Gentlemen:
The enclosed Information Notice 81-31, " Failure of Safety Injection Valves to Operate Against Differential Pressure", is forwardad to you for information.
No written response is required.
If you desire additional information regarding ~
this matter, please contact this office.
Sincerely, Trn/9 N.
Y%
nald C. Haynes f rector
Enclosure:
IE I~nformation Notice No. 81-31 with 1 Attachment CONTACT:
D. L. Caphton (215) 337-5287 g)
O i
i g gO g {1 l
0 G
J
,,-w.
~
w s
1 LIST OF HOLDERS OF NUCLEAR F0WER REACTOR OPERATING LICENSES AND CONSTRUCTION PERMITS RECEIVING IE INFORMATION NOTICE NO. 81-31 Baltimore Gas and Electric Company Docket Nos. 50-317 ATTN: Mr. A. E. Lundvall, Jr.
50-318 Vice President, Supply P. O. Box 1475 Baltimore, Maryland 21203 Boston Edison Company M/C Nuclear Docket No. 50-293 ATTN:
Mr. A. V. Morisi Nuclear Operations Support Manager 800 Boylston Street Boston, Massachusetts 02199 Connecticut Yankee Atomic Power Company Docket No. 50-213 ATTN: Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Consolidated Edison Company of Docket Nos. 50-03 247 New York, Inc.
ATTN: Mr. John D. O'Toole Vice President - Nuclear Engineering and Quality Assurance 4 Irving Place New York, New York 10003 Duques.ne Light Company Docket No. 50-334 ATTN:
Mr. J. J. Carey Vice President Nuclear Division P. O. Box 4 Shiopingport, Pennsylvania 15077 Jersey Central Power and Light Company Dockel No. 50-219 ATTN:
Mr. Philip R. Clark Vice President - Nuclear 6PU Nuclear 100 Interpace Parkway Parsippany, New Jersey 07054
2 Maine Yankee Atomic Power Company Docket No. 50-309 ATTN: Mr. Robert H. Groce Senior Engineer-Licensing 1671 Worcester Road Framingham, Massachusetts 01701 Metropolitan Edison Company Docket No. 50-289 ATTN: Mr. H. D. Hukill Vice President and Director of TMI-l P. O. Box 480 Middletown, Pennsylvania 17057 Metropolitan Ediso'n Company Docket No. 50-320 ATTN: Mr. G. K. Hovey Vice President and Director of TMI-2 P. O. Box 480 Middletown, Dennsylvania 17057 Niagara Mohawk Power Corporation Docket No. 50-220 ATTN: Mr. T. E. Lempges Vice President Nuclear Generation 300 Erie Boulevard West I
Syracuse, New York 13202 Northeast Nuclear Energy Company
~
Docket Nos. 50-336 ATTN:
Mr. W. 3. Counsil 50-245 Senior Vice President - Nuclear 50-423 Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06101 Philadelphia Electric Company Docket Nos. 50-277 ATTN:
Mr. S. L. Daltroff 50-278 Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Power Authority of the State of New York Docket No. 50-286 Indian Point 3 Nuclear Power Plant ATTN:
Mr. J. C. Brons Resident Manager i
P. O. Box 215 Buchanan, New York 10511 4
3
/
= Power Authority of the State of New York Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant ATTN: Mr. John D. Leonard Resident Manager P. O. Box 41 Lycoming, New York 13093 Public Service Electric and Gas Company Docket Nos. 50-272 50-311 ATTN: Mr. F. W. Schneider Vice President - Production 80 Park Plaza - 15A Newark, New Jersey 07101 Rochester Gas and Electric Corporation Docket No. 50-244 ATTN: Mr. John E. Kaier Vice President Electric and Steam Production 89 East Avenue Rochester, Ncw York 14649 Vermont Yankee Nuclear Power Corporation Docket No. 50-271 ATTN:
Mr. Robert L. Smith Licensing Engineer 1671 Worcester Road Framingham, Massachusetts 01.701 Yankee Atomic Electric Company Docket No. 50-29 ATTN: Mr. James A. Kay Senior Engineer-Licensing 1671 Worcester Road Framingham, Massachusetts 01701 Docket No. 50-412 Duquesne Light Ccmpany ATTN: Mr. E. J. Woolever Vice President 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Docket No. 50-363 Jersey Central Power & Light Company ATTN: Mr. J. T. Carroll Acting Director Oyster Creek Nuclear Generating Station P. O. Box 388 Forked River, New Jersey 08731 Docket No. 50-322 Long Island Lighting Company ATTN: Mr. M. S. Pollock Vice President - Nuclear 175 East Old Country Road Hicksville, New York 11801
4 Niagara Mohawk Power torporation Docket No. 50-410 ATTN: Mr. Gerald K. Rhode Vice President System Project Management c/o Miss Catherine R. Seibert 300 Erie Boulevard, West Syracuse, NY 13202 Pennsylvania Power & Light Company Docket Nos. 50-387 ATTN: Mr. Norman W. Curtis 50-388 Vice President Engineering and Construction - Nuclear 2 North Ninth Street Allentown, Pennsylvania 18101 Philadelphia Electric Company Docket Nos. F0-352 ATTN:
Mr. John S. Kemper 50-353 Vice President Engineering and Research 2301 Market Street Philadelphia, Pennsylvania 19101 Public Service Electric & Gas Company Docket Nos. 50-354 ATTN:
Mr. T. J. Martin 50-355 Vice President Engineering and Construction 80 Park Plaza - 17C Newark, New Jersey 07101 Public Service Company of New Hampshire Docket Nos. 50-443 ATTN:
Mr. W. C. Tallman 50-444 Chairman and Chief Executive Officer 1000 Elm Street Manchester, New Hampshire 03105 k-n------------
- ------- x---
s SSINS No.:
6835 Accession No.:
8107230032 IN 81-31 UNITED STATES-NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 October 8, 1981 INFORMATION NOTICE NO. 81-31:
FAILURE OF SAFETY INJECTION VALVES TO OPERATE AGAINST DIFFERENTIAL' PRESSURE Description of Circumstances:
Both trains of the San Onofre Uni +
safety injection system were found to be
' al operating conditions on September 3, inoperable when challenged under 1981.
