SEP 3 01981
.'
(
'
1
Docket Mos. 50-361, 50-362
in
Southern California Edison Company
(
hT
P0
G . N '*en,,g D
g
P. O. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
w
q . O M. [ #
t
Attention:
Dr. l.. T. Papay, Vice President
Advanced Engineering
Gentlemen:
Subject:
NRC Inspection of San Onofre Units 2/3
lhis refers to the inspection conducted by Messrs. J. H. Eckhardt and J. F.
Burdoin of this office on July 20-24, 1981 of activities authorized by NRC
Construction Permit Nos. CPPR-97 and 98, and to the discussion of our findings
held with Mr. D. E. Nunn and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance wi th NRC requirenen es were identified within
the scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains an" information that
you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within 25 days from the date
of this letter a written application to this office to withhold such infonnation.
If your receipt of this letter has been delayed such that less than seven
(7) days are available for your review, please notify this office promptly
h
" '> . .Ry/j,k. , k
,
,,, , ,
,,,, ,,, ,
"
. .I
BURD0lN
BISH F
"F'dUilE55E5f
'"
' ' '
" " '
'
-
' " " ' >
..EC)(fti . 'l '"
"E)jy/5i' ' ' '
"9Q78T *
'97pV8T'
'
"
~ ~ -
-
-
.
. -
9/2i/8
our>
. . ~ . ~
...
... ... ... ... . .
.....
. ,, ,,,
, , ,,,, ,,, ,
, , ,,,, ,, ,, ,
,,,,, ,,, ,, ,,,
,,
NRC FORM 3ta llO 80l NRCM C240
OFFICIAL RECORD COPY
- ^*o *-328 824
_
__
E.
_
-
L.
'
l
1
..
.
Southern California Edison Company
-2-
SEP 3 0 GM
,
.'
so that a new due. date may be astablished. Consistent with section 2.790
(b)(1), any such application must be accompanied by an affidavit. executed
,
by the owner of the infomatien which identifies the document or part sought
to be withheld, and which contains a full statement of the basis 'on which
it is claimed that the information should be withheld from public diclosure,
j
!
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4).
The infomacion sought
H
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear froa=you in this regard within
the specified periods noted above, the report will be placed in' the Public '
!
Document Room.
'Should you have any questions concerning this inspection, we will be glad'
to discuss them with you.
)
4
Sincerely,
)
-
Q p{. PaulHdOm1
'
[
B. H. Faulkenberry, Chief
j
i
Reactor Construction projects Branch
Enclosure: -
,
IE Inspection Report
flo. 50-361/81-15-
50-362/81-04
i
cc w/o enclosure:
Mr. R. Dictch, Vice President
Nuclear' Engineering & Operations
bcc:
DMB/ Document Control Desk (RIDS)
I
Distributed by RV:
,
}
RHE (w/o enc)
M
+
l
'Sta+e of CA (Hahn/ Johnson)
j
Resident Inspectors (3)
~
i
1
,
f
1
i
i
i
i
.
f.
~~
I
,
l'
-
-~m .- ..-
,,,_-.,_..,.--.,_.~._..,,..-._..--_.;o_,_-.w...-,,,_.,,,.,_....-,,,.,,._,,.,,
, , , , , , ,
_
_
--
_
.
_ - - -
---
1
Q Ktty
Io
UNITED STATES
g
8
NUCLEAR REGULATORY COMMISSION
o
,E
$
REGION V
o,
g
1990 N. CALIFORNIA BOULEVARD
O
o
SulTE 202, WALNUT CREEK PLAZA
,
e,,,e
WALNUT CREEK CALIFORNIA 94596
!
SEP 3 01981
Docket Nos. 50-361, 50-362
i
i
i
Southern California Edison Company
i
P. O. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
[
Atten tion:
Dr. L. T. Papay, Vice President
Advanced Engineering
Gentlemen:
i
,
i
!
l
Subjec t:
NRC Inspection of San Onofre Units 2/3
his refers to the inspection conducted by Messrs. J. H. Eckhardt and J. F.
Burdoin of this office on July 20-24, 1981 of activities authorized by NRC
l
'
Construction Permit Nos. CPPR-97 and 98, and to the discussion of our findings
-
held with Mr. D. E. Nunn and other msnbers of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the enclosed inspection
i
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
q
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
j
NRC's Public Document Room.
If this report contains any 'infonnation that
you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within 25 days from the date
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven
(7) days are available for your review, please notify this office promptly
Southern California Edison Company
-2-
SM 4 "
.
so that a new due date may be established. Consistent with section 2.790
(b)(1), any such application must be accompanied by an affidavit executed
by the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the basis on which
it is claimed that the information should be withheld from public diclosure.
This section further requires the statement to address with specificity
<
the considerations listed in 10 CFR 2.790(b)(4).
1he information- sought -
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
i
the specified periods noted above, the report will be placed in the Public
Document Room.
.
.
Should you have any questions concerning this inspection, we will be glad ~
to discuss them with you.
Sincerely,
8
8. D aultenke, rry, Chi
\\
H.
Reactor Construction P ojects1 ranch
Enclosure:
IE Inspection Report.
No. 50-361/81-15
50-362/81-04
cc w/o enclosure:
Mr. R. Dietch, Vice President
Nuclear Engineering & Operations
l.
.
-
. -
- .
-
- - - -
. .
.
-
. - -
-
- -
- -
- -
- - .
. .
-
- -
. - - - . -
-
- - -
-
.
.s..-
.
. -
-.
- -- .
.---- .-.e
--
-
.
-
- - -
. -