Hi Pot Test Rept
ML20032A864
Person / Time
Site: Brunswick  
Issue date: 03/01/1974
From: Korner R
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Shared Package
ML20032A854 List:
References
IEB-79-01B, IEB-79-1B, NUDOCS 8111020484
Download: ML20032A864 (1)


Text

. _ _ _ _ - - - - - - _ - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - _ _ - - - - - -. - -

=

(.

y

,o s~./

Westinghouse Electric Corporation Industry & Defense en:xr.usavateex:

ar.rrn ru:co.m:n SDK284 Ehiraf;tw Yort14C NWN l

March 1, 1974 Hi Pot Test Report Brunswick Penetrations UECC PO#9527-01-118-1CP141 In order to demonstrate the adequacy of the insulation system, each conductor was subjected to the following high pot test:

oa J

Class A 5 KV rating 12.5 KV to ground 1 mir.

12.5 KV cond to cend. I min.

Class B & C 600 V rating 2.2 KV to ground I min.

2 7 KV cond. to cond. 5 sec.

Class D (thermocouples) 1 KV to ground I min.

1 KV cond. to cond. 5 sec.

Class E (neutron detector) 3 KV-DC cond, to first rhield 1 min.,

Class F (CRDM) 1 KV to' ground 1 min.

1 KV cond. to cond. 5 sec.

The above tests were performe.1 on each prototype and on each production penetration.

All met the above values sithout failure.

~

)-

R. l.. Korner Project Engineer Penetrations Dept.