Text
,
I fg UNkTED STATES b
l 4
g NUCLEAR REGULATORY COMMISS:-
7jg l
t WASHINGT ON, D. C. 20555 NSIL s
/
cp July 15, 1981 Docket Nos. 50-397 50-460 50-513 Mr. Eugene Rosolie f,f08 Coalition for Safe Power 9
Suite 527, Governor Building 408 Southwest Second Avenue IN RESPONSE REFER Portland, OR 97204 TO F01A-81-199
Dear Mr. Rosolte:
This is in further reply to your letter dated May 12, 1981, in which you requested, pursuant to the Freedom of Information Act, copies of documents relating to seven categories of information identified in your request.
As stated in iny letter dated June 10, 1981, a few additional documents were identified which were being reviewed for release.
This review has been completed, and copies of the documents listed on Appendix A hereto are enclosed.
Please note that documents 5.(d) and 5.(e) of Appendix A are already on file in the NRC Public Document Room (PDR) and the Local PDR which are located at the addresses previously given.
This completes our action on your request.
Since el,
pg J.
. Felton, Director Division of Rules and Records Office of Administration
Enclosures:
As stated a
e q
s
[
II 8
'p JUL 1 G 1981 N-.
gu.s.ugug n=
j
~
sf
~
8109170105 810715 PDR FOIA ROSOLIE81-199 PDR l
Re: F01A-81-199
'(R0S0 LIE)
APPENDIX A 1.
April 7,1980 Memo to D. Thompson from H. D. Thornburg,
Subject:
WPPSS, WNP-2 Enforcement Package (1 page) 2.
July 30, 1980 Memo to D. Thompson from R. H. Engelken,
Subject:
Draft Order to impose Civil Penalty on WPPSS (Docket No. 50-397) (1 page) 3.
August 6, 1980 Memo to D. Thompson from H. D. Thornburg
Subject:
WPPSS, WNP-2 Enforcement Action (1 page).
4.
August 12, 1980 Draft Le_tter to V. Stello from R. L. Ferguson, WPPSS,
Subject:
... Clarification of Responses to the Notice of Proposed Imposition of Civil Penalties and to the Notice of Violation (5 pages) 5.
August 20, 1980 Memo to D. Thompson from R. H. Engelken,
Subject:
WPPSS Reply to Notice of Violation and 10 CFR 50.54(f) Letter, WNP-2 (1 page). With er. closures as follows:
l Undated (a) Draft of a proposed letter of acknowledgement l
to the WPPSS reply to the Notice of Violation l
on Docket No. 50-397 (WNP-2) dated July 11 j
1980 (2 pages) i Undated (b) Memo to file (Docket No. 50-397) from R. C.
Haynes,
Subject:
Review and Eval n tion of WNP-2 Response to NRC's 50.,54(f) letter (3pages)
May 7, 1980 (c) Event Summary - WNP-2 Shield Wall / Pipe Whip Restraint Problems (4 pages)
- Undated (d) Appendix A - Notice of Violation to WPPSS (13 pages)
- Undated (e)' Region V, Report No. 50-397/80-04 (27 pages) l
- NOTEi These documents are already on file in the NRC PDR and LPDR
_-.--.-_____.-_---__--_____-_.__-.._---._.__a
e g
Coalition for Safe Power '
Suite 527 Governor Building 408 Southwest Second Avenue Portland. Oregon 97204 (503)295 0491 9
May 12, 1981 Director FREEDOM OF INFORMATION U.S.N.R.C.
ACT REQUEST Office Administration bII'/ff Washington D.C.,
20555 FREEDOM OF INFORMATION ACT REQUEST
[
The Coalition For Safe Power hereby makes the following requests for information pursuant to 10 CFR 9.8:
- 1) Minutes of the February 25, 1981 meeting between Robert Engleken, NRC, and Bob Ferguson,, Washington Public Power Supply System.
- 2) Provide a list of all 42 violations of NRC regulations which were discussed at the meeting in 1 above, with a detailed description, and all NRC evaluations of each violation.
- 3) Provide all documents concerning drug use at the WPPSS Hanford Nuclear Project.
- 4) Supply all interviews done by the NRC with workers at all WPPSS projects under NRC jurisdiction.
- 5) Provide all NRC documents concerning the possibility of suspension, modification or revocation of WPPSS construction license.
- 6) Supply all documents related to the falsification of records including but not limited to pipe hangers in the reactor building at the WPPSS Nuclear Project 2.
- 7) Supply all documents relied on by the NRC in assessing a $61,000 fine, in June 1980.
h Respectfully sulmitted, 10 f m&
Eug9 Rosol.'
Coaa tion For Safe Power 3
cc: files g}idb
\\ 3
. --