ML20030B671
| ML20030B671 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 07/27/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20030B672 | List: |
| References | |
| NUDOCS 8108180426 | |
| Download: ML20030B671 (2) | |
See also: IR 05000369/1981020
Text
e
i
f
.
b
3
JUL 2 71331
A
@
%
.
%--
Duke Power Company
ATTN: Mr. W. O. Parker, Jr.
ti-
/j g 2 i'/Sg7 g 8
.
Vice President, Steam Production
2
7
i g " '!Leane
P. O. Box 2178
Charlotte, NC 28242
D
'"*e
(
sh
Gentlemen:
-.
Subject: Report Nos.60~36T781-2Cand 50-370/81-09
This refers to the routine inspection conducted by Mr. T. D. Gibbons of this
office on July 6-10, 1981, of activities ?"thorized by NRC License No. NPF-9
for the McGuire facility and to the discussion of our findings held with
Mr. M. S. Starnes, Project Engineer, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from the date
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(4). The informatien sought to be wit.hheld snall be incorporated as far as
possible into a separate part of the affidavit. If we do not hear from you i.1
i
this regard with.in the specified periods noted above, the report will be placed
in the Public Document Room.
l
)
ODO*A!acPo!o0o$19
G
f
1
.-
-
-
!
.
.
Duke Power Company
2
g;7g
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Chief
Reactor Projects Branch 1
Division of Resident and
Reactor Project inspection
Enclosure:
Inspection Report Nos. 50-369/81-20
and 50-370/81-09
cc w/ encl:
M. D. McIntosh, Plant Manager
D. G. Beam, Project Manager
bcc w/ encl:
NRC Resident Inspector
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
I
Document Management Branch
State of North Carolina
y
!N [Jfiurphy
y
pta'
au
au
~
TDGibbons:ht
TEConlon
AFGibson
RCLe is
'
g g81
7/g/81
7// 81
7
81
/81