Forwards IE Insp Repts 50-413/81-10 & 50-414/81-10 on 810518-22 & Notice of Violation
ML20030D493
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/24/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20030D477 List:
References
NUDOCS 8109010451
Download: ML20030D493 (2)


See also: IR 05000413/1981010

Text

e

  • k +f *

e,

UNITED STATES

gyy{CIAL COPY

!"m

j

NUCLEAR REGULATORY COiv1 MISSION

gpg

'; .y

c. t

REGION 11

o,

[

101 MARIETTA ST.. N.W., SUITE 3100

'/

ATLANTA. GEORGIA 30303

s

  • ...-

JUN 2 41981

Duke Power Company

ATTN:

Mr. W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

)

Subject: Report Nos. 50-413/81-10 and 50-414/81-10

This refers to the routine safety inspection conducted by Mr. W. P. Kleinsorge of

this office on May 18-22, 1981, of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility.

Our preliminary

findings were discussed with Mr. D. G. Beam, Project Manager, at the conclusion

of the inspection.

l

l

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selectivs examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Appendix A.

Two new unresolved items are identified in the enclosed inspection report. These

items will be examined during subsequent inspections.

In acenrdance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

i

l

If the report contains any information that you believe to be exempt from disclo-

sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by

l

telephone within ten days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five days from the date

I

of this letter a written application ta this office to withhold such information.

l

If your receipt of this letter has been delayed such that less than seven days

are available for your review, please notify this office promptly so that a new

due date may be established. Consistent with section 2.790(b)(1), such applica-

tion must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part thereof sought to be withheld, and a full

statement of the reasons on the basis of which it is claimed that the information

should be withhe'id from public disclosure.

This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790-

(b)(4). The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified periods noted above, the report will be placed

in the Public Document Room.

8109010451 810824

PDR ADOCK 05000413

G

PDR-

_ - _ _ - _ _

_ _ _ _ _ _ _ _ _ _ _

.

JUN 2 4 1981

.

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/b'-(I,

R. C .

esis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-413/81-10

and 50-414/81-10

cc w/ encl:

J. W. Hampton, Station Manager

D. G. Beam, Project Manager

d