Vol.11, No.10 7
~ ~ ~ ---
REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS LBLUE BOOK?
SEPTEMBER 15 - OCTOBER 15,1982 1
UNITED STATES NUCLEAR REGULATORY COMMISSION
,s*"'%,,
s
?
+
b l
4 i
i i
i i
Available from I
NRC/GPO Sales Program 1
Superintendent of Documents Government Printing Office j
Washington, D. C. 20402 i
A year's subscription consists of 12 issues for this publication.
- Microfiche of single copies are mailable from NRC/GPO Sales Program Washington, D. C.'20555 -
i I
k i
l Vol.11, No.10 l
REGULATORY LICENSING STATUS
SUMMARY
REPORT l
NUCLEAR POWER PLANTS l
DATA FOR DECISIONS (BLUE BOOK)
SEPTEMBER 15 - OCTOBER 15,1982 Manuscript Completed: October 1982 Date Published: October 1982 Prepared for: 0FFICE OF NUCLEAR REACTOR REGULATION Prepared by: OFFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555
)
1 F0REW0RD THIS MANAGEMENT REPORT, REGutATORY LICENSING STATUS
SUMMARY
REPORT, IS DESIGNED 10 PROVIDE THE HECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION NUCLEAR REACTOR i
APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF NUCLEAR REACTOR REGULATION. OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION 8 ENFORCEMENT, AND THE NATIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATI0H SYSTEM.
SECTION I OF THIS EDITIDH CONSISTS OF THE THREE
SUMMARY
OF ACCOMPLISHMENTS, THE NEW APPLICATION FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.
SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL DL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A NON-POWER REACTOR
SUMMARY
EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.
I
LICENSING OF NUCLEAR REACTORS THE U.S. NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - CNE TO BUILD THE FACILITY AND ANOTHER TO OPERATE IT.
LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING LICENSE.
THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSC COVERS THE UTILITY'S FINANC;AL QUALIFICATIONS.
THE NRC MAKES COPIES OF THE APPLICATI0H AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.
TECHNICAL EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT. THESE DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROGM.
THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFEREHCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS.
T.T ACRS FINDINGS ARE REPORTED TO THE HRC AND MADE PUBLIC.
A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPOSED SITE, BY AH NRC APPOINTED ATOMIC SAFETY & LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.
AFTER REVIEWING THE HEARING RECORD INCLUDING THE HRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.
THE BOARD'S DECISIDH IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER NUCLEAR REGULATORY COMMISSION.
IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE.0F A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISION OF AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE LICENSING WILL ISSUE A CONSTRUCTION PERMIT.
CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE NRC STAFF AND THE BOARD HAD RULED FAV0:4BLY ON THE ENVIRONMENTAL IMPACT ANALYSIS, CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTI0h AND ENFORCEMENT.
AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE HRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE HRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.
IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISIDH OF LICENSING AND OF THE COMMISSION.
j a
TABLE OF C0NTEHTS PRINTED IN THE ORDER LISTED l
SECTIOM I
SUMMARY
OF ACCOMPLISHMENTS OL
SUMMARY
OF ACCOMPLISHMENTS CP
SUMMARY
OF ACCOMPLISHMENTS CCMBINED HUMERICAL
SUMMARY
OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE HEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE NEXT FIVE YEARS HEW APPLICATION FORECAST:
OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIM THE PUBLICATION SECTION II PROJECT INDEX OPERATING LICENSE REVIEWS I
CONSTRUCTIDH PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS NON-POWER REACTORS I
$ECTIOM III l
EXAMPLE REVIEW I
1 Z
O H
U La en i
C 2
L 8
A
/
U 6
T 0
C
/
A 0
1 D
E E
2 T
L 8
A U
/
D D
6 E
0 O
H
/
T C
0 S
1 R
A E
Y S
L A
T C
S N
I F
E u
D M
Y T
E H
I 2
L U
S I
8 C
S I
A 1
F S
L D
S N
I P 2 A
8 S
E L
S E
S E
M 9 M
D M
N 1
O R
I O
O S
0 H
M N
H R
E S
S C 5 1
E S
E E
L C
R S
S D
F 0
A E B
O T
F C O
0 F
O C
Y S 2
A L
8 R
A
/
U 6
A T
0 C
/
M A
0 1
M U
S D
E 2
L 8
U
/
L D
6 E
0 0
H
/
C 0
R S 1
E B
O T
C O
M D
Y T
E I
2 L
U I
4 C
S A
1 F
S D
S N
I R
A E
S E
L S
E S
E W
M D
M M
O O
R I
O O
S P
N M
M M
R E
S S
L L
E S
E E
L U
F S
S D
F 0
N 4:!l i
i i
l
)
i ii 1j 1
i l
i:1
r 1
f L
A U
T C
A D
E E
T L
A U
D D
E O
H
~
T C
S R
A E
Y S
L A
T C
S N
f f
E D
M Y
T E
H I
L U
I C
S I
A F
S L
S I
P 2 8
E S
E E
S E
S E
E M 9 N
H M
M M
H 1
O 3
R O
O O
S D
0 M
?
N N
N H
?
R E
S S
C 5 1
E S
E E
P C
R S
S D
F C
A E B
O T
F C O
0 F
O Y S A L
R A
U A
T C
M A
M U
S DE L
U P
D E
C H
C R S E
B O
T C
D D
Y T
E I
L U
I C
S A
F S
S I
E S
E E
S E
S E
E M
M M
M M
M O
O E
O O
O S
O N
N N
N N
N R
E S
S E
S E
E P
S S
D F
C 1
ijil"
!4 1!i!
i11 ii, a4 l
1 I!1 4
5UMMARY 0F ACC0MPLI$HMENTS AS OF OCTOBER 15, 1982 0CTOBER FISCAL YEAR TO DATE SCHEDULED ACTUAL SCHEDULED g
SER'S( 0L) 0 0
$ER'S( 0L) 8 s
SSER ' S( 0L) 1 1
SSER'S( 0L)
I 1
SSER ' S( CP) 0 0
SSER'S( CP) 0 0
DES'S( 0L) 0 0
DES'S( 0L) 0 0
DE5'S( CP) 0 0
DES'S( CP) 0 0
FES'S( 0L) 0 0
FES'S( 0L) 0 0
FES'S( CP) 0 0
FES'S( CP) 0 0
0L'S I55UEDM 0
0 0L'S I5SUEDM 0
9 CP'S ISSUED 0
0 CP'S ISSUED 0
.0 M FULL POWER
LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OFs 10/15/82 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1982-1983)
(LISTED IN ORDER OF FACILITY MAME)
SER SSER EST.
STAFF TECM STAFF TECM ASLB COMME APPL.
DELAY ISSUE IMPUT ISSUE ACRS ISSUE IMPUT ISSUE START INITIAL DEC.
CONST.
PLANT (MONTHS) RE1 TO DL 1ER HIS Eli TO DL 11ER OF HRG DECISION RAIE COMPL.
BYROM 1 8.
11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 10/82 03/83 07/83 08/83 08/83 CLINTON 1 0
12/81C 12/81C 02/82C 03/82C 05/82C 06/82C 07/82C 11/82 09/83 12/83 01/84 COMANCHE PEAK 1 0
05/81C 07/81C 07/81C 11/81C 09/81C 10/82 06/83 12/81C 01/83 05/83 06/83 DIABLO CANYOH 1 0
12/72C 01/75C 10/74C 07/76C 05/76C 01/83 02/83 12/76C 07/81C DIABLO CANYOH 2 0
12/72C 01/75C 10/74C 07/76C 05/76C 01/83 N/S 12/76C 07/81C ENRICO FERMI 2 0
04/81C 05/77C 09/77C 08/81C 09/81C 10/82 11/82 03/82C 10/82 05/83 08/83 GRAND GULF 1 6
05/81C 08/81C 09/81C 10/81C 10/81C 10/82 11/82 N/A N/A 12/82 06/82C LASALLE 2 0
03/78C 02/81C 03/81C 04/ SIC 11/78C 10/82 11/82 N/A N/A 03/83 04/83 MCGUIRE 2 0
10/75C 01/78C 03/78C 04/78C 04/76C 12/82 01/83 03/77C 06/81C 03/83 04/83 MIDLAND 1 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 11/83 11/82 07/83 11/83 12/83 MIDLAND 2 1
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/82 07/83 08/83 07/83 PALO VERDE 1 0
10/81C 10/81C 11/81C 12/81C 03/82C 08/82C 09/82C 04/82C 10/82 07/83 08/83 PERRY 1 0
02/82C 05/82C 05/82C 07/82C 08/82C 07/82C 10/82 02/83 08/83 10/83 11/83 SAN ONOFRE 3 9
01/81C 01/81C 02/81C 02/81C 04/81C 11/82 11/82 06/81C 05/82C 11/82 11/82 SHOREHAM 3
03/77C 03/81C 04/81C 10/81C 10/77C M/S 11/82 05/82C 05/83 06/83 03/83 ST LUCIE 2 0
10/81C 09/81C 10/81C 11/81C 04/82C 08/82C 09/82C M/A N/A 01/83 01/83 SUMMER 1 2
06/79C 12/80C 02/81C 03/81C 05/81C 07/82C 08/82C 06/81C 08/82C 10/82 08/82C-SUSQUENANNA 1 3
03/81C 03/81C 04/81C 08/81C 07/81C 07/82C 07/82C 10/81C 04/82C 10/82 07/82C SUSQUEHANNA 2 0
03/81C 03/81C 04/81C 08/81C 07/81C 07/82C 03/83 10/81C 04/82C 12/83 01/34 WASHINGTON NUCLEAR 2 0
07/81C 05/82C 03/82C 10/82C 12/81C 11/82 11/82 N/A N/A 08/83 09/83 WATERFORD 3 0
05/81C 05/81C 07/81C 08/81C 09/81C 09/82C 10/82 03/82C 10/82 04/83 05/83 WATTS BAR 1 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 09/82C M/A N/A 07/83 08/83 ZIMMER 1 2
10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C 06/82C 11/83-09/83 WLICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDHESS REVIEW.
