ML20030E231

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-361/81-18 on 810810-14.No Noncompliance Noted
ML20030E231
Person / Time
Site: San Onofre 
Issue date: 08/26/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20030E232 List:
References
NUDOCS 8109180240
Download: ML20030E231 (2)


See also: IR 05000361/1981018

Text

_ _ _ _ _ _ _ _ _ _

. _ _ _ _ _ _ _ _ _ _ _ _

,

e

r7

,-

, . ,

-y

,

,

y

G. '

$.

f

.

/

-

-

n,

,

-

-

y

s

,

A

3

ry: w

AUG 2 61981

~

  • >

%

'Jocket No. 50-361

&

S

.

~

-

SG k ,-

.

7 p g #g d

'

Southern California Edison Company

P. O. Box 800

6>M

2244 Walnut Grove Avenue

g

Rosemead California 91770

e

Attention:

Dr. L. T. Papay, Vice President

Advanced engineering

Gentlemen:

Subject: NRC Inspection at San Onofre Unit No. 2

This refers to the inspection conducted by Mr. A. D. Johnson of this

office on August 10-14, 1981 of activities authorized by NRC Construc-

tion Pennit Nos. CPPR-97 and 98, and to the discussion of our findings

held by Mr. Johnson with Mr. J. M. Curran and other members of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

4

In accordance with 10 CFR 2.790 of the Commission's regulat. ions, a copy

of-this letter and the enclosed. inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

by telephone within ten (10) days from the date of this lett.er of your

intention to file a request for withholding; and (b) submit within 25

days from the date of this letter a written application to this office

to withhold such infonnation.

If your receipt of this letter has been

delayed st.ch that les", than seven (7) days are available for your review.

please notify this office promptly v, that a new due date may be established.

Consistent with section 2.790(b)(1), any such application must be accom-

panied by an affidavit executed by the owner of the infonnation which

~8109180240 810826

0

PDR ADOCK 05000361

G

PDR

b'[

...Oh... . .$ .

a"*

RV

.

... ... ..

.

. . .

.

. . . ..

.. . ........

...... .

.....

~~~> . AW.9..nsp.n.. ..Gye,tz,i.9.. . E Eaulkenb rry...

.. . . .

.. ... .. .. ..

.. . ....... ..

... .. ..... .....

  • > . 8Gf/.81.... 8/a.981.. .. a C 4 m ... ...

..

.... .. ..... ..

. .. ........ .... .

... .......... .

. . . . . . . . . . . . .

unc rceu ais iio.coinacu c24o

OFFICIAL RECOFiD COPY

_

\\

.

.

-2-

AUG 2 61931

identifies the. document or part sought to be withheld, and which contains

a full . statement of the basis on which it is claimed that the information

should be withheld from public disclosure. This section further requires

the statement to address with specificity the considerations listed in

10CFR2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard with the specified periods

noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

,

.

Sincerely,

,

0L

,Q

(j

Uf

N'

B. H. Faulkenberry, Chief

7

Reactor Construction Projects Branch

Enclosure:

-

\\

IE Inspection Report

No. 50-361/81-18

'

'

cc: w/o enclosure

R. Dietch, Vice President

'

,

Nuclear Engineering & Operations, SCE

4

Sent to DMB for DCS processing.

,

.

Distributed by RV:

(.

RV PDR

State of CA (Hahn/ Johnson)

l

Resident Inspector

Al Johnson (w/ enc)

r

l

RHE (w/o enc)

i

i

+

s

-

.

.

. .

.

- .

- -

-

- .

. -

- -

-

-

- .

- - -

-

- - -

-

-

- - -

-

.

-

-

-

- . . -