m JAN 5 1983 Docket No. 50-206 a
l Southern California Edison Company l
P. O. Box 800 2244 Walnut Grove Avenue Rosenead, California 91770 Attention: Dr.L.T.Piipay,VicePresident Advanced Engineering Gentlenen:
Subject:
Systematic Assessment of Licensee Perfonnance (SALP) and SCE Letter deted Decemi,er 3. 1982 j
This refers to the SALP for San Onofre Nuclear Generating Station, Unit 1, conducted by this office on August 17, 1982. and discussed with your staff at a meeting i
on Novenber 8,1982. The list of attendees is attached as Enclosure 1.
The NRC Region V SALP report is attached as Enclosure 2 and covers the period of July 1, 1981 through June 30, 1982. Southern California Edison Cumpany letter, dated Decenber 3,1982, which we requested in our letter dated October 18, 1982, provided your coments and comitments for performance improvement and is attached
{
as Enclosure 3.
j Overall, we find that your performance of licensed activities generally is acceptable l
and directed toward safe facility operation.
In the area of Emergency Preparedness, we found your management attention and involvement to be aggressive and oriented toward nuclear safety, resulting in a high level of perfonnance. In addition, we note that you have taken significant actions to improve your performance in the areas of Plant Operations, Radiological Controls, Maintenance, Security and Safeguards, and Design Changes and Modifications. These were areas r:here the SALP Board found increased, or sustained managenent attention was necessary by
(
both the NRC and Southern California Edison Company.
At our meeting on Novenber 8,1982, we discussed our assessment of your regulatory l
performance, your comments on the SALP Program and Region V's assessment, and the actions that you are taking to improve your performance. We have also reviewed your letter of Decenber '3, '1982, and determined that your actions to improve performance in the areas needing particular attention are responsive. We consider that our meeting was beneficial and improved mutual understanding of your activities i
and our regulatory program. Based on your connents during our meeting and your Decenber 3,1982 letter, we have found no changes to our assessment aro necessary.
We have, however, evaluated the comments contained in your letter of December 3, f
l 1982(Enclosure 3). The results of our evaluation are provided in Enclosure 4.
[
8301100253 e30105 M
J-ponAnacKosooog y
y o
i
.o mo.....nc.of&.........nsHbe......cnks...... E NGEMER.......
.....1.6L8.3........... 11.%.B.3..1L&L83.....
- 11. 5283.......
wn OFFICIAL RECORD COPY um m-m.m NRC FORM M8 00-80) NRCM 029
(
SouthIrn Califtrnia Edison Company g
.i G83 In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in the NRC Public Document Room. No reply to this letter is required.
Your actions in response to the NRC Systematic Assessment of Licensee Performance will be examined during future inspections.
Your cooperation is appreciated.
Sincerely, Urtdathne5 h E. E Engea n R. H. Engelken Regional Administrator
Enclosures:
1.
SALP Management Meeting Attendees 2.
USNRC Region V Systematic Assessment of Licensee Performance, San Onofre
?.uclear Generating Station Unit 1, August 17, 1982 3.
SCE Response Letter, R. Dietch to R. Engelken, Response to SALP Report, SONGS-1, December 3, 19J2 4
NRC Evaluation of the Licensee's Response to the Draft NRC SALP Report bec: RSB/ Document Control Desk (RIDS)
Distributed by RV:
1 State of CA (Johnson)
RHE'(w/o enclosures)
Resident Inspector l
3
F U. S. Nuclear Regulatory Commission Salp Management Meeting Attendees Licensee: Southern California Edison Company P. O. Box 800
-2244 Walnut Grove Avenue Rosemead, California 91770 Facility Name: San Onofre' Nuclear Generating Station (SONGS) Unit No. 1 Meeting At: Rosemead, California Meeting Conducted: November 8, 1982 1.
Licensee Attendees R. Dietch, Vice President, Nuclear Engineering and Operations
.Dr. L. T. Papay, Vice President, Advanced Engineering A. Arenal, Vice President, Engineering and Construction J. G.'Haynes, Manager, Nuclear Operations H. B. Ray, Station Manager K. W. Baskin, Manager, Nuclear Engineering, Safety and Licensing D. K. Nelson, Project Manager, SONGS-1 D. E. Nunn, Project Manager, S0!iGS-2/3 J. M. Curran, Manager, Quality Assurance Other licensee staff personnel were also in attendance.
2.
NRC Attendees R. H. Engelken, Regional Administrator, Region V J. L. Crews, Director, Division of Resident, Reactor Projects and Engineering Programs, Region V G. S. Spencer, Director, Division of Rcdiological Safety and. Safeguards Programs, Region V T. W. Bishop, Chief,. Reactor Projects Branch No. 2, Region V L. F. Miller, Senior Resident Inspector, SONGS-1 A. E. Chaffee, Senior Resident Inspector, SONGS-2/3 W. A. Paulson, Project Manager, SONGS-1, NRR H. Rood, Project Manager, SONGS-2/3, NRR