(
l l
l
LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1983 ISSUE APPL. CONST.
PLANT 111g COMPLETE BELLEFONTE 1 09/84 05/85 BELLEFONTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 04/86 BYRON 2 N/S 04/84 CALLAWAY 1 12/82 04/84 CATAWBA 1 04/83 11/84
, CATAWBA 2 N/S 03/87 CLINTON 2 N/S COMANCHE PEAK 2 11/83 12/84 FERMI 2 (FSAR RESUB)
GRAND GULF 2 N/S N/S I
HARRIS 1 01/84 12/84 HARRIS 2 N/S 06/88 LIMERICK 1 10/83 10/84 LIMERICK 2 N/S PALO VERDE 2 10/83 08/84 PALD VERDE 3 N/S 11/85 PERRY 2 N/S 05/87 RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SEABROOK 1 03/83 05/84 SEABROOK 2 02/86 i
SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 i
WASHINGTON NUCLEAR 1 N/S N/S i
WASHINGTON NUCLEAR 3 12/84 12/85 WATTS BAR 2 06/84 08/84 WOLF CREEK 1 08/82C 10/84 I
i i
LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS RFPORT AS OF8 10/15/82 (LISTED IN ORDER OF FACILITY HAME)
SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
PLANT R11 TO DL 1ER 11LQ EE1 TO DL 111R OF HRG DECISION DAIX CSP)FNP t-8 (MANUF.)
07/74C 08/75C 09/75C 04/76C 10/75C 03/76C 09/81C 06/76C 06/82C 10/82 CLINCH RIVER 02/76C 01/83 03/83 05/83 02/77C 06/83 07/83 08/82C 04/84 06/84 PEBBLE SPRINGS 1 8 2 01/75C 12/75C 01/76C 02/76C 04/75C 12/77C N/S N/S N/S N/S i
SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 01/83 12/82 10/82C 11/82 07/75C 04/83 07/83 i
1 1
NEW APPLICATION F 0 R E C A S T --- 0 P E R A T I N G LICEN$E REVIEWS (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)
AS OF WEEK ENDING 10/15/82
______=_____-.. _________.....=
=.------.......... _
LICENSING APPL.
APPL.
IST UNIT DOCKET PROJECT SUBMITS SUBMITS CONST.
FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL FY83 WASHINGTON NUCLEAR 3 050-00508 WASHINGTON PUBLIC POWER SUPPLY L. WHEELER 06/02/82C 06/08/82C 12/08/85 D.SWAMSON
======------==_______==.....-- ------.....--
FY83 MILLSTONE 3 050-00423 NORTMEAST NUCLEAR ENERGY
. UNASSIGNED 11/01/82 11/01/82 12/08/85 M.ROTMSCNILD MARBLE HILL 1&2 054680547 PUBLIC SERVICE OF INDIANA E.DOOLITTLE 12/01/82 12/01/82 06/08/86 R.LES$Y BEAVER VALLEY 2 050-00412 DUQUESNE LIGNT
.E.DOOLITTLE 12/31/82 12/31/82 12/31/85 J.GUTEIRREZ NINE MILE POINT 2 050-00410 NIAGARA MONAWK PCWER D. LYNCH 01/08/83 01/08/83 03/08/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 4 GAS
. UNASSIGNED 03/06/83 03/00/83 06/08/86 R. BLACK V0GTLE 1 8 2 0424-0425 GEORGIA POWER E.DOOLITTLE 07/00/83 09/00/83 09/08/86 B.BORDEMICK
.----------.=_==___.---------------...-.__ _ __-_=_-.
____-=====
FY86l NORTH ANNA 3 050-00404 VIRGINIA ELECTRIC 8 POWER
. UNASSIGNED 04/00/86 04/08/86 04/08/89 M.WILCOVER l
_.~.....
.............--..--------------------..----------- ____=______==--------- --=-- ______ ---....==-__=-__ _.--________
NEW ' APPLICATION F 0 R E C A S T -- C 0 N 5 T R U C T I O N PERMITS AS OF WEEK ENDING8 10/15/82
___.-_..........=______ __=......._______......._______......____.....__
I MAME FACILITY PROJECT PROJECT APPL. ER APPL. PSARl UTILITY HUMBER MANAGER SUB. DATE SUS. DATE l
--..........._ ______=====....- _______ -.----.....--..........- __ _____-__.-...--__________-....--.........-....
MM-m_
__-..--_____.W_e6--
-___.m.-______-
_ _- _ _ _ --- -. e m m e.... m.... W... m m - m e m e.e......W W e e m.. m W e e m...W.e m..m e. e m. m. m.
l CARROLL 1 8 2 COMMONWEALTH EDISON 559 J. WILSON 10/08/84 10/08/84 l
--- _- ____ =.-
_-===___=----......____
---........ =__===-------.....--------.----------....--........-----.
I t
4
(
C0MM0N ABBREVIATIONS USED WITHIN THE PUBLICATION ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:
LICENSING ASSISTANT AE ARCHITECT / ENGINEER LESR LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)
AEB ACCIDENT EVALUATION BRANCH
.6GRI LICENSING GUIDANCE BRANCH ASB AUXILIARY SYSTEMS BRANCH LMFBR LIQUID METAL FAST BREEDER REACTOR ASLB ATCMIC SAFETY LICENSING BOARD LGB:
LICENSEE QUALIFICATIONS BRANCH B8R BURNS 8 ROE MEB MECHANICAL ENGINEERING BRANCH 38V BLACK 8 VEACH MPA:
MANAGEMENT AND PROGRAM ANALYSIS-B8W BABCOCK 8 WILCOX MTES: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MWE MEGAWATTS ELECTRIC BRRT: BPOWN 8 ROOT MWT MEGAWATTS THERMAL BWR BOILING WATER REACTOR NSSS: NUCLEAR STEAM SYSTEMS SUPPLIER CES:
CHEMICAL ENGINEERING BRANCH OL OPERATING LICENSE COMB CCMBUSTION ENGINEERING OLB OPERATOR LICENSING BRANCH CP:
CONSTRUCTIDH PERMIT OPS:
OFFSHORE POWER SYSTEMS CPB CORE PERFORMANCE BRANCH CSB:
CONTAINMENT SYSTEMS BRANCH CWE COMMONWEALTH EDISON PDA:
PRELIMINARY DESIGN APPROVAL PG8E8 PACIFIC GAS 8 ELECTRIC DES:
DRAFT ENVIRONMENTAL STATEMENT PID:
PARTIAL INITIAL DECISION PM:
PROJECT MANAGER PS:
POWER SYSTEMS BRANCH EEB ENVIRONMENTAL ENGINEERING BRANCH PSAR PRELIMINARY SAFETY ANALYSIS REPORT EPA:
ENVIRONMENTAL PROTECTION AGENCY PTRBs PROCEDURES AND TEST REVIEW BRANCH EPLB EMERGENCY PREPAREDNESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR ER:
ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH ETSB EFFLUENT TREATMENT SYSTEMS BRANCH RAB RADIOLOGICAL ASSESSMENT BRANCH F.R.:
FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH FDA:
FINAL DESIGN APPROVAL FES:
FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT
$8La SARGENT 8 LUNDY
$8W STONE 8 WEBSTER SAB '
SITING ANALYSIS BRANCH G8H GIBBS 8 ilILL SAR:
SAFETY ANALYSIS REPORT GHDRs GIBBS & HILL SDA:
STANDARD DESIGN APPROVAL GIL:
GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB GEOSCIENCES BRANCH SER:
SAFETY EVALUATION REPORT SIB:
SYSTEMS INTERACTION BRANCH SPs SPECIAL PROJECT HGB:
HYDROLOGIC AND GE0 TECHNICAL BRANCH SSC:
SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATP,RE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION TVA TENNESSEE VALLEY AUTHORITY ICB:
INSTRUMENTA TION AND CONTROL BRANCH UEC UNITED ENG. A CONSTRUCTORS UFB UTILITY FINANCE BRANCH WEST WESTINGHOUSE
M M
Z Q
M H
O taJ th I
l
PR0 JECT INDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 SELLEFONTE 1 & 2 2-34 CLINCH RIVER 2-37 (BOP)BOPSSAR/BSAR-205 2-47 (SP)FMP 1-8 (MANUF.)
