Forwards IE Insp Repts 50-369/81-20 & 50-370/81-09 on 810706-10.No Noncompliance Noted
ML20030B671
Person / Time
Site: McGuire, Mcguire  
Issue date: 07/27/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20030B672 List:
References
NUDOCS 8108180426
Download: ML20030B671 (2)


See also: IR 05000369/1981020

Text

e

i

f

.

CN

b

3

JUL 2 71331

A

@

%

.

%--

Duke Power Company

ATTN: Mr. W. O. Parker, Jr.

ti-

/j g 2 i'/Sg7 g 8

.

Vice President, Steam Production

2

7

i g " '!Leane

P. O. Box 2178

Charlotte, NC 28242

D

'"*e

(

sh

Gentlemen:

-.

Subject: Report Nos.60~36T781-2Cand 50-370/81-09

This refers to the routine inspection conducted by Mr. T. D. Gibbons of this

office on July 6-10, 1981, of activities ?"thorized by NRC License No. NPF-9

for the McGuire facility and to the discussion of our findings held with

Mr. M. S. Starnes, Project Engineer, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclo-

sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by

telephone within ten days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five days from the date

of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days

are available for your review, please notify this office promptly so that a new

due date may be established. Consistent with section 2.790(b)(1), such applica-

tion must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part thereof sought to be withheld, and a full

statement of the reasons on the basis of which it is claimed that the information

should be withheld from public disclosure.

This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790-

(b)(4). The informatien sought to be wit.hheld snall be incorporated as far as

possible into a separate part of the affidavit. If we do not hear from you i.1

i

this regard with.in the specified periods noted above, the report will be placed

in the Public Document Room.

l

)

ODO*A!acPo!o0o$19

G

PDR

f

1

.-

-

-

!

.

.

Duke Power Company

2

g;7g

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. Lewis, Chief

Reactor Projects Branch 1

Division of Resident and

Reactor Project inspection

Enclosure:

Inspection Report Nos. 50-369/81-20

and 50-370/81-09

cc w/ encl:

M. D. McIntosh, Plant Manager

D. G. Beam, Project Manager

bcc w/ encl:

NRC Resident Inspector

Central Files

Local Public Document Room

Washington Public Document Room

Nuclear Safety Information Center

Technical Information Center

I

Document Management Branch

State of North Carolina

y

!N [Jfiurphy

y

pta'

au

au

~

TDGibbons:ht

TEConlon

AFGibson

RCLe is

'

g g81

7/g/81

7// 81

7

81

/81