ML20028D978
| ML20028D978 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah, 05000000 |
| Issue date: | 08/30/1973 |
| From: | Gilleland J TENNESSEE VALLEY AUTHORITY |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20028D960 | List: |
| References | |
| FOIA-82-556 6609, NUDOCS 8301200191 | |
| Download: ML20028D978 (2) | |
Text
.
P*
'v8
- g a.- i*
- .pg_
- /
e-a, i
'i.l.' o
- /~,
6 s
\\
l*
9 (.>
- - - l in.
,, :m (J6; f
. ' i I. 8
$>/L
- i I.
II J. t iJ r
s!,
4
('
e s.
.~
\\.';-_J 1
e s_
.4 %
Tl
<M
?. ; '. s
.g I
V
/Cf d
- .9
- d[,a ';0'-
i c1.
l Mr. Angelo Giambusso i
I 2
k,, (I'g/gk
/h's Deputy Director for neccter Projects Directorate of Lic. r....
h
(
[..,f%;.
l U.S. Atomic Energy Cer,1ccion
- .{.f Washington, DC 20545
./_x
.s E %- \\
Dear Mr. Giambusso:
~~ -
In the Matter of the Applications of )
Docket Ios'. 50-327 Tennessee Valley Authority
)
50-328 I
As a consequence of unanticipated delays, construction has been slowed significantly and the schedule for fuel loading and I
co==crical operation for the Sequoyah :uclear Plant has been i
revised to encompass these delays.
Specific atens which caused these delays are outlined below:
1.
As required by the AEC, the subcompartment pressures in the containment structure were recalculated including two-phase flow and dynamic forces effects.
This resulted in nodifica-i tions to the ice conden'ser design because of structural loading changes.
These design nodifications resulted in a significant delay in plant construction schedule.
2.
The Emergency Core Cooling System was nodified by the additiot.
of the Upper Head Injection Systen.
This was a major design effort and necessitated structural changes to the reactor building in addition to the more obvious direct systc= changes.
3.
Due to the advanced nature of consitruction, separation of liquid waste into tritiated and nontritiated drains to avoid
{
release of tritium caused changes in the drain system and consequently added construction delay ti=c.
t l
l The above design changes are being made in the interest of safety and for the protection of the envirorment.
i 4
s 8301200191 821213 GGO.9 PDR FOIA STECMEL82-556 PDR
(
r 4V-
' Mr. Angelo Giambusso 4.
The productivity level for Se uoyah Nuclear Plant was originally projected on the basis of czperience in the construction of fossil plants.
Due to the increasing compicxities of nuclear power plant construction, plu.n the increasing emphasis on the quality control of the constructica of safety-related items, a lower level of productivit:, han resulted.
It is estf.:sted that delays have caused cn cdditional 20 months of construction time.
New dates for cath unit cre listed:
Fuel Londir,
Commercial Operation j
Unit 1 June 1, 1975 December 1, 1975
,i Unit 2 February 1, 1976 August 1, 1976 In accordance with the Commission's regulations contained in Section 50.55(b) of 10 CFR Part 50, the Tennessee Valley Authority hereby i
requests that the construction permit be extended as specified:
1.
Provisional Construction Permit No. CPPR-72 (unit 1) from i
October 1, 1973, to June 1, 1976 l
2.
Provisional Construction Permit No. CPPR-73 (unit 2) from l
April 1, 1974, to February 1, 1977 It is anticipated that the, revised dates will provide sufficient time for completion of each unit.
Very truly yours, l
L k a] f L. d
^
J. E. Gilleland Assistant to the Manager of Power l