2-2 BRAIDWOOD 1 & 2 2-35 PEBBLE SPRINGS 1 & 2 2-38 (BOP)ESSAR/BSAR-205 2-48 CARROLL SITE 2-3 BYROM 1 &2 2-36 SKAGIT/HANFORD 182 2-39 (80P)ESSAR/CESSAR-80 2-4 CALLAWAY 1 2-40 (50P)ESSAR/RESAR-414 2-5 CATAWBA 1&2 2-41 (BOP)GAISSAR 2-6 CLINTON 1&2 2-42 (BOP)GIBBSSAR (W) 2-7 COMANCHE PEAK 1 &2 2-43 (BOP)$WESSAR/BSAR-205 2-8 DIABLO-CANYOH 1&2 2-44 (HSS)CESSAR SYSTEM 80 2-9 ENRICO FERMI 2 2-45 (NSS)GESSAR SEVERE ACC 2-10 FERMI 2 (FSAR RESUB) 2-46 (HSS)GESSAR-238 NI 2-11 GRAND GULF 1 &2 2-12 HARRIS 1 &2 2-13 LASALLE 2 2-14 LIMERICK 1 & 2 2-15 MCGUIRE 2 2-16 MIDLAND 1 & 2 2-17 PALO VERDE 1,2,3 2
2-18 PERRY 1 & 2 2-19 RIVER BEND 1&2 a
2 SAN ONOFRE 3 2-21 SEABROOK 1&2 2-22 SHOREHAM 2-23 SOUTH TEXAS 1 & 2 2 '24 ST LUCIE 2 2-25 SUMMER 1 2-26 $USQUEHANNA 1&2 2-27 WASHINGTON NUCLEAR 1 2-28 WASHINGTON NUCLEAR 2 2-29 WASHINGTON NUCLEAR 3 2-30 WATERFORD 3 2-31 WATTS BAR 1&2 2-32 WOLF CREEK 1 2-33 ZIMMER 1
e MRR LICENSING SYSTEM PAGE N08 2-1 BELLEFONTE 1 & 2 0L CURRENT STATUS REPQRT REPORT AS OF8 10/15/82 P L A H.T CHARACTERI5TICSt KEY P E R S 0 N N E La DOCKET NO:
043880439 LIC. PM:
D. SCALETTI ASLB CHAIR: N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 18 N/A LOCATION:
6 MI NE OF SCOTTSBORD, ALA LIC. LA.8 M. DUNCAN MEMBER 2 N/A REGION:
2 AE TVA COUNSEL:
B. PATON CONST. INSPs R. CRLENJAK REAC. TYPE: PWR NSSS: 58W ANTITRUST J. RUTBERG RESID. INSPs J. WILCOX DESIGN PWR 3760 MWT/1235 MWE CONST TVA RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES 8 SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the review schedule has been delayed. The applicant has ER DOCKETED:
06/12/78 06/12/78C announced a delay in loading fuel to 05/85.
The ER SITE VISIT COMPLETE:
02/20/82 06/17/82C staff is currently evaluating the impacts of this INPUT TO DES TO PM8 10/31/82 delay on the safety review schedule.
ISSUE DES:
01/15/83 RESPONSE TO COMMENTS ON DES:
05/22/83 ISSUE FES:
06/20/83 CURRENT ENV. STATUS:
As a result of applicant's construction delay, the review schedule was delayed, and is being re evaluated.
SAFETY / NEARING MILESTONES:
The environmental site visit was completed on 6/17/82.
APPLICATION TENDERED:
02/03/78 02/03/78C SAR DOCKETED:
06/12/78C SAR Q'S RECEIVED BY PM:
11/01/82 SAR APPL. RESPONSE TO 4'S RECEIVED: 02/28/83 CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/15/83 No hearing is anticipated.
ISSUE DRAFT SER:
INPUT TO SER8 03/15/84 ISSUE SER:
05/15/84 ACRS FULL COMMITTEE MEETING 8 07/08/84 INPUTS TO SE SUPPLEMENT 18 07/29/84 ISSUE SE SUPPLEMENT 18 09/15/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST Pending determination NEARING STARTED:
N/A ASLB INITIAL DECISIDH8 N/A ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
03/00/85 COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT 8 ISSUE FULL POWER LICENSE AMEND:
05/08/85 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
On 07/06/82 TVA revised fuel load date to 5/85.
Staff is CONSTRUCTION COMPLETION - APPL.:
05/00/85 07/06/82 evaluating impact on safety and environmental review schedules.
_I
MRR LICEN5IMG SYSTEM PAGE MO: 2-2 BRAIDWOOD 1 8 2 0L CURRENT STATUS REPQRT REPORT AS OF 10/15/82 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E La DOCKET MO:
845680457 LIC. PM:
K. KIPER
?.SLB CHAIR:
M. MILLER APPLICANT COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1:
R. COLE LOCATIOMs 24 MI SSW OF JOLIET, ILL LIC. LA.:
M. RUSHBROOK MEMBER 28 D. CALLIHAM REGIDH 3
AE
$8L COUNSEL 8 D. HASSELL CONST. INSP J. HEISLER REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSPt L. MCGREGOR DESIGN PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST M. KING CURRENT SAF. STATUS ENVIRONMENTAL MILESTONES 8 SCHED. DATE ACTUAL DATE Several portions are under contract review.
ER DOCKETED:
11/3C/78C ER SITE VISIT COMPLETE:
04/15/83 INPUT TO DES TO PM:
11/01/83 ISSUE DES:
01/00/84 RESPONSE TO COMMENTS ON DES:
04/01/84 ISSUE FES:
06/00/84 CURRENT ENV. STATUS:
Inactive.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/LO/78 11/30/78C SAR Q'S RECEIVED BY PM:
12/01/82 SAR APPL RESPONSE TO 9'S RECEIVED: 03/01/83 CURRENT HRG. STATUS 8 INPUT TO DRAFT SER TO PM:
05/01/83 There will be a contested hearing.
ISSUE DRAFT SER:
09/20/83 INPUT TO SER:
11/01/83 ISSUE SER:
12/01/83 ACRS FULL COMMITTEE MEETING 01/00/84 INPUTS TO SE SUPPLEMENT 18 04/01/84 ISSUE SE SUPPLEMENT 18 05/00/34 FEMA LETTER RECEIVED:
H#S CURRENT AMTITRUST*
Appilcant has submitted antitrust information pursuant to HEARING STARTED:
10/00/84 Reg. Guide 9.3.
ASLB INITIAL DECISION:
03/00/85 ASLB FINAL DECISIGH 04/00/85 TECH SPECS COMPLETED:
09/00/84 COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMEMDMENT8 ISSUE FULL POWER LICENSE AMEND:
04/00/85 FSAR Amendment No. 38 SCHED. DATE RECEIPT DATE MEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.:
04/06/85 04/14/82
NRR LICEN5ING SY$ TEM PAGE NO: 2-3 BYRON 1&2 0L CURRENT 5TATUS REP 0RT REPORT AS OF8 10/15/82 PLANT CHARACTERI5 TIC 58 KEY PERSONNELa DOCKET NO:
045480455 LIC. PM:
S. CHESNUT ASLB CHAIR:
M. MARGULIES APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 18 R. COLE LOCATIDH 17 MI SW OF ROCKFORD, ILL LIC. LA.:
M. RUSH 8R00K MEMBER 28 D. CALLIMAN REGION:
3 AEs
$8L COUNSEL:
S. GOLD 8 ERG CONST. INSP M. RING REAC. TYPES PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP W. FORNEY DESIGN PWR 3425 MWT/1120 MWE CONST CWE RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER and Supplement 1 have been issued. Several outstanding and confirmatory issues remain to be ER DOCKETED:
11/30/78C resolved prior to licensing.
ER SITE VISIT COMPLETE:
05/31/81.
05/31/8tC INPUT TO DES TO PM 08/15/81 08/15/81C ISSUE DES:
11/05/81 11/ 05/81C RESPONSE TO COMMENTS ON DES:
03/01/82 03/01/82C ISSUE FES:
04/05/82 04/05/82C i
CURRENT ENV. STATUS:
Environmental review completed and FES (NUREG-0848) publi shed in April 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/09/78 11/30/78C t
SAR Q'S RECEIVED BY PM:
08/15/81 08/15/81C SAR APPL. RESPONSE To t'S RECEIVED: 10/15/81 10/15/41C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM8 11/07/81 11/07/81C In discovery. Hearing scheduled to commence in ISSUE DRAFT SER:
March 1983.
IMPUT TO SER:
01/07/82 01/07/82C ISSUE SER:
02/07/82 02/07/82C ACRS-LETTER RECEIVED:
03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 28 08/20/82 08/20/82C ISSUE SE SUPPLEMENT 28 10/22/82 FEMA LETTER RECEIVED:
CURRENT ANTITRUST Applicant has submitted antitrust information pursuant HEARING STARTED:
03/09/83 to Reg. Guide 9.3.
ASLB INITIAL DECISION:
07/09/83 i
ASLB FINAL DECISION:
08/08/83 TECH SPECS COMPLETED:
06/30/83 COMMISSION DECISION:
08/08/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
88/08/83 FSAR - Amendment 38 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.
08/31/83 07/14/82 l
1
NRR LICENSING SYSTEM PAGE NO: 2-4 CALLAWAY 1 0L CURRENT STATUS REP 0RT REPORT AS OF 10/15/32 PLANT CHARACTE2I$TICSt KEY PERS0NNEL DOCKET NO 05000483 LIC. PM:
G. EDISON ASLB CHAIR J. GLEASON APPLICANT:
UNION ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1 G. BRIGHT LOCATION:
10 MI SE OF FULTON, M0 LIC. LA.:
M.
RUSNBROOK MEMBER 28 J. KLINE REGION:
3 AEt BECH COUNSEL:
R. LESSY CONST. INSP8 J. KONKLIN REAC. TYPEt PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP J. NEISLER DESIGN PWRt 3425 MWT/1188 MWE CONST DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80. The SER was issued by HRC on 10/07/81 and the SFR Supplement No. 1 was issued on ER DOCKETED 12/12/80 12/12/80C 01/15/82.
ER SITE VISIT COMPLETE:
12/00/81 12/00/81C INPUT TO DES TO PM:
08/01/81 08/01/81C ISSUE DES:
09/29/81 09/29/81C RESPONSE TO COMMENTS ON DES:
12/01/81 12/01/81C ISSUE FES:
01/29/82 01/29/82C CURRENT ENV. STATUS:
ER was docketed 12/12/80. The DES was issued by HRC on
.09/29/81 and the FES was issued on 01/29/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/25/79 10/25/79C SAR DOCKETED:
08/08/80 08/08/80C SAR Q'S RECEIVED BY PMt 12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM Hearings were held on limited issues during November 1981.
ISSUE DRAFT SER*
N/A The hearing on the one remaining contention, emergency INPUT TO SER:
09/11/81 09/11/81C preparedness, is acheduled for May, 1983.
