'
,
[ Sincerely,,
Vr!)(nal'SijEd by C.E. HorcUd
~
~
'
C. E. Norelius, Dire ctor
Division of Engineering and
,
,
. y
TechnicalQnspection
Enclasures:
o
1.
Appendi3 A, Notices-
s
y
of Violarion
2.
IE Inspectio:tReports
No. 50-4$4/61-10 and
No._50-455731-12
cc w/ encl'.s:
"
Locia 0.~lic3 George
Director of Nuclear
Licensine
-
Gunner Sor
3ite
Project d erintendent
V. I. Schlosser,
Project Pfanager
R. E. Querio, Station
Superintendent
' ' ,
DMB/ Document Contorl Desk (RIDS)-
tiary Jo t!urray, Office of
,
Assistant Attorney General
flyron ?!. Cherry
.
.
-
i
s
RII
. II:
3
III
RIII
RIII
.
'9
Jkh
O L)
^
Love /so
Ha ki s
< hayes
Williams
1:us
y/u/a
u,
(e/pl ? <
10/9/81
,
s
-
,
\\