Text
-
a 7
s YANKEE AT0DIC ELECTRIC CbMPANY
" * ^ " * *'**
- m.
f 1671 Worcestu Road, Framingham, Massachusetts 01701 2.C.2.11
.Ya_ uxes rva 81-122
~
August 7, 1981 United States Nuclear Regulatory Commission Hegion 1 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention:
Office of Inspection and Enforcement Mr. Boyce H. Grier, Director
References:
(a) License No. DPR-3 (Docket No. 50-29)
(b) I & E Letter to YAEC dated July 16, 1981 I & E Inspection 50-29/81-07
Dear Sir:
Subject:
Hesponse to Inspection Reference is made to I & E Inspection No. 50-29/81-07, wnich was conducted by your Mr. J. C. Jang on April 28-30, 1981, at the Yankee Nuclear Power Station (Yankee Howe) in Howe, Massachusetts. The report made subsequent to that inspection identified one item which apparently was not conducted in full compliance with NRC regulations.
In accordance witn Section P.201 of the NHC's " Rules and Practices", Part 2, Title 10 Code of Federal Regulations, we hereoy submit the following information.
Alleged Item of Noncomplianc_e_
Section 6.8.1 of the Technical Specifications requires written procedures as per Section S.1 ud S.3 of ANSI N16.7-1972 and Appendix A of Regulatory Guide 1 33, November 1972. Section 6.8.2 of the Technical Specifications requires that each procedure required by Section 6.8.1 of the Technical Specifications be reviewed by the PORC and approved by the Plant Superintendent prior to implementation.
Contrary to the above, as of April 30, 1981, the written Vendor's Procedures for Sr-89, Sr-90 and C-14 analyses were not reviewed and approvea as required by Section 6.8.1 and 6.8.2 of the Tecnnical Specifications.
Response
It is our belief that the alleged Item of Noncompliance is incorrect in its interpretation of Technical Specifications (T.S.), ANSI N16 7-1972 and Appendix A of Hegulatory Guide 133, November 1972.
Tnerefore, we request that tne item of Noncompliance be withdrawn.
8110270393 811015'"
DRADOCK05000g
f' o ww 2
Tne analysis of Sr-39, Sr-90 and C-14 is perform 9d oy an outside contractor as is required by Procedure OP-9244 "Radionuclide Analysis of Primary Coolant and Purification System" which was reviewed by PORC, approved by the Plant Superintendent prior to tnis inspection. The outside contractor has been audited and reviewed througn our Quality Assurance program to perform these analyses and based upon their findings have been placed on our approved vendor list. This establishes the fact that they not only can meet our specifications but also the contractor has a Quality Assurance Program to back it up.
It is our belief that procedures which are performed offsite by an approved vendor need not be reviewed by the Plant Operation Review Committee.
We trust this information is satisfactory, however, should you desire additional information please feel free to contact us.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY 64c W L. H. Heider Vice Presioent COMMONWEALTH OF MASSACHUSETTS)
)ss MIDDLESEX COUNTY
)
Tnen personally appeared before me, L. H. Helder, who, being duly sworn, did state tnat he is a Vice President of Yankee Atomic Electric Company, that he is duly authorized to axecute and file tne foregoing request in the name and on the oehalf of Yankea Atomic Electric Company, and that the statements therein are true to tne best of his knowledge and be.lef.
f
',,, n. R ny-1%r H y A.Y'5*.6 Rob'ert H. Groce Notary Public My Commission Expires September 14, 1984