ISSUE SER8 10/07/81 10/07/81C ACRS LETTER RECEIVED:
11/19/81 11/19/81C INPUTS TO SE SUPPLEMENT 28 01/01/82 01/01/82C ISSUE SE SUPPLEMENT 28 12/00/82 FEMA LETTER RECEIVED:
10/31/82 CURRENT ANTITRUST:
OL review is in progress.
HEARING STARTED:
11/17/81 11/17/81C ASLB INITIAL DECISION:
10/00/83 ASLB FINAL DECISIGHz 11/00/83 l
TECH SPECS COMPLETED:
N/S l
COMMISSION DECISION:
03/00/84 i
ISSUE LIC. WITH POWER RESTRICTION: 04/00/84 i
LATEST AMENDMENT
- ISSUE FULL POWER LICENSE AMEND:
07/00/84 l
l SCllED. DATE RECEIPT DATE l
NEW SLIPS / NOTES:
The Caseload Forecast Panel is reviewing construction CONSTRUCTION COMPLETION - APPL.:
04/00/84 08/7.3/82 i
l progress in order to make a new construction completion
(
schedule estimate. An April 1984 estimate is based on the aoolicant's recentiv revised fuel load date.
l
l NRR LICENSING SY$ TEM PA!E NO: 2-5 CATAWBA 1 42 0L CURRENT STATUS REPORT REPORT AS OF 10/15/82 PLANT C H A R A C T E R I S T I C 5:
KEY PERSONNELa DOCKET NO:
041380414 LIC. PM K. JABBOUR ASLB CHAIR J. KELLEY APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1 D. CALLINAM LOCATION:
6 MI NNW OF ROCK HILL, SC LIC. LA.:
M.
DUNCAN MEMBER 2:
R.
FOSTER REGICH:
2 AE2 DUKE COUNSEL:
G. JOHNSON CONST. INSP P. VAND00RN REAC. TYPE: PWR NSSS: WEST ANTITRUST *
- 8. V0GLER RESID. INSP K. VAN DOORN DESIGN PWR: 3S52 MWT/1145 MWE CONST: DUKE RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER is scheduled to be completed 02/06/83.
ER DOCKETED:
06/11/81 06/11/8tC ER SITE VISIT COMPLETE:
10/15/81 10/15/81C IHPUT TO DES TO PM 06/25/82 07/29/82C ISSUE DES:
08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:
11/01/82 ISSUE FES:
01/05/83 CURRENT ENV. STATUS:
DES was issued on 08/11/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/07/81 04/07/8tC SAR DOCKETED:
06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:
12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/19/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/19/82 Combined hearing anticipated to start 09/83.
ISSUE DRAFT SER:
INPUT TO SER:
01/09/83 ISSUE SER:
02/06/83 ACRS FULL COMMITTEE MEETING:
03/10/83 INPUTS TO SE SUPPLEMENT 18 04/12/83 ISSUE SE SUPPLEMENT 1:
04/30/83 FEMA LETTER RECEIVED -
03/30/83 CURRENT ANTITRUST Complete.
HEARING STARTED:
09/28/83 ASLB INITIAL DECISION:
03/00/84 ASLB FINAL DECISION:
04/00/84 TECH SPECS CD1PLETED:
COMMISSION DECISION:
09/00/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/84 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
CP Amend. Issued 12/23/80 indicating change in ownership.
CONSTRUCTION COMPLETION - APPL.
11/00/84 05/00/82 Staff is reassessing standard assumptions for projecting hearing schedules for plants with const. completion dates bevond '82.
This re-assess. may result in a new schedule.
1
NRR LICEN$ING SYSTEM PAGE N08 2-6 CLINTON 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 10/15/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
046180462 LIC. PM:
H. WILLIAMS ASLB CHAIR:
H. CLARK APPLICANT:
ILLINDIS POWER LIC. BC C. THOMAS MEMBER 1 G. FERGUSON LOCATION:
6 MI E OF CLINTON, ILL LIC. LA.:
P. ANDERSON MEMBER 28
- 0. PARIS REGION:
3 AE
$8L COUNSEL:
R. GODDARD CONST. INSP F. JABLONSKI REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP H. LIVERMORE DESIGN PWR 2894 MWT/0950 MWE CONST: BALDWIN RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed 09/08/80. SER was issued 02/17/82.
Supplement No. I was issued 07/22/82.
ER DOCKETED:
03/01/81 09/08/80C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
12/08/81 12/08/81C ISSUE DES:
12/18/81 12/28/81C RESPONSE TO COMMENTS ON DES:
02/22/82 03/25/82C ISSUE FES:
05/20/82 05/20/82C CURRENT ENV. STATUS:
The draft environmental statement was completed December 1981 The FES was completed May 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/01/79 12/01/79C SAR DOCKETED:
09/08/80 09/08/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Two petitions for leave to intervene were filed. The ISSUE DRAFT SER:
State of Illinois flied under to CFR 2.715(c).
INPUT TO SER:
12/05/81 12/05/81C A prehearing was held on 04/14/81. A second ISSUE SER:
01/05/82 02/17/82C prehearing was held 05/04/82.
ACRS LETTER RECEIVED:
02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 18 06/30/82 06/30/82C ISSUE SE SUPPLEMENT 12 06/30/82 07/22/82C FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Operating license antitrust review completed HEARING STARTED:
11/00/82 March 18, 1982 (SECY-82-120).
ASLB INITIAL DECISION:
09/00/83 ASLB FINAL DECISION:
10/00/83 TECH SPECS COMPLETED:
COMMISSION DECISION:
12/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND '
01/00/84 FSAR Amendment 017, 07/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
IPC announced fuel load date of 1/84 by letter dated CONSTRUCTION COMPLETION - APPL.:
01/00/84 04/21/82 C4/21/82. Stop work orders associated with construction QA may impact fuel load date.
HRR LICEN$ING SY$ TEM PAGE NO: 2-7 COMANCHE PEAK 1 82 0L CURRENT STATUS REPORT REPORT AS OF 10/15/82 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E La DOCKET NO:
044580446 LIC. PM:
S. BURWELL ASLB CHAIR M. MILLER APPLICANT:
TEXAS UTILITIES GENERATING LIC. BC:
B. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:
4 MI N OF GLEN ROSE, TEX LIC. LA.:
M. RUSHBROOK MEMBER 2 K. MCCOLLOM REGIDH 4
AE G8H COUNSEL:
M. ROTHSCHILD CONST. INSP R. TAYLOR REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP D. KELLY DESIGN PWR 3411 MWT/1150 MWE CONST: BRRT RM ANALYST:
M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONESS SCHED. DATE ACTUAL DATE The SER was issued 07/14/81 The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:
01/19/79 01/19/79C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:
06/20/80 08/07/80C issues. SSER 81 was issued 10/16/81 Application was INPUT TO DES TO PM:
08/15/80 04/27/81C reviewed by the ACRS on 11/13/81. SSER 82 responding to ISSUE DES:
04/30/81 05/22/81C the ACRS was issued on 01/20/82. SSER 83 is scheduled RESPONSE TO COMMENTS ON DES:
07/19/81 08/28/ SIC to be issued 10/29/82.
ISSUE FES:
09/18/81 09/24/81C CURRENT ENV. STATUS:
The DES was issued on 05/22/81 The EPA Federal Register Hotice was printed on 05/29/81 and the comment period SAFETY / NEARING MILESTONES:
ended 07/13/81.
The FES was issued on 09/24/81 APPLICATION TENDERED:
03/01/78 03/01/78C SAR DOCKETED:
05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:
12/30/78 02/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/13/79 03/11/81C The first hearing session was held 12/02/81 in Fort Worth.
ISSUE DRAFT SER:
03/31/81 03/31/81C Issues heard were financial qualifications and the INPUT TO SER:
05/22/81 07/08/81C operating QA program. A second and third hearing session ISSUE SER:
07/14/81 07/14/81C on QA/QC during construction were held 06/07-11/82 and 07/26-30/82.
A fourth hearing session is scheduled to be ACRS LETTER RECEIVED:
11/17/81 11/17/81C held 09/13-17/82 on QA/QC during construction. The fifth INPUTS TO SE SUPPLEMENT 3:
10/15/82 hearing session is expected to complete the remaining ISSUE SE SUPPLEMENT 38 10/29/82 contention, emergency plans, and is unscheduled.
FEMA LETTER RECEIVED:
06/00/83 CURRENT ANTITRUST ALJ appointed on 02/23/82 to replace ASLB.
Prehearing HEARING STARTED:
12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.
ASLB INITIAL DECISION:
01/00/83 Briefs filed 05/04/82 request immediate imposition of ASLB FINAL DECISION:
02/00/83 settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED:
05/00/33 approving settlement agreements 8 proposed license COMMISSION DECISION:
05/00/83 conditions 8 ismissing proceedings was issued 05/06/82.
ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT ISSUE FULL POWER LICENSE AMEND:
06/00/83 34 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
SSER 83 has been delayed four weeks by the applicant to CONSTRUCTION COMPLETION - APPL.
06/00/83 10/29/81 supply additional information in the Emergency Plan.
The delay will not impact the hearing schedule.
1 HRR LICEHSING
$YSTEM PAGE N0 2-8 DIABLO-CANYOH 1 8 2 0L CURREHT STATUS REPORT REPORT AS OF 10/15/82 l
PLAHT CHARACTERI5 TIC 5:
KEY P E R S 0 M N E La LIC. PM:
B. BUCKLEY ASLB CHAIR:
J. WOLF l
LOCKET HO:
027580323 APPLICaHT:
PACIFIC GAS 8 ELECTRIC LIC. BC:
G. KNIGHTON MEMBER 18 J. KLINE LIC. LA.:
J. LEE MEMBER 2 G. BRIGHT LfdATIuM 12 MI WSW OF SAN LUIS OBISPD REGIDH 5
AE PG8E COUNSEL:
- 5. JONES CONST. INSP D. KIRSCH REAC. TYPE: PWR HSSS: WEST ANTITRUST J. RUTBERG RESID. INSP J. CARLSON DESIGH PWR 3338 MWT/1084 MWE CONST PG8E RM ANALYST B. ST MARY ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SSER 15 (Equip. Qualification) was issued on 10-02-81.
