Proposed Tech Specs Increasing Surveillance Intervals for Emergency Diesel Generators from 18 to 24 Months
ML20029A552
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/19/1991
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20029A551 List:
References
NUDOCS 9102250219
Download: ML20029A552 (4)


Text

, . _ . - -_ __ . _ _ . _ . _ _ . _ _ _ _ - _ . . . . _ _ _ . _ _ _ . _ _ _ _ _ _ . _ _ _ _ - .

l ENCLOSURE 3 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKETS 50 325 & 50 324 OPERATING LICENSES DPR 71 & DPR 62 REQUEST FOR LICENSE AMENDI,iENT 24 MONTil DIESEL GENERATOR SURVEILLANCE INTERVAL TECIINICAL SPECIFICATION PAGES UNIT 1 f

PDR

i l

ELECTRICAL p0WER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.8.1.1.2 Each diesel generator shall be demonstrated OpERABLEt

a. At least once per 31 days on a STACCERED TEST BASIS by
1. Verifying the fuel level in the engine-mounted fuel tank,
2. Verifying the fuel level in the day fuel tank,
3. Verifying the fuel transfer pump can be started and transfers fuel from the day tank to the engine mounted tank,
4. Verifying the diesel starts and accelerates to at least $14 rpm i in less than or equal to 10 seconds,* '
5. Verifying the generator is synchronized, loaded to greater than or equal to 1750 kw, and operates for greater than or equal to 15 minutes, and
6. Verifying the diesel generator is aligned to provide standby power to the associated emergency buses.
b. At least once per 31 days by verifying the fuel level in the plant fuel storage tank,
c. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-D270-65, is within the acceptable limits specified in Table 1 of ASTM-0975-74 when checked for viscosity, water and sediment, AY
a. Atleastonceper+0(monthsduringshutdownbyt
1. Subjecting the diesel to an inspection in accordane; with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service,
2. Verifying the generator capability to reject a load equal to one core spray pump without tripping,
  • The diesel generator start (10 seconds) f rom ambient conditions shall be performed at least once per 184 daye in these surveillance testa. All other engine starts for the purposs ci this surveillance testing may be preceded by a manually initiated engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical stress and weer on the diesel engine in minimized.

1 BRUNSWICK - UNIT 1 3/4 E-4 Amendment No. 104

l ENCLOSURE 4 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKETS 50 325 & 50 324 OPERATING LICENSES DPR 71 & DPR 62 REQUEST FOR UCENSE AMENDMENT 24 MONTil DIESEL GENERATOR SURVEILLANCE INTERVAL TECIIN_lCAL SPECIFICATION PAGES UNIT 2 i.

l

-i- .: , , ,  :-

i ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE

a. At least once per 31 days on a STACCERED TEST BASIS by:
1. Vesifying the fuel level in tha engine-mounted fuel tank,
2. Verifying the fuel icvel in the day fuel tank,
3. Verifying the fuel transfer pump can be started and transfers fuel from the day tank to the engine mounted tank,
4. Verifying the diesel starts and accelerates to at least 514 rpm in less than or equal to 10 seconds,*

$. Verifying the generator is synchronized, loaded to greater than or equal to 1750 kw, and operates for greater than or equal to 15 minutes, and

6. Verifying the diesel generator is aligned to provide standby power to the associated emergency busew.
b. At least cnce per 31 days by verifying the fuel level in the plant fuel storage tank.
c. At least once per 91 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTH-D270-65, is within the acceptable limits specified in Table 1 of ASTH-D975-74 when checked for viscosity, water and sediment,
d. At least once per +$('GN months during shutdown by:
1. Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service,
2. Verifying the generator capability to reject a load equal to one core spray pump without tripping,
  • The diesel generator start (10 seconds) from ambient conditions shall be performed at least once per 184 days in these surveillance tests. All other engine starts for the purpose of this surveillance testing may be preceded by a manually initiated engine prelube period and/or other warmup procedures recommended by the manufacturer so that .techanical stress and l wear on the diesel engine is minimized.

BRUNSWICK - UNIT 2 3/4 8-4 Amendment No. 134

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ . __- ______ _ __ ___ - __ . . . . . . - .