ML20031B912
| ML20031B912 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/01/1981 |
| From: | Widner W GEORGIA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM TAC-44586, TAC-44587, NUDOCS 8110060213 | |
| Download: ML20031B912 (2) | |
Text
A w
mab
<C
- ,t a
13 ! i' I
r J
.i p', g;
,c b
(i
- 1 Georgia Power t m,.
s
,+m
- 7. (,
W. A. Widner
- c. ? "'
October 1, 1981 W
g 0
G 199k m Director of Nuclear Reactor Regulation G%%
%D*% M; U. S. Nuclear Regulatory Commission A
WE.shington, D. C.
20555
&,d
-47/d t j ipSN NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 SAFETY / RELIEF VALVE (S/RV) OPER/LBILITY TEST RESULTS Gentlemen:
References:
1.
Letter from T.
Dente (BWR Owner's Grcup) to D. G.
Eisenhut (NRC), 'fransmittal of Valve Operability Test Report For The Generic BWR Safety / Relief Valve (S/RV) Test Program" dated September 25, 1981.
2.
Letter rom J.
T.
Beckham, Jr. (Georgia Power Company) to D. G. Eisenhut (tRC), " Preliminary Safety / Relief Valve (S/RV)
Operability Test Results" dated July 1, 1981 for Plant Hatch, Units 1 and 2.
In response to NUREG-0737, Item II.D.1, this letter provides the final test results which demonstrate the operational adequacy of the S/RV's for Plant Hatch, Units 1 and 2.
In addition, the adequacy of the S/RV discharge piping and supports has alto been demonstrated.
These final test results are contained in NEDE-24988-P, " Analysis of Generic BWR Safety / Relief Valve Operability Test Results" which was sJbmitted to the NRC via Reference 1.
GeoIgia Power Company is a participant in the BWR Owners Group generic S/RV operability test program.
Plant Hatch employs the Target Rock, two-stage safety / relief valve, Model No. 7567-F000.
The applicability of the generic test results to this plant's S/RV's has already been demonstrated in Reference 2.
phao!t8!! $s88A 08 4g 0 P
4 GeorgiaPower d Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission October 1, 1981 Page Two A review of the test report shows that the operational adequacy of the S/RV's and the piping and supports for Plant Hatch has been demonstrated for the conditions defined in Item II.D.l.
The submittal of NEDE-24988-P and this letter satisfies the October 1,1981 and January 1, 1982 submittal requirements of Item II.D.1 and completes Georgia Power Company's efforts on this item.
W. A. Widner states that he is Vice President of Georgia Power Company and i
is authorized to execute thic cath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.
l GEORGIA POWER COM'ANY
"#M By:
W. A. Widner Sworn o d subscri ed bef e me this 1st day of October, 1981.
Notary fthhc. Georgia, hte at Largie ib /
W Cosmmesson Empires Sept. 20,1983
.w.
Notary PDtTtic JAE/mb
'l xc: M. Manry R. F. Rogers, III i
t.
.