Text
,
--
.
OFFICI AL COM'
[.
UNITED STATES
-
[j
f
NUCLEAR REGULATORY COMMISSION
M
"
REGION 11
, . Cr,:/
g\\ b ,.' [c
101 M ARIETTA ST., N.W., SUITE 3100
K
"/
ATLANTA, GEORGIA 00003
- ~*
JUN 2 51981
Florida Power Corporation
ATTN: Mr. J. A. Hancock, Assistant
Vice President
4
Nuclear Operations
P. O. Ecx 14042, Mail Stoo C-4
St. Petersburg, FL 33733
Gentlemen:
Subject: - Report No. 50-302/81-08
This refers to tne routine unannounced inspection conducted by Mr. J. M. Puckett
of this office on April 27 - May 1,
1981, of activities authorized b-
NRC
. Operating License No. DPR-72 for the Crystal River facility.
Our preliminary
findings were discussed with Mr. D. C. Poole, Nuclear Plant Manager, at the
conclusion of the inspection.
Areas examined during the inspection anc our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and reoresentative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previcusly identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
i
!
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe .to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from the date
l
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
whicn identifies the document or part thereof sought to be withheld, and a full
i
!
ll
8109010210 810820
-
PDR ADOCK 05000302
G
- ,
- - _ _ . _ . _
,_
- _ - , . - ,
_ . _ , . _ _ _ . _ - . .
,, .. _ __ . _ _ _
-
. .
-
O
JUN 2 51931
-
.
Florida Power Corporation
2
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure.
This ;ection further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(1). Tne information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
Shoulc you have any questions concerning this letter, we will be glao to discuss
them with you.
Sincerely,
)3.(C.
'
R. C. L wi s , Acting Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Apoendix A, Notice of Violation
2.
Inspection Report No. 50-302/81-08
cc w/ encl:
D. C. Poole, Nuclear Plant Menager
i
1
,
I
e