Forwards IE Insp Rept 50-219/81-08 on 810330-0403 & Notice of Violation
ML20031C894
Person / Time
Site: Oyster Creek
Issue date: 09/24/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Phyllis Clark
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML20031C895 List:
References
NUDOCS 8110090107
Download: ML20031C894 (3)


See also: IR 05000219/1981008

Text

__

-

,o

SEP 2 4 E81

Docket No. 50-219

jO//

Jersey Central Power and Light Company

<$

ATTN: Mr. Philip R. Clark

ff[

j[ h

0

.

,

Vice President - Nuclear

[

'

GPU Nuclear

007

100 Interpace Parkway

T

u, % 0 ISSIA

_

g

Parsippany, New Jersey

07054

coMI @ w q

Gentlemen:

%,',

\\M

/ i'.

, (\\ /

L#

Subject:

Inspection 50-219/81-03

This refers to the routine safety inspection conducted by Mr. G. Napuda of

this office on March 30-April 3, 1981 at Oyster Creek Nuclear Generating

Station, Forked River, New Jersey of activities authorized by NRC License

No. OPR-16 and to the discussions of our findings held by Mr. Napuda with

Mr. I. Finfrock and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Our inspector also verified the steps you have taken to correct the item of

noncompliance brought to your attention in the enclosure to our letter

dated April 4, 1979.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

Item B in the Notice of Violation enclosed with this letter is a recu, ring

violation which was previously identified during an inspection of your

licensed activities on February 29, 1979 and was documented in the enclosure

to our letter dated April 4, 1979.

R1:DET

g

1:DETI MR1:DETI

R1:DRPI

R1:

Blumbe

wb'

aph on 'T.MartinGrfWWn[e'.i '/

9/21/81

lld' 81

rP

o Q2

s

h

'

0FFICIAL RECORD C0P

Tc-g

s

lr

mas 8e

G

,

Jersey Central Power and Light Ccmpany 2

These itens of noncompliance have been categorized into the levels described

in the Federal Register Notice (45 FR 66754) dated October 7, 1980.

The

recurrent and uncarrected item of noncompliance was given additional weight

in the categcrization and selection of enforcement action.

Y a are required

to respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In addition to the need for corrective

action regarding these specific items of noncompliance, we are concerned

about the implementation of your management control systems that permitted

them to occur, and particularly abcut the apparent ineffectiveness of them

to prevent the recurrence of the noncompifance. Therefore, in your reply,

you should describe in particular, those actions taken or planned to improve

the effectiveness of your management control systems.

In ac ordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Puolic Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone witM n ten (10) days from the

date of this letter of your iitention to file a request for withholding;

and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information.

Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

!

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

The telephone notificat!on of your

intent to request withholding, or any request for an extension of tne 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

l

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

Original Sicnce E7:

R.R. Keimig, Chief, Projects

Branch #2, Division of Resident

and Project Inspection

Enclosures-

i

1.

Appendix A, Notice of Violation

'

2.

Office of Inspection and Enforcement Inspection

Report Number 50-219/81-08

0FFTCIAL RECORD COPY

E

.

,

Jersey Central Power and Light Company 3

cc w/encls:

M. Laggart, Licensing Supervisor

J. Knubel, BWR Licensing Manager

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bec w/encls:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY