Forwards IE Insp Rept 50-245/81-13 on 810810-14 & Notice of Violation
ML20031G027
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/01/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20031G028 List:
References
NUDOCS 8110200663
Download: ML20031G027 (2)


See also: IR 05000245/1981013

Text

_

,

.c

..

.

'

001 0 1 1981

-

Docket No. 50-245

x

$

&

Northeast Nuclear Energy Company

-

ATTN:

Mr. W. G. Cou;isil

[

(h, g

Senior Vice President - Nuclear

-

0 O I.Z 6 g h (2

' Ul I

Engineering and Operations Group

g.

P. O. Box 270

'm 4

s

Hartford, Connecticut 06101

EP'o'r

3

Gentlemen:

p

on

Subject:

Inspection 50-245/81-13

This refers to the routine inspection conducted by Dr. Jin W. Chung of this

office on August 10-14, 1981 at Millstone Nuclear Power Station Unit 1, Waterford,

Connecticut of activities authorized by NRC License No. DPR-21 and to the

discussions of our findings held by Dr. Chung with Mr. R. Herbert and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels described in the Federal Register Notice

(45 FR 66754) dated October 7, 1980. You are required to respond to this letter

and in preparing your response, you should follow the instructions in Appendix

A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosures will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractors) believe to

be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)

notify this office by telephone within ten (10) days from the date of this

letter of your intention to file a request for withholding; and (b) submit

within 25 days from the date of this letter a written application to this office

to withhold such information. Consistent with section 2.790(b)(1), any such

application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part sought to be withheld, and

which contains a full statement of the reasons on the basis which it is claimed

that the information should be withheld from public disclosure. This section

further requires the statement to address with specificity the considerations

9

i

RI:DETI

RI:DETI

f,RI:DETI

4 RT:DP)I

P.I: RDI

Chung:hh

Caohton

i;iarpip

4, bE'i sasser

Br nner

,

9 23/,81

  1. C

CJ/2'[ld/

b[ql

ybDf6/

.

  • M/

'

,

/

OFFICIAL RECORD CODY

OI

0110200663 811001

f

l

PDG ADOCK 05000245

0

pon

-

r --

.

._

.

-

.

Northeast Nuclear Energy Company

2

listed in 10 CFR 2.790(b)(4). The information sought to be withheld snall be

incorporated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified periods noted above, the

report will be placed in the Public Document Room.

The telephone nntification

of your intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor, Files,

Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

origincl Sigre! !r:

Eldon J. Brunner, Chief, Projects

Branch #1, Division of Resident

and Project Inspection

Enclosures:

!

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-245/81-13

,

cc w/ encl:

,r ,

-

-

J. F. Opeka, Vice President, Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Public Document Roor.; (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Ccnnecticut