Forwards IE Insp Repts 50-413/81-15 & 50-414/81-15 on 810706-10.No Noncompliance Noted
ML20030B655
Person / Time
Site: Catawba  
Issue date: 07/24/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20030B656 List:
References
NUDOCS 8108180407
Download: ML20030B655 (2)


See also: IR 05000413/1981015

Text

'fal%

.-

JUL 241981

e

.

,

N

-

g

~

S.

,

Duke Power Company

  • ,=

c

-

s

ATTN:

Mr. W. O. Parker, Jr.

p

f,gc 1 7]ggj > g

Vice President, Steam Production

g , mwison

P. O. Box 2178

y

Charlotte, NC 28242

4l

4

Gentlemen.

'b

Subject: Report Nos.k13/81[l$ and 50-414/81-15

This refers to the routine safety audit conducted by Mr. N. Merriweather of this

office on July 6-10, 1981 of the quality assurance program for design, procure-

ment, and construction of the Catawba facility, and to the discussion of our

preliminary findings held with Mr. J. C. Rogers of your staff at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclo-

sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by

telephone within ten days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five days from the date

of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days

are available for your review, please notify this office promptly so that a new

due date may be established. Consistent with section 2.790(b)(1), such applica-

tion must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part thereof sought to be withheld, and a full

statement of the reasons on the basis of which it is claimed that the information

should be withheld from public disclosure.

This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790-

(b)(4). The information sought to be withheld shall be incorporcted as far as

possible into a separate part of the affidavit. If we do not hear from you in

this regard within the specified periods noted above, the report will be placed

in the P'ublic Document Room.

l

l

}d

8108180407 810724

PDR ADOCK 05000413

G

PDR-

Se [

.

--

.

-

--

--

-

- a

.

,

Duke Power Company

2

t_ g A jg 81

,,,,

Jti

-

Should you have any questions concerning this letter. we will be glad to discuss

them with you.

Sincerely,

M

P. J. Kellogg, Acting Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-413/81-15

and 50-414/81-15

cc w/ encl:

J. W. Hampton, Station Manager

D. G. Beam, Project Manager

bcc w/cncl-

Central Files

Local Public Document Room

Washington Public Document Room

Nuclear Safety Information Center

Technical Information Center

Document Management Branch

State of South Carolina

RII

RI

RII

RII 2

<

RII

RII

l

i

4%~~

$b

f](b~

&

'

7/ y/81

7fp/81ight[CMurphyAFGibson

AJdnson

PKeL ogg

1

NMerriweather:ht

U

t

s5

7/v781

7/.Q'y81

7A24/81

7/g{/81

-

.

- -