Following manual reactor ' rip from 88% power due to steam generator flow and level 9scillations caused by regulated power supply failure, low primary system pressure caused a safety injection initiation signal.
The licensee reported.that cperators dispatched to the auxiliary building following the safety injection initiation signal found that neither of the safety injection valves, located in the discharge of both trains of the safety injection pumps, had opened as required. There were no adverse consequences in this particular event since there was no loss of coolant accident.
The reactor pressure remained above the safety injection pump's shutoff head and therefore no actual i
injection of watar would have occurred if the valves had opened.
However, had reactor pressure decreased and actual injection been required, injection flow would not have been automatically available as designed.
The valves which failed to open are 14-inch Anchor Darling, Series 600, stain-less steel, Part No. SI-50-WDD valves using Greer Hydraulics No. 832210 actuators.
Tests were conducted on these valves in the as-found condition following this event and both valves failed to open against the 1,200 psi differential pressure which would normally exist across the valves following a safety injection signal.
l Pressure was lowered until one valve ope'ed with a 520 psid and the other at 80 psid.
Subsequent tests were performed after readjusting the valve packing to determine the cause of the failure.
These tests also failed to provide con-sistent opening against a 1,200 psid.
System modifications and further testing is under way to provide the necessary reliability for the safety injection system.
i l
These valves had been regularly tested at each refueling outage, but the tests l
were not required to be performed with differential pressure across these valves.
There may be systems and components at other facilities that are not periodical-ly tested under the differential pressure conditions at which they are designed to operate.
Consequently, we suggest that recipients of this notice take appro-l priate steps to determine whether or not situations similar to the above could exist at the recipients' plant (s).
4 s
IN 81-31 October 8, 1981 Page 2 of 2
~
This information notice is provided as an early notification of a significant safety matter that is still under review by the NRC staff.
If it is determined that actions are required, such as additional periodic tests with differential pressure or other actions, you will be notified in an appropriate manner.
In the meantime, no response to this notice is required.
If you have questions regarding this r atter, please contact the Director of the appropriate Regional Office.
Atcachment:
Recently issued Information Notices
/
~
Attachment IN 81-31 October 8, 1981 RECENTLY ISSUED IE INFORMATION NOTICES Inf >rmation Subject Date Issued to Notice No.
Issued 81-3)
Velan Swing 9/28/81 All holders of a Check Valves power reactor OL or CP 81-29 Equipment Qualification 9/24/81 All holders of a Testing Experience power reactor OL or CP 81-28 Failure of Rockwell-9/3/81 All holders of a Edward Main Steam power reactor Isolation Valves OL or CP 81-27 Flammable Gas Mixtures 9/3/81 All holders of a in the Waste Gas Decay power reactor Tanks in PWR Plants OL or CP 81-26 Compilation of Health 8/28/81 All holders of a power Physics Related reactor OL or CP, Information Items Research Reactor, Fuel Facilities and Priority Material License 81-25 Open Equalizing Valve 8/24/81 All holders of a of Differential Pressure power reactor Transmitted Causes OL or CP Reactor Scram and Lass of Redundant Safety Signals 81-24 Auxiliary Feed Pump 8/5/81 All holders of a Turbine Bearing power reactor Failures OL or CP 81-23 Fuel Assembly Damaged 8/4/81 All holders of a due to Improper power reactor Dositioning of Handling OL or CP Equipment 81-22 Section 235 and 236 7/31/81 All holders of 1 power Amendments to the or research r stor OL Atomic Energy Act or CP, all fuel fabrication of 1954 and reprocessing and spent fuel storage licensees and applicants
. _...