SSER 16 is estimated for 02/07/83 (indicated as SSER9 ER DOCKETED:
11/09/71 11/ 0 9/71C on schedule). Favorable ASLB Initial Decision on a ER SITE VISIT COMPLETE:
full power license was issued on August 31, 1982.
Low INPUT TO DES TO PM:
10/09/72 10/09/72C Power license was issued on 09-22-81 and suspended on ISSUE DES:
12/12/72 12/12/72C RESPONSE TO COMMENTS OH DES:
04/27/73 04/27/73C ISSUE FES:
09/15/75 05/28/76C Hovember 19, 1981.
CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
07/10/73 07/10/73C SAR DOCKETED:
10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:
01/04/74 01/04/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/01/74C INPUT TO DRAFT SER TO PM:
01/24/75 01/24/75C CURRENT HRG. STATUS:
LP hearings were held 05-19-81 through 05-22-81.
A ISSUE DRAFT SER:
favorable PID on low power operation was issued July INPUT TO SER:
01/24/75 01/24/75C 17, 1981.
A full power hearing was completed on January ISSUE SER:
10/04/74 10/16/74C 26, 1982.
In August an Initial Decision was issued ACRS LETTER RECEIVED:
05/00/78 07/18/78C authorizing issuance of a full power operating Ilcense.
INPUTS TO SE SUPPLEMENT 98 01/25/83 i
ISSUE SE SUPPLENENT 98 02/07/83 J
FEMA LETTER RECEIVED:
11/15/82 CURRENT ANTITRUST HEARING STARTED:
10/29/75 12/07/76C Not required ASLB INITIAL DECISIGHz 07/17/81 07/17/81C ASLB FINAL DECISIDH 09/00/82 08/31/82C TECH SPECS COMPLETED:
09/15/81 09/15/81C COMMISSICH DECISI0H ISSUE LIC. WITH POWER RESTRICTION: 09/22/81 0 9/22.*81 C ISSUE FULL POWER LICENSE AMEND:
N/S LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTIDH COMPLETION - APPL.:
Est. to dates from and of LP hrg to lic. complete dependent upon dev./ approval of State and local Emergency Plans.
Ongoing Design Verif. Program Ilkely to identify olant modifications.
Const. comoletion deoendent on mods.
NRR LICEN$IOG SYSTEM PAGE NO: 2-9 ENRICO FERMI 2 0L CURRENT STATUS REPORT REPORT AS OF 10/15/82 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E La DOCKET HO:
05000341 LIC. PM:
L. KINTNER ASLB CHAIR:
G. MILLHOLLIN APPLICANT:
DETROIT EDISDN LIC. BC:
J. YOUNGBLOOD MEMBER 1:
P. MORRIS LOCATION:
LAGUNA BEACH, MICH LIC. L A.. :
M. RUSHBROOK MEMBER 2:
D. SCHINK REGION:
3 AE:
S8L COUNSEL:
C. WOODNEAD CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST:
A. H0DGDON RESID. INSP B. LITTLE DESIGN PL" ' 3292 MWT/1093 MWE CONST DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-T1 and a final SER was issued on 07-10-81.
(See second page for milestone ER DOCKETED:
04/04/75 04/04/75C summary.) SSER No. I was issued 09-25-81 SSER No. 2 was ER SITE VISIT COMPLETE:
09/27/78 10/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.
INPUT TO DES TO PM:
07/31/81 04/24/81C SSER No. 3 is scheduled for issuance on 11-30-82.
ISSUE DES:
05/01/81 04/30/81C RESPONSE TO COMMENTS CH DES:
07/31/81 06/29/81C ISSUE FES:
08/31/81 09/04/81C CURRENT ENV-STATUS:
Addendum ho. I to the FES was issued 03-03-82.
SAFETY / HEARING MILESTONES:
4 APrtIC'ATION TENDERED:
10/22/74 ^ 710/22/74C
/
SAR DOCKETED:
04/05/75 04/05/75C
' ~
SAR Q'S RECEIVED BY PM:
06/13/75 G8/11/75C 4
't SAP. APPL. RL)PONSE TO Q'S RECEIVED: 08/29/75 01/12/76C
~
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/24/75 03/08/76C; A hear;ng on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:
04-02-82.
The two contentions were (1) QA/QC during INPUT TO SER:
03/05//6 05/20/77C-construction and (2) adequacy of evacuation plans for ISSUE SER:
08/01/77 09/29/77C the local community. Proposed findings completed by by applicant and staff. Monroe County, Michigan ACRS LETTER RECEIVED:
08/20/81 08/11/S1C petitioned for leave to reopen hearings on the INPUTS TO SE SUPPLEMENT 38 10/30/82 evacuation issue.
ISSUE SE SUPPLEMENT 3:
11/30/82
~
CURRENT ANTITRUST:
, An ASLB decision on antitrust matters was issued on HEARING STARTED:
12/02/81 03/31/~2C 04-25-78.
ASLB INITIAL DECISION:
10/00/82 s'
ASLB FINAL DECISION:
11/00/82 TECH SPECS COMPLETED:
04/01/83 COMMISSION DECISION:
05/01/83 7'
ISSUE LIC. WITH POWER RESTRICTION: N/A ISSUE FULL POWER LICENSE AMEND:
08/01/83 LATEST AMENDAENT:
The latest final Safety Analysis Report Amendment is number
../
SCHED. DATE RECEIPT DATE 4)
~?
NEW $ LIPS / NOTES:
" ^
Issuance of SE Supplement 3 slipped 2 months due to later CONSTRUCTION COMPLETION - APPL.:
08/01/83 10/01/82
- responses from applicant and later SE input.
There is no impact on OL issuance.
- s, / _
b
'N g ap w
N
~
4, '
~
Av p
si 2
J
} ~
r m
L
..h-sr w
+
HRR LICEN5ING SYSTEN PAGE NO: 2-10 FERMI 2 (FSAR RESUB) 0L CURRENT STATUS R E P'O R T REPORT AS OFe 10/15/82 P E R,5 0 N'N[3 La PLANT CHARACTERISTICSt.
KEY DOCKET NO:
00007341 LIC. PM:
L. KINTHER ASLB CHAIR:
G. MILLHOLLIN APPLICENT:
DETROIT EDISON LIC. BC:
J. YOUNGBLOOD MEMBEP. la P. MORRIS LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M. RUSHBROOK MEMBER 2:
D. SCHINK REGION:
3 AE 58L COUNSEL:
C. WOODNEAD CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: GE ANTITR'.' ~*
A. NODGDON RESID. INSP B. LITTLE DESIGN PWR 3292 MWT/1093 MWE CONST DANIEL RM ANALYST S. NEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED DATE ACTUAL DATE All information on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 06-01-78 and
'e safety review was completed. A final SER was i s sue on 07-10-81.
Summary of later milestones is on prs.
us page.
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDEREDt 10/22/74 10/22/74C SAR DOCKETED:
06/01/78 06/01/78C SAR Q'S RECEIVED BY ?M 07/01/78 08/02/78C SAR APPL. RESPONSE TO t'S RECEIVED: 08/08/78 10/02/78C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
09/08/78 03/27/81C ISSUE DRAFT SER:
INPUT TO SER:
06/10/81 06/23/81C ISSUE SER:
06/30/81 07/10/81C CURREN,T ANTITRUST:
LATEST AMENDMENT:
NEW SLIPS / NOTES:
All information on this page reflects the FSAR resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI Dause.
NRR LICEN5ING SYSTEM PAGE NO: 2-11 GRAND GULF 132 LIC CURRENT STATUS REPQRT REPORT AS OFs 10/15/42 PLANT CHARACTERI$TICSt KEY PERSONNEL DOCKET NO:
041630417 LIC. PM D. HOUSTON ASLB CHAIR 8 J. LAURENSON APPLICANT:
MISSISSIPPI POWER S LIGHT COMPANY LIC. BCs A. SCHWENCER MEMBER 1 G. BRIGHT LOCATION:
25 MI 5 0F VICKSBURG, MISS LIC. LA.:
E. HYLTON M EMB ER 2 8 J. MARBOUR REGION:
2 AEs BECH COUNSEL:
M. WAGNER CONST. INSPs R. VANDORM REAC. TYPE: BWR NS$$: GE ANTITRUST B. V0GLER RESID. INSP8 A. WAGNER DESIGN PWR: 3833 MWT/1250 MWE CONST BECH RM ANALYST B. ST MARY CURRENT SAF. STATUS 8 ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.
An initial ACRS meeting was held Oct. 15, 1981.
SSERs were issuod in ER DOCKETED:
06/05/78 06/30/78C December 1981 and in June and July 1982.
A second ACRS ER SITE VISIT COMPLETE:
12/14/79C meeting was held on August 12, 1982 on Hydrogen, HCU INPUT TO DES TO PM:
04/30/81 04/30/81C floor loads, and management staffing and capability.
ISSUE DES:
05/31/81 05/31/81C The ACRS report on full power operation was issued RESPONSE TO COMMENTS ON DES:
08/15/81 08/15/81C August 18, 1982.
ISSUE FES:
09/15/81 10/09/81C CURRENT ENV. STATUS DES was issued in May 1981.
FES was issued October 9, 1981 SAFETY / HEARING MILESTONES 8 APPLICATION TENDERED:
04/28/78 04/28/78C SAR DOCKETED:
06/05/78 06/30/78C SAR Q'S RECEIVED BY PM8 04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C INPUT TO DRAFT SER TO PM:
N/S CURRENT HRG. STATUS Ho hearing is scheduled. Petition was filed by the State ISSUE DRAFT SER*
09/18/81C of Louisiana on basis of Court of Appeals, District of INPUT TO SER:
04/01/81 08/14/81C Columbia, opinion on 5-3 Table issue.
