ML20028C453

From kanterella
Jump to navigation Jump to search
Forwards Div of Operating Reactors Proposed Action on Prevention of Offgas Explosions Per IE Bulletin 78-03.Review of Criterion 2 & Other Comments Requested by 790209. Background Info Provided
ML20028C453
Person / Time
Issue date: 01/30/1979
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Brunner E, Crews J, Fiorelli G, Long F, Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20027A594 List: ... further results
References
FOIA-82-545 IEB-78-03, IEB-78-3, NUDOCS 8301100197
Download: ML20028C453 (2)


Text

_

_5 N

.-. y 8

UNITED STATES

, 'Q,

j y*-

g NUCLEAR REGULATORY COMMISsICN f

g,,4x jg WASHINGTON, D. C. 20555 JAN 3 01979 MEMORANDUM FOR:

E. J. Brunner, Chief, RO&NSB, RI F. J. Long, Chief, RO&NSB, RII G. Fiorelli, Chief, RO&NSB, RIII G. L. Madsen, Chief, RO&NSB, RIV J. L. Crews, Chief, RO&NSB, RV FROM:

E. L. Jordan, Assistant Director for Technical Programs, IE

SUBJECT:

INFORMATION REGARDING PROPOSED DDR ACTION ON PREVENTION OF OFFGAS EXPLOSIONS Enclosed for your information and review is a copy of DOR's proposed action on the BWR offgas explosion problem.

This proposed action includes criteria (Enclosure 1) which are preliminary at this time and subject to revision..We have indicated by notations in the margin our opinions on each of these criteria.

In DOR's opinion, Criterion 2 was intended to reflect on the licensee action requested by Item 1 of IE Bulletin 78-03.

Please review this criterion with the involved inspectors and inform me of any cases where the inspection effort did not ascertain the adequacy of such instrumentation.

In addition, feel free to comment on the other criteria and actions proposed by DOR, particularly where you see a problem.

We need this information by February 9,1979. ~

To place the above action in perspective, background information is identifi'ed below and was provided to you previously:

1.

Memorandum, R. W. Foodruff to E. J. Brunner, et al, dated August 25, 1978, regarding inspection of licensee responses' to IES 78-03 and enclosing the GA0 report and transmittal to the Commission.

2.

Memorandum, E. L. Jordan to E. J. Brunner, et' al, dated November 29, 1978, with an enclosure copy of the Commission response to Congress regarding the NRC action on offgas explosions.

CONTACT:

C. J. DeBevec, TP 49-28180 8301100197 821207 2

PDR FDIA HIATT82-545 PDR L

O-

. a.-

Multiple Addressees 2

JAN 3 01979 3.

Copy of report of IE review of licensee responses to IES 78-03 which was transmitted to DOR by memorandum, E. L. Jordan to B. K. Grimes, dated November 29,1978, with 18 enclosures con-taining summaries of IE inspection of offgas systems.

k-u& tCk Y $b:.

Edward L. Jordan, Assistant D' ector for Technical Programs Division of Reactor.0perations. Inspection

Enclosure:

Memo, B. K. Grimes to E. L. Jordan dtd 1/16/79 with enclosures 9

cc: w/ encl.

N. C. Moseley, IE w/o encl.

L. H. Barrett, 00R R. Lo 00R t

e e

k e

7 G

+

e 1

h

..