Forwards IE Insp Rept 50-206/81-25 on 810713-17 & Notice of Violation
ML20031A060
Person / Time
Site: San Onofre 
Issue date: 08/25/1981
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20031A061 List:
References
NUDOCS 8109180341
Download: ML20031A060 (2)


See also: IR 05000206/1981025

Text

.

,

.

z

a

.

,

  • -

t~

e

g

<

<

c'

q

AUG 2 5151

Docket No. 50-206

"

%

.

.*)

l

Southern California Edison Company

%S

P. O. Box 800

Il

V g7

.4

2244 Walr.ut Grove Avenue

g

-

Rosemead, California 91770

-

'

b

2

(D S

S

Attention: Dr. L. T. Papay, Vice President

,

1

Advanced Engineering

\\ro

G

-4

Gentlemen:

Subject: NRC Inspection - San Onofre I

i

This refers to the inspection conducted by Mr. A. Chaffee of this office

on July 13-17, 1981 of activities authorized by NRC Liceus No. DPR-13,

and to the discussion of our findings held by Mr. A. Chaffee with yourself

and Messrs. Haynes, Nunn and Curran and other members of the Southern California

Edison staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel and

observations by the inspector.

l

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy

of tMs letter md the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information that

you (or your contractors) believe to be exenpt from disclosure under 10

,

CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

,

!

within ten (10) days from the date of this letter of your intention to file

a request for withholding; and (b) submit within 25 days from the date of

'

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayca such that less than seven

(7) days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with section 2.790

(b)(1), any such application must be accompanied by an affidavit executed

[/

,

by the owner of the information which identifies the document or part sought

'

to be withheld, and which contains a full statement of the reasons on the

basis which it is claimed that the information should be withheld fmm public gi

I

disclosum. This section further requires the statement to address with

'

enacific'ty the caneirleratinne listed in 10 CFR 2.790lb)(41. The infon gtiom

. ...[ . dot

,

,, ,,

,,

,

,

,, , , , ,,, ,

, ,,,,,,,,, ,,,,,,

,, , ,,,,,,,,, ,,, ,,

,,,,,,, ,,,,,,,

"'C4

" " " " " > ......C M F.EE.... N L ..G.,

, ,,

,,,

..S... NBER? s109100341 810$$$6

"

- " " " -

"- " " "

-

. . . . . . . . ./. ./ 81

8/v//81

8g

81

pDR ADOCK 0500

8h.

om)

.a

. ,... ~ ~ ....... .. _

. ~ ~ ~ . ~ . - ~ , .,

...~~~~~ .-

... .

.... . .. .. .....

.. ..... .. ...

  • "o 'sw-32 824

NRC FORM 318 E10,80l NRCM O240

OFFICIAL RECORD COPY

.

-

%

M 25 W

Southern California Edison Company

-2-

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, the report will be placed in the Public

Document Room.

Should you have any questions conceming this inspection, we will be glad

to discuss them with you.

i

Sincerely,

0'

n. fll

'

"

'

D. M.lSternberg, Chie

Reactor Operations Projects Branch

Enclosures:

A.

Notice of Violation - Appendix A

B.

IE inspection Report

No. 50-206/81-25

4

cc w/o enclosure B:

R. Dietch, SCE

J. Curran, SCE (San Clemente)

Sent to DMB for DCS processing.

Distributed by RV:

RV PDR

Resident Inspector

State of CA (Hahn & Johnson)

RHE (w/o encle

1 D)

A. Johnson ec a enclosure B)

l

,

i

ix

N

%

. . _ .

-_. . , _ - . , - - _ , . - .. -.-__ ,..- _ .__. .-.. ._.._..,.. - . -

. -

.

- - - _ - _ _ , _ - , - - - . .

- - .