ISSUE SCR:
06/08/81 09/10/81C ACRS LETTER RECEIVED:
07/00/81 08/18/82C INPUTS TO SE SUPPLEMENT 4:
10/29/82 ISSUE SE SUPPLEMENT 48 11/15/82 FEMA LETTER RECEIVED:
10/29/82 CURRENT ANTITRUST OL review is in progress. No significant changes have HEARING STARTED:
N/A ASLB INITIAL DECISION 8 N/A occurred since the CP.
ASLB FINAL DECISIGN8 TECH SPECS COMPLETED:
09/01/81 06/16/82C COMMISSION DECISION:
12/00/82 ISSUE LIC. WITH POWER RESTRICTION 8 04/23/82 06/16/82C ISSUE FULL POWER LICENSE AMEND 8 12/00/82 LATEST AMENDMENT SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
Unit 1 OL authorizing fuel load up to 5% power was issued CONSTRUCTION COMPLETION - APPL.*
06/16/82C 06/16/82. Full power date delayed due to Itcensee's desire to complete number of outstanding items and accomolish maintenance 8 mods for first refuelino outaan.
NRR LICEN$ING SYSTEM PAGE N08 2-12 NARRIS 1 &2 0L CURRENT STATUS REP 0R T REPORT AS OFs 10/15/82 PLANT CNARACTERI5TICSt KEY PERS0NNEL DOCKET ND:
0400-0401 LIC. PM:
P. KADAMBI ASLB CHAIRS J. KELLEY APPLICANT CAROLINA POWER 4 LIGHT LIC. BC:
F. MIRAGLIA MEMBER 1:
G. BRIGHT LOCATION:
20 MI SW OF RALEIGN, NC LIC. LA.
J. LEE MEMBER 28 J. CARPENTER REGIDH 2
AE8 EBASCO COUNSEL:
C. BARTH CONST. INSPs REAC. TYPE: PWR NSSS8 WEST ANTITRUST:
J. RUT 5 ERG RESID. INSP8 G. MAXWELL DESIGN PWR 2775 MWT/0915 MWE CONST DANIEL RM ANALYST
- M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES
- SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81. Review has started.
Questions were sent to the applicant between 4/26/82 ER DOCKETED 12/22/S1 12/22/81C and 7/30/82. Most of appilcant's responses were ER SITE VISIT COMPLETE:
04/08/62 64/08/82C received by 08/31/82.
INPUT TO DES TO PM:
11/19/82 ISSUE DES:
12/17/82 RESPONSE TO COMMENTS ON DES:
04/08/83 ISSUE FES:
05/31/83 CURRENT ENV. STATUS:
ER was docketed on 12/22/81. The site visit was complete on 04/08/82 and questions were sent to appilcant on SAFETY / NEARING MILESTONES 8 04/28/82. Most of the applicant's responses were received by August 17, 1982.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM 10/13/82 Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:
12/01/82 Federal Register on January 27, 1982.
Several petitions INPUT TO SER8 06/01/83 were flied. Prehearing conference on petitions was held ISSUE SER8 07/08/83 on July 13-14, 1982.
ACRS FULL COMMITTEE MEETING:
08/11/83 INPUTS TO SE SUPPLEMENT 18 12/01/85 ISSUE SE SUPPLEMENT 18 01/09/84 FEMA LETTER RECEIVED:
04/00/84 CURRENT ANTITRUST 8 Status to be determined.
NEARING STARTED:
06/01/84 ASLB INITIAL DECISION 8 11/01/84 ASLB FINAL DECISION:
11/00/84 TECH SPECS COMPLETED:
11/01/84 COMMISSIDH DECISION 8 11/00/84 ISSUE LIC. WITN POWER RESTRICTION: 12/01/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/01/84 FSAR No. 4 ER No. 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
12/01/84 04/14/82
MRR LICEMSING SYSTEM PAGE NO: 2-13 LASALLE 2 0L CURRENT STATUS REPQRT REPORT AS OF 10/15/82 PLANT CHARACTERI5*e I C 58 KEY P E R S O N N E L8 DOCKET NO:
65000374 LIC. PM:
A.
BOURNIA ASLB CHAIR 8 M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC. BC:
A. SCHWEBCER MEMBER 18 F. SHON LOCATION 11 MI SE OF OTTAWA, ILL LIC. LA.:
E. HYLTON MEMBER 22
- 0. PARIS REGION:
3 AE8 58L COUNSEL:
C. WOODNE4D CONST. INSP8 H. WESCOTT REAC. TYPE: BWR HSSS: GE ANTITRUST B. V0GLER RESID. INSP8 W. GULDEMOND DESIGN PWR 3293 MWT/1078 MWE CONST: CWE RM ANALYST:
- 5. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHEU. DATE ACTUAL DATE SSER-1 was issued in June 1981 SSER-2 was issued in i
February 1982.
SSER-3 was issued on AprlI 16, 1982.
ER DOCKETED:
01/17/77 05/12/77C l
SSER-4 was i ssued on July 14, 1982.
SSER-5 is scheduled ER SITE VISIT COMPLETE:
l for 11/82.
INPUT TO DES TO PM:
02/17/78 02/17/78C 1
ISSUE DES:
03/22/78 03/29/78C l
RESPONSE TO COMMENTS ON DES:
07/14/78 07/14/78C ISSUE FES:
09/22/78 11/03/78C 1
1 CURRENT ENV. STATUS:
Environmental Protection Pian has been issued with Unit 1 Ilconse.
SAFETY / HEARING MILESTONES APPLICATION TENDERED:
09/01/76 09/01/76C SAR DOCKETED:
04/08/77 05/12/77C SAR Q'S RECEIVED BY PM 07/22/77 07/27/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/15/77 08/18/78C CURRENT HpG. STATUS 8 INPUT TO DRAFT SER TO PM 10/06/78
-11/08/78C Mo hearing.
ISSUE DRAFT SER INPUT TO SER:
12/29/78 02/27/81C ISSUE SER:
09/05/80 03/05/81C ACRS LETTER RECEIVED:
04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 5:
10/00/82 ISSUE SE SUPPLEMENT 58 11/00/82 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
CoopIste.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
04/12/82 04/12/82C COMMISSION DECISION:
03/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/83 SCHED. DATE RECEIPT DATE MEM SLIPS / MOTES:
LasaIIe Unit 1 criticaIlty was achieved on June 21, 1982.
CONSTRUCTION COMPLETION - APPL.:
04/00/83 07/10/82 s
J j
MRR LICEN5ING 5Y5 TEM PAGE N0s 2-14 LIMERICK 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OP 10/95/82 i
PLANT CHARACTERI5 TIC 5:
KEY P E R S O M N E L8 DOCKET NO:
835280353 LIC. PM M. ABELSON ASLB CHAIRS L. BRENNER t
i APPLICANT:
PHILADELPHIA ELECTRIC LIC. BCs A. SCHWENCER MEMBER 1 R. COLE 1
LOCATION:
35 MI NW OF PHILADELPHIA. PA LIC. LA.:
E. NYLTON MEMBER 2 P. MORRIS REGIOMs 1
AEs BECH COUNSEL:
A. NODGDON CONST. INSP REAC. TYPE: BWR M555: GE ANTITRUST:
B. V0GLER RESID. INSPs S. CMAUDNARY DESIGN PWR3 3440 MWT/1965 MWE CONST: BECM RM ANALYST M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCNED. DATE ACTUAL DATE Applicant submittau Probabilistic Risk Assessment with FSAR on M rch 17, 1981 SAR was docketed on 07/27/81.
ER DOCKETEDs 07/27/81 07/27/81C-PRA under review by Brookhaven National Laboratory; draft ER SITE VISIT COMPLETE 8 08/20/82 08/20/82C NUREG/CR on PRA scheduled for issuance 10/15/82.
IMPUT TO DES TO PM:
03/25/83 i
ISSUE DES:
05/06/83 RESPONSE TO COMMENTS ON DES:
09/06/83 ISSUE FES:
10/31/83 CURRENT ENV. STATUS:
4 i
ER was tendered with the FSAR on March 17, 1981 and l
was docketed on 07/27/81 ER site visit was completed SAFETY / NEARING MILESTONES:
on 8/20/82.
APPLICATION TENDERED:
01/08/81 05/17/81C SAR DOCKETED:
07/27/81 07/27/41C 5AR 4'S RECEIVED BY PM:
07/08/82 08/40/82C SAR APPL. RESPONSE To t'S RECEIVED: 10/31/82 CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM 01/07/83 Notice of Opportunity of Nearing was published in the ISSUE DRAFT SER:
02/04/83 Federal Register on August 21, 1981.
Pre-hearing IMPUT TO SER:
07/01/83 1
i ccnference held January 6-8, 1982.
A special pre-hearing ISSUE SER:
08/04/83 conference order was issued on June 1,
1982.
Early hearings on three contentions related to Point Pleasant diversion ACRS FULL COMMITTEE MEETING 09/08/83 i
were held the week of October 4, 1982, and will continue INPUTS TO SE SUPPLEMENT 18 10/07/83 i
during the week of October 18, 1982.
ISSUE SE SUPPLEMENT 1 10/30/83 FEMA LETTER RECEIVED:
10/07/83 CURRENT ANTITR'JST*
Status to be determined.
