Docket No. 50-245
x
$
&
Northeast Nuclear Energy Company
-
ATTN:
Mr. W. G. Cou;isil
[
(h, g
Senior Vice President - Nuclear
-
0 O I.Z 6 g h (2
' Ul I
Engineering and Operations Group
g.
P. O. Box 270
'm 4
s
Hartford, Connecticut 06101
EP'o'r
3
Gentlemen:
p
on
Subject:
Inspection 50-245/81-13
This refers to the routine inspection conducted by Dr. Jin W. Chung of this
office on August 10-14, 1981 at Millstone Nuclear Power Station Unit 1, Waterford,
Connecticut of activities authorized by NRC License No. DPR-21 and to the
discussions of our findings held by Dr. Chung with Mr. R. Herbert and other
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
(45 FR 66754) dated October 7, 1980. You are required to respond to this letter
and in preparing your response, you should follow the instructions in Appendix
A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosures will be placed in the NRC's Public Document Room.
If
this report contains any information that you (or your contractors) believe to
be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)
notify this office by telephone within ten (10) days from the date of this
letter of your intention to file a request for withholding; and (b) submit
within 25 days from the date of this letter a written application to this office
to withhold such information. Consistent with section 2.790(b)(1), any such
application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons on the basis which it is claimed
that the information should be withheld from public disclosure. This section
further requires the statement to address with specificity the considerations
9
i
RI:DETI
RI:DETI
f,RI:DETI
4 RT:DP)I
P.I: RDI
Chung:hh
Caohton
i;iarpip
4, bE'i sasser
Br nner
,
9 23/,81
- C
CJ/2'[ld/
b[ql
ybDf6/
.
- M/
'
,
/
OFFICIAL RECORD CODY
- 0110200663 811001
f
l
PDG ADOCK 05000245
0
pon
-
r --
.
._
.
-
.
Northeast Nuclear Energy Company
2
listed in 10 CFR 2.790(b)(4). The information sought to be withheld snall be
incorporated as far as possible into a separate part of the affidavit.
If we do
not hear from you in this regard within the specified periods noted above, the
report will be placed in the Public Document Room.
The telephone nntification
of your intent to request withholding, or any request for an extension of the 10
day period which you believe necessary, should be made to the Supervisor, Files,
Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
origincl Sigre! !r:
Eldon J. Brunner, Chief, Projects
Branch #1, Division of Resident
and Project Inspection
Enclosures:
!
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-245/81-13
,
cc w/ encl:
,r ,
-
-
J. F. Opeka, Vice President, Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Public Document Roor.; (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Ccnnecticut
bec w/ encl:
4
-Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
2