ML20030E231
| ML20030E231 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/26/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20030E232 | List: |
| References | |
| NUDOCS 8109180240 | |
| Download: ML20030E231 (2) | |
See also: IR 05000361/1981018
Text
_ _ _ _ _ _ _ _ _ _
. _ _ _ _ _ _ _ _ _ _ _ _
,
e
r7
,-
, . ,
-y
,
,
y
G. '
$.
f
.
/
-
-
n,
,
-
-
y
s
,
A
3
ry: w
AUG 2 61981
~
- >
%
'Jocket No. 50-361
&
S
.
~
-
SG k ,-
.
7 p g #g d
'
Southern California Edison Company
P. O. Box 800
6>M
2244 Walnut Grove Avenue
g
Rosemead California 91770
e
Attention:
Dr. L. T. Papay, Vice President
Advanced engineering
Gentlemen:
Subject: NRC Inspection at San Onofre Unit No. 2
This refers to the inspection conducted by Mr. A. D. Johnson of this
office on August 10-14, 1981 of activities authorized by NRC Construc-
tion Pennit Nos. CPPR-97 and 98, and to the discussion of our findings
held by Mr. Johnson with Mr. J. M. Curran and other members of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
4
In accordance with 10 CFR 2.790 of the Commission's regulat. ions, a copy
of-this letter and the enclosed. inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure
under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office
by telephone within ten (10) days from the date of this lett.er of your
intention to file a request for withholding; and (b) submit within 25
days from the date of this letter a written application to this office
to withhold such infonnation.
If your receipt of this letter has been
delayed st.ch that les", than seven (7) days are available for your review.
please notify this office promptly v, that a new due date may be established.
Consistent with section 2.790(b)(1), any such application must be accom-
panied by an affidavit executed by the owner of the infonnation which
~8109180240 810826
0
PDR ADOCK 05000361
G
b'[
...Oh... . .$ .
a"*
RV
.
... ... ..
.
. . .
.
. . . ..
.. . ........
...... .
.....
~~~> . AW.9..nsp.n.. ..Gye,tz,i.9.. . E Eaulkenb rry...
.. . . .
.. ... .. .. ..
.. . ....... ..
... .. ..... .....
- > . 8Gf/.81.... 8/a.981.. .. a C 4 m ... ...
..
.... .. ..... ..
. .. ........ .... .
... .......... .
. . . . . . . . . . . . .
unc rceu ais iio.coinacu c24o
OFFICIAL RECOFiD COPY
- - w8o-329 24 ,
_
\\
.
.
-2-
AUG 2 61931
identifies the. document or part sought to be withheld, and which contains
a full . statement of the basis on which it is claimed that the information
should be withheld from public disclosure. This section further requires
the statement to address with specificity the considerations listed in
10CFR2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard with the specified periods
noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
,
.
Sincerely,
,
0L
,Q
(j
Uf
N'
B. H. Faulkenberry, Chief
7
Reactor Construction Projects Branch
Enclosure:
-
\\
IE Inspection Report
No. 50-361/81-18
'
'
cc: w/o enclosure
R. Dietch, Vice President
'
,
Nuclear Engineering & Operations, SCE
4
Sent to DMB for DCS processing.
,
.
Distributed by RV:
(.
RV PDR
State of CA (Hahn/ Johnson)
l
Resident Inspector
Al Johnson (w/ enc)
r
l
RHE (w/o enc)
i
i
+
s
-
.
.
. .
.
- .
- -
-
- .
. -
- -
-
-
- .
- - -
-
- - -
-
-
- - -
-
.
-
-
-
- . . -