Forwards IE Insp Repts 50-361/81-15 & 50-362/81-04, on 810720-24.No Noncompliance Noted
ML20032A848
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/30/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20032A849 List:
References
NUDOCS 8111020465
Download: ML20032A848 (4)


See also: IR 05000361/1981015

Text

i

-

w

-..

w*

%

g

i

'

--

<

,

,

s

.

.

SEP 3 01981

.'

(

'

1

Docket Mos. 50-361, 50-362

in

Southern California Edison Company

(

hT

P0

G . N '*en,,g D

g

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

w

q . O M. [ #

t

Attention:

Dr. l.. T. Papay, Vice President

Advanced Engineering

Gentlemen:

Subject:

NRC Inspection of San Onofre Units 2/3

lhis refers to the inspection conducted by Messrs. J. H. Eckhardt and J. F.

Burdoin of this office on July 20-24, 1981 of activities authorized by NRC

Construction Permit Nos. CPPR-97 and 98, and to the discussion of our findings

held with Mr. D. E. Nunn and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance wi th NRC requirenen es were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains an" information that

you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within 25 days from the date

of this letter a written application to this office to withhold such infonnation.

If your receipt of this letter has been delayed such that less than seven

(7) days are available for your review, please notify this office promptly

h

" '> . .Ry/j,k. , k

,

,,, , ,

,,,, ,,, ,

"

. .I

BURD0lN

BISH F

"F'dUilE55E5f

'"

' ' '

" " '

'

-

' " " ' >

..EC)(fti . 'l '"

"E)jy/5i' ' ' '

"9Q78T *

'97pV8T'

'

"

~ ~ -

-

-

.

. -

9/2i/8

our>

. . ~ . ~

...

... ... ... ... . .

.....

. ,, ,,,

, , ,,,, ,,, ,

, , ,,,, ,, ,, ,

,,,,, ,,, ,, ,,,

,,

NRC FORM 3ta llO 80l NRCM C240

OFFICIAL RECORD COPY

  • ^*o *-328 824

_

__

E.

_

-

L.

'

l

1

..

.

Southern California Edison Company

-2-

SEP 3 0 GM

,

.'

so that a new due. date may be astablished. Consistent with section 2.790

(b)(1), any such application must be accompanied by an affidavit. executed

,

by the owner of the infomatien which identifies the document or part sought

to be withheld, and which contains a full statement of the basis 'on which

it is claimed that the information should be withheld from public diclosure,

j

!

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4).

The infomacion sought

H

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear froa=you in this regard within

the specified periods noted above, the report will be placed in' the Public '

!

Document Room.

'Should you have any questions concerning this inspection, we will be glad'

to discuss them with you.

)

4

Sincerely,

)

-

Q p{. PaulHdOm1

'

[

B. H. Faulkenberry, Chief

j

i

Reactor Construction projects Branch

Enclosure: -

,

IE Inspection Report

flo. 50-361/81-15-

50-362/81-04

i

cc w/o enclosure:

Mr. R. Dictch, Vice President

Nuclear' Engineering & Operations

bcc:

DMB/ Document Control Desk (RIDS)

I

Distributed by RV:

,

}

RHE (w/o enc)

M

+

l

'Sta+e of CA (Hahn/ Johnson)

j

Resident Inspectors (3)

~

i

1

,

f

1

i

i

i

i

.

f.

~~

I

,

l'

-

-~m .- ..-

,,,_-.,_..,.--.,_.~._..,,..-._..--_.;o_,_-.w...-,,,_.,,,.,_....-,,,.,,._,,.,,

, , , , , , ,

_

_

--

_

.

_ - - -

---

1

Q Ktty

Io

UNITED STATES

g

8

NUCLEAR REGULATORY COMMISSION

o

,E

$

REGION V

o,

g

1990 N. CALIFORNIA BOULEVARD

O

o

SulTE 202, WALNUT CREEK PLAZA

,

e,,,e

WALNUT CREEK CALIFORNIA 94596

!

SEP 3 01981

Docket Nos. 50-361, 50-362

i

i

i

Southern California Edison Company

i

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

[

Atten tion:

Dr. L. T. Papay, Vice President

Advanced Engineering

Gentlemen:

i

,

i

!

l

Subjec t:

NRC Inspection of San Onofre Units 2/3

his refers to the inspection conducted by Messrs. J. H. Eckhardt and J. F.

Burdoin of this office on July 20-24, 1981 of activities authorized by NRC

l

'

Construction Permit Nos. CPPR-97 and 98, and to the discussion of our findings

-

held with Mr. D. E. Nunn and other msnbers of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed inspection

i

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

q

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

j

NRC's Public Document Room.

If this report contains any 'infonnation that

you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within 25 days from the date

of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven

(7) days are available for your review, please notify this office promptly

Southern California Edison Company

-2-

SM 4 "

.

so that a new due date may be established. Consistent with section 2.790

(b)(1), any such application must be accompanied by an affidavit executed

by the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the basis on which

it is claimed that the information should be withheld from public diclosure.

This section further requires the statement to address with specificity

<

the considerations listed in 10 CFR 2.790(b)(4).

1he information- sought -

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

i

the specified periods noted above, the report will be placed in the Public

Document Room.

.

.

Should you have any questions concerning this inspection, we will be glad ~

to discuss them with you.

Sincerely,

8

8. D aultenke, rry, Chi

\\

H.

Reactor Construction P ojects1 ranch

Enclosure:

IE Inspection Report.

No. 50-361/81-15

50-362/81-04

cc w/o enclosure:

Mr. R. Dietch, Vice President

Nuclear Engineering & Operations

l.

.

-

. -

- .

-

- - - -

. .

.

-

. - -

-

- -

- -

- -

- - .

. .

-

- -

. - - - . -

-

- - -

-


.

.s..-

.

. -

-.

- -- .

.---- .-.e

--

-

.

-

- - -

. -