HEARING STARTED:
04/08/84 ASLB INITIAL DECISION 09/08/84 ASLB FINAL DECISION:
10/08/84 TECH SPECS COMPLETED:
N/$
COMMISSION DECISIOMs 10/08/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND: '
10/09/84 M/S Rev. 6, September 28, 1982 (ER OL)
Rev. 10, September 28, 1982 (F5AR)
SCHED. DATE RECEIPT DATE NEW SLIP 5/ NOTES:
CONSTRUCTION COMPLETION - APPL.s 10/08/84 04/27/82 i
9 y
r.
u
MRR LICEN5ING SY5 TEM PAGE N0s 2-15 MCGUIRE 2 0L CURRENT 5TATU5 REPQRT REPORT A5 0Fs 10/15/42 PLANT CHARACTERI5 TIC 58 KEY PER50NNEL DOCKET ND 05000370 LIC PMt R. BIRKEL ASLB CHAIR 8 R. LAZO APPLICANT DUKE POWER LIC. BC8 E. ADENSAM M EMB ER 18 X. HAND LOCATION:
17 MI N OF CHARLOTTE, NC LIC. LA.:
M. DUNCAN MEMBER 28 E. LUESKE REGION:
2 AE2 DUKE COUNSELt J. CU1 CHIN CONST. INSP M. NUNT REAC. TYPE: PWR M555: WEST ANTITRUST B. V0GLER RESID. INSP8 P. BEMIS DESIGN PWR 3411 MWT/1180 MWE CONST DUKE RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Input for SSER 6 (55ER for unit 2) is due to DL on 12/01/82, with issuance of the supplement scheduled ER DOCKETED:
05/31/74 05/31/74C f or 01/01/83.
ER SITE VISIT COMPLETE 01/30/75 01/30/75C INPUT TO DES TO PM:
08/29/75 08/29/75C ISSUE DE58 11/07/75 10/29/75C RESPONSE TO COMMENTS ON DE5s ISSUE FES:
05/07/76 04/20/76C CURRENT ENV. STATUS Complete.
SAFETY / NEARING MILESTONE 58 APPLICATION TENDERED:
04/05/74 04/05/74C SAR DOCKETED:
04/29/75 05/05/75C SAR G'S RECEIVED BY PM:
SAR APPL. RESPONSE T0 t'5 RECEIVED 8 CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
Complete.
ISSUE DRAFT SER:
INPUT TO SER:
06/01/77 01/16/78C ISSUE SER 02/21/78 03/01/78C ACRS LETTER RECEIVED:
04/14/78 04/14/74C INPUTS TO SE SUPPLEMENT 6:
12/01/82 ISSUE SE SUPPLEMENT 6 01/01/83 FEMA LETTER RECEIVED:
CUk
'T ANTITRUST complete.
NEARING STARTED:
03/15/77 03/28/77C ASLB INITIAL DECISIOM8 06/08/81 06/08/81C ASLB FINAL DECISION:
03/30/82 03/30/42C TECH SPECS COMPLETED 8 12/01/82 COMMISSION DECISION 8 03/01/83 ISSUE LIC. WITN POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND 04/01/83 No. 69 (October 1, 1982)
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTE 58 CONSTRUCTION COMPLETION - APPL.8 04/01/83 05/20/82
i MRR LICEN5IMG 5Y5 TEM PAGE NO: 2-16 MIDLAND 1 8 2 0L CURREMT 5TATUS REPORT REPORT A5 0F 10/15/82 PLANT CHARACTERI5 TIC 5 KEY PERS0NNEL8
[
DOCKET MO:
833080329 LIC. PM:
R. HERNAM DN00D ASLB CHAIR 8 C. BECMHOEFER 1
APPLICAMTt CONSUMERS POWER LIC. BCs E. ADENSAM MEMBER 1 F. C0WAN I
LOCATIOM8 SW BOUNDARY OF MIDLAND, MICH.
LIC. LA.8 M. DUNCAM MEMBER 28 J. HARBOUR i
REGION:
3 AE8 BECH COUNSELt W. PATON COMST. INSPs R. LANDSMAN REAC. TYPE: PWR M555 88W ANTITRUST 8 B. V0GLER RESID. INSP R. COOK j
DESIGN PWR 2452 MWT/0818 MWE COM5T8 BECH RM ANALYST 8 M. ANDERSON I
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE 1
Utilization of National Laboratories or other i
agencies to complete some review areas is currently ER DOCKETED:
04/01/78 04/14/78C in progress. CP extension was issued 12/28/81. ACR5 ER SITE VISIT COMPLETE:
09/08/78 09/08/78C Full Committee Meeting was held 06/04/82. SSER 81 IMPUT TO DES TO PM:
02/03/82 02/03/82C responding to ACRS letter was issued 6/30/82. 55ER 92 ISSUE DES:
02/05/82 02/05/82C on soils settlement problems was issued 10/06/82.
RESPONSE TO COMMENTS ON DES:
07/08/82 07/08/82C ISSUE FES:
07/30/82 07/30/82C f
CURRENT ENV. STATUS:
02/05/82. The FES was issued on i
}he DEg wag usued APPLICATION TENDERED:
08/31/77 08/31/77C l
SAR DOCKETED 09/30/77 11/18/77C SAR 4'S RECEIVED BY PM8 03/20/78 10/02/78C 1'
SAR APPL. RESPONSE TO 4'S RECEIVED: 12/08/78 12/08/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/01/78 12/01/78C Three prehearinCs ending 04/27-28/81 were held for a ISSUE DRAFT SER:
N/A separate hearing on soils settlement. Hearing on soils INPUT TO SER:
04/23/82 04/23/82C 1
settlement began July 7, 1931 and is continuing.
ISSUE SER:
05/11/82 05/11/82C l
Discovery phase for OL hearing is in progress.
ACR5 LETTER RECEIVED:
06/15/82 06/08/82C IMPUTS TO SE SUPPLEMENT 28 08/16/82 08/16/82C ISSUE SE SUPPLEMENT 2 10/06/82 10/06/82C 3
l FEMA LETTER RECEIVED:
11/01/82 CURRENT AMTITRUST8 Proceeding completed. License was amended 10/20/80.
HEARING STARTED 8 11/08/82 ASLB IMITIAL DECISION:
07/00/83 ASLB FINAL DECISION:
08/00/83 TECH SPECS COMPLETED:
10/25/82 COMMISSION DECISIOMs 08/00/83 ISSUE LIC. WITH POWER RESTRICTION: C7/31/83 LATEST AMEMDMENT:
ISSUE FULL POWER LICENSE AMEND:
.M/S 107 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTE 58 07/31/83 03/31/82 CONSTRUCTION COMPLETION - APPL.:
t i
1
..- ~-
.r..
NRR LICEM5ING SY5 TEM PAGE N08 2-17.
PALD VERDE 1,2,3 OL CURREMT 5TATUS REPORT REPORT AS OF 10/15/82 PLAMT CHARACTERI5 TIC 5:
KEY PERS0NNELa DOCKET NO:
8528-0530 LIC. PM E. LICITRA ASLB CHAIR R. LAZO APPLICANT 8 ARIZOMA PUBLIC SERVICE LIC. BC:
G. KNIGHTON MEMBER 18 R. COLE LOCATION:
36 MI W OF PHOEMIX, AZ LIC. LA.
J. LEE MEMBER 2 D. CALLIHAM i
REGION:
5 AE BECH COUNSEL:
L. DEWEY CONST. IMSP8 L. VBRUEGGEM i
REAC. TYPE: PWR M555: COMB AMTITRUST B. V0GLER RESID. INSP G. FIORELLI DESIGN PWR 3817 MWT/1304 MWE CONST BECH RM ANALYST:
- 5. HEDLUND l
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The safety OL review is in progress. Several " Independent Design Review" meetings have been completed. The SER ER DOCKETED 8 07/01/80 06/20/80C was issued on Movember 11, 1981 The SER supplement ER SITE VISIT COMPLETE:
01/30/81 01/30/81C Mos.
1,2, and 3 were issued on February 5, 1982 and May 17, INPUT TO DES TO PM:
10/05/81 10/05/8tc, 1982, and September 23, 1982 respectively.
ISSUE DES:
10/26/81
'10/26/81C 4
RESPONSE TO COMMENTS ON DES:
02/25/82 02/25/82C ISSUE FES:
03/11/82 03/11/82C CURRENT ENV. STATUS:
The ER (0L) review is complete. A site visit was completed on January 30, 1981.
The DES was issued on SAFETY / HEARING MILESTONES:
October 26, 1981 and the FES was issued on March II, 1982.
APPLICATI0M TEMDERED:
10/05/79 10/05/79C 4
SAR DOCKETED:
06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Five contentions were initially admitted. Two contentions ISSUE DRAFT SER:
were dropped by the intervenor and two others were INPUT TO SER:
10/30/81 10/30/81C summarily disposed of by the Board. The remaining ISSUE SER:
11/11/81 11/11/81C contention deals with water availability. The hearing started April 27-30, 1982, resumed on May 25-28, 1982 ACR$ LETTER RECEIVED:
12/18/81 12/18/81C j
and again on June 22, 1982.
Hearing record was closed IMPUTS TO SE SUPPLEMENT 38 88/02/82 ~
08/02/82C on June 25, 1982.
Findings by all parties have been flied.
ISSUE SE SUPPLEMENT 38 09/23/82 09/23/82C FEMA LETTER RECEIVED *.
M/S i
CURRENT AMTITRUST8 Antitrust OL review is in progress.
HEARING STARTED:
04/27/82 04/27/82C ASLB INITIAL DECISION:
10/30/82 ASLB FINAL DECISION:
11/00/82 TECH SPECS COMPLETED:
08/01/83 COMMISSION DECISION:
07/00/83 ISSUE LIC. WITH POWER RESTRICTION: 08/01/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/20/83 F5AR Amendment No. 9 ER Supplement No. 4 SCHED. DATE RECEIPT DATE NEW SLIP 5/ MOTES:
CONSTRUCTION COMPLETION - APPL.
