Text
__
-
,o
SEP 2 4 E81
Docket No. 50-219
jO//
Jersey Central Power and Light Company
<$
ATTN: Mr. Philip R. Clark
ff[
j[ h
0
.
,
Vice President - Nuclear
[
'
GPU Nuclear
007
100 Interpace Parkway
T
u, % 0 ISSIA
_
g
Parsippany, New Jersey
07054
coMI @ w q
Gentlemen:
%,',
\\M
/ i'.
, (\\ /
L#
Subject:
Inspection 50-219/81-03
This refers to the routine safety inspection conducted by Mr. G. Napuda of
this office on March 30-April 3, 1981 at Oyster Creek Nuclear Generating
Station, Forked River, New Jersey of activities authorized by NRC License
No. OPR-16 and to the discussions of our findings held by Mr. Napuda with
Mr. I. Finfrock and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Our inspector also verified the steps you have taken to correct the item of
noncompliance brought to your attention in the enclosure to our letter
dated April 4, 1979.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
Item B in the Notice of Violation enclosed with this letter is a recu, ring
violation which was previously identified during an inspection of your
licensed activities on February 29, 1979 and was documented in the enclosure
to our letter dated April 4, 1979.
R1:DET
g
1:DETI MR1:DETI
R1:DRPI
R1:
Blumbe
wb'
aph on 'T.MartinGrfWWn[e'.i '/
9/21/81
lld' 81
rP
o Q2
s
h
'
0FFICIAL RECORD C0P
Tc-g
s
lr
mas 8e
G
,
Jersey Central Power and Light Ccmpany 2
These itens of noncompliance have been categorized into the levels described
in the Federal Register Notice (45 FR 66754) dated October 7, 1980.
The
recurrent and uncarrected item of noncompliance was given additional weight
in the categcrization and selection of enforcement action.
Y a are required
to respond to this letter and in preparing your response, you should follow
the instructions in Appendix A.
In addition to the need for corrective
action regarding these specific items of noncompliance, we are concerned
about the implementation of your management control systems that permitted
them to occur, and particularly abcut the apparent ineffectiveness of them
to prevent the recurrence of the noncompifance. Therefore, in your reply,
you should describe in particular, those actions taken or planned to improve
the effectiveness of your management control systems.
In ac ordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Puolic Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone witM n ten (10) days from the
date of this letter of your iitention to file a request for withholding;
and (b) submit within 25 days from the date of this letter a written application
to this office to withhold such information.
Consistent with section
2.790(b)(1), any such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or
part sought to be withheld, and which contains a full statement of the
reasons on the basis which it is claimed that the information should be
withheld from public disclosure.
This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
!
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you
in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
The telephone notificat!on of your
intent to request withholding, or any request for an extension of tne 10
day period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
l
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Original Sicnce E7:
R.R. Keimig, Chief, Projects
Branch #2, Division of Resident
and Project Inspection
Enclosures-
i
1.
Appendix A, Notice of Violation
'
2.
Office of Inspection and Enforcement Inspection
Report Number 50-219/81-08
0FFTCIAL RECORD COPY
E
.
,
Jersey Central Power and Light Company 3
cc w/encls:
M. Laggart, Licensing Supervisor
J. Knubel, BWR Licensing Manager
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bec w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
0FFICIAL RECORD COPY