08/08/83 07/13/82 l
l
a MRR LICEM$IMG SYSTEM PAGE NO 2-18 PERRY 1 & 2 0L CURREMT STATUS REP 0RT REPORT AS OFs 16/15/82 PLANT CHARACTERI$TICSt KEY P E R S 0 N M E La DOCKET NO:
044080441 LIC. PM J. STEFANO ASLB CHAIR:
P. BLOCH i
APPLICANT:
CLEVELAND ELECTRIC ILLUMINATING LIC. BC A. SCHWENCER MEMBER 18 J. KLINE LOCATION:
7 MI ME OF PAINESVILLE, OHIO LIC. LA.:
E. HYLTOM MEMBER 28 F. SHON REGION:
3 AE8 GIL COUNSEL:
B. V0GLER CONST. INSPs P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST J. CUTCHIM RESID. IMSP8 M. GILDMER DESIGN PWR 3759 MWT/1205 MWE CONST8 KAISER RM ANALYST S. HEDLUND CURRENT SAF. STATUS 8 ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.
The ACRS Report was issued on July 16, 1982. SSER No. 1 ER DOCKETED:
06/26/81 06/19/81C was issued on August 9, 1982. SSER Mo. 2 to be issued ER SITE VISIT COMPLETE:
prior to start of ASLB hearings.
INPUT TO DES TO PM:
01/01/82 01/01/82C ISSUE DES:
02/26/82 02/26/82C RESPONSE TO COMMENTS ON DES:
06/30/82 06/30/82C i
ISSUE FES:
88/13/82 08/13/82C l
CURRENT ENV. STATUS:
Environmental acceptance review was completed on June 9,
1981.
The ER was docketed June 19, 1981.
FES SAFETY / HEARING MILESTONES:
issued on August 13, 1982.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
01/09/81 01/30/81C SAR Q'S RECEIVED BY PM8 SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
02/24/82 02/24/82C Board Order dated September 16, 1982, schedules start ISSUE DRAFT SER:
02/26/82 02/26/82C of hearing on February 15, 1983.
IMPUT TO SER:
04/10/82 05/10/82C ISSUE SER:
05/10/82 OS/24/82C ACRS LETTER RECEIVED:
07/16/82 07/16/82C IMPUTS TO SE SUPPLEMENT 28 07/16/82 07/16/82C ISSUE SE SUPPLEMENT 2:
10/31/82 FEMA LETTER RECEIVED:
04/09/83 CURREKT ANTITRUST l
CP antitrust review has been completed. OL antitrust HEARING STARTED:
02/15/83 status is under review.
ASLB INITIAL DECISION 8 08/00/83 ASLB FINAL DECISION:
09/00/83 TECM SPECS COMPLETED:
06/00/83 COMMISSION DECISION:
10/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND 11/08/83 Number 8 (8-25-82).
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES Start of hearing has slipped to February 1983.
CONSTRUCTION COMPLETION - APPL.:
-11/08/83 02/22/82 FEMA letter has slipped to April 1983 due to incomplete offsite plans.
r
NRR LICEN$ING
$YSTEM PAGE N08 2-19 RIVER BEND 1 42 0L CURRENT STATUS REPORT REPORT AS OF8 10/15/82 PLANT CHARACTER 1STIC5:
KEY PERS0NNEL8 DOCKET NO:
045830459 LIC. PM
. UNASSIGNED ASLB CHAIR 8 B. COTTER APPLICANT:
GULF STATES UTILITIES LIC. BC:
A. SCHWENCER MEMBER 18 F. REMICK LOCATION:
24 MI NNW OF BATON ROUGE, LA LIC. LA.:
E. HYLTON MEMBER 28 R. COLE REGION:
4 AE
$1W COUNSEL:
L. DEWEY CONST. INSPs. UNASSIGNED REAC. TYPE: BWR NSS$8 GE ANTITRUST:
B. V0GLER RESID. INSPs R. BROWN DESIGN PWRt 3015 MWT/0934 MWE CONST: 58W RM ANALYST 8 M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES 8 SCHED. DATE ACTUAL DATE AppIlcant tendered FSAR for docketing on 04/24/81.
FSAR was docketed on 08/25/81. Draft SER targeted for ER DOCKETED:
08/25/81 08/25/81C 03/83.
ER SITE VISIT COMPLETE:
01/22/82 01/22/82C INPUT TO DES TO PM 12/09/83 ISSUE DES
- 01/09/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
06/08/84 CURRENT ENV. STATUS:
Applicant tendered ER for docketing on 04/24/81.
ER was docketed on 08/25/81. DES targeted for 01/09/84.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/24/81 04/24/81C SAR DOCKETED:
08/25/81 08/25/81C SAR Q'S RECEIVED BY PM 12/07/81 12/15/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/82 CURRENT HRG. STATUS 8 INPUT TO DRAFT SER TO PM:
03/04/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
03/00/83 Federal Register on 09/04/81. Prehearing conference INPUT TO SER:
1t/04/83 scheduled for 02/08/83.
ISSUE SER:
12/02/83 ACRS FULL COMMITTEE MEETINGS 01/13/84 INPUTS TO SE SUPPLEMENT 18 04/00/84 ISSUE SE SUPPLEMENT 18 05/00/84 FEMA LETTER RECEIVED:
05/01/84 CURRENT ANTITRUST Status to be determined.
NEARING STARTED:
10/08/84 ASLB INITIAL DECISION 8 03/00/85 ASLB FINAL DECISION:
04/00/85 TECH SPECS COMPLETED 10/00/84 COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 Number 5.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
NRR/0L revised the priority of the review on this case due CONSTRUCTION COMPLETION - APPL.8 04/08/85 04/15/82 to 18-month slip in construction schedule.
NRR LICEN$ING SYS1EM PAGE NO: 2-20 SAN ONOFRE 3 0L CURRENT STATUS REP 0RT REPORT AS OF 10/15/82 PLANT CHARACTERISTICS KEY P E R S O N N E L:
DOCKET NO:
65000362 LIC. PM:
H. ROOD ASLB CHAIR:
J. KELLEY APPLICANT:
SOUTHERN CALIFORNIA EDISDN LIC. BC:
G. KNIGHTON MEMBER 1:
C. HAND LOCATION:
5 MI 5 0F SAM CLEMENTE, CA LIC. LA.:
MEMBER 2 E. JOHNSON REGIDH 5
AE BECH COUNSEL:
L. CHANDLER CONST. INSP D. KIRSCM REAC. TYPE: PWR NSSS: COM8 ANTITRUST:
J. GOLDBERG RESID. INSP A. CNAFFEE DESIGN PWR 3410 MWT/1100 MWE CONST: BECH RM ANALYST M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER on geological and seismological matters was issued on 12/31/80. ACRS subcommittee meetings were held 01/30/81 and ER DOCKETED:
03/01/77 03/23/77C 03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETE:
05/20/77 05/20/77C 03/12/81 SER (Hon-TMI matters), was issued on 02/06/81 INPUT TO DES TO PM:
10/01/77 12/01/80C SER supplement on TMI issues was issued on 02/25/81 SER ISSUE DES:
01/27/78 01/20/81C supplement No. 2, 3, 4, 5, and 6 addressing open items were RESPONSE TO COMMENTS ON DES:
Issued 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.
ISSUE FES:
04/00/81 04/29/81C ASLB PID was rendered on 01/11/82. Supplement No. 8 is scheduled for 11/15/82.
CURRENT ENV. STATUS:
DES addressing class 9 accidents was issued 01-20-81, FES was issued 04-29 81 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/29/76C SAR DOCKETED:
03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:
08/15/77 09/29/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
02/10/78 08/11/78C Motions for summary disposition were granted by ASLB.
ISSUE DRAFT SER:
01/15/81 01/15/81C Hearing started 06/22/81 and ended 09/31/81.
INPUT TO SER:
06/23/78 01/15/81C ISSUE SER:
08/01/80 02/06/81C ACRS LETTER RECEIVED:
03/17/81 03/17/81C INPUTS TO SE SUPPLEMENT 8:
11/00/82 ISSUE SE SUPPLEMENT 8 11/15/82 FEMA LETTER RECEIVED:
12/01/81 12/01/81C CURRENT ANTITRUST The Staff is reviewing the OL antitrust information.
HEARING STARTED:
06/22/81 06/22/81C ASLB INITIAL DECISION:
05/14/82 05/14/82C ASLB FINAL DECISION:
02/01/83 TECH SPECS COMPLETED:
11/15/82 COMMISSION DECISION:
02/15/83 ISSUE LIC. WITH POWER RESTRICTION: 11/15/82 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
03/01/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.
11/15/82 09/27/82 l
HRR LICEN5ING SYSTEM PAGE NO: 2-21 SEABROOK 182 0L CURRENT 5TATUS REPQRT REPORT AS OF 10/15/82 PLANT CHARACTERI$TICSt KEY PERS0NNEL DOCKET NO:
044380444 LIC. PM:
L. WHEELER ASLB CHAIR:
H. H0YT APPLICANT:
PUBLIC SERVICE OF NEW HAMPSHIRE LIC. BC:
G. KNIGHTON MEMBER la E. LUEBKE LOCATION:
10 MI S OF PORTSMOUTH, NH LIC. LA.:
J.
LEE MEMBER 23 J. HARBOUR REGION:
1 AE:
UEC COUNSEL:
R. LESSY CONST. INSP A.
TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP A. CERNE DESIGN FWR 3411 MWT/1198 MWE CONST: UEC RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in September 1981.
The FSAR was docketed October 5, 1981.
Appilcant has ER DOCKETED:
10/05/81 10/05/81C responded to round 1 9's.
SER issuance has moved from ER SITE VISIT COMPLETE:
12/02/81 12/02/81C 11/08/82 to 01/12/83. Partial draft SER has been issued INPUT TO DES TO PM:
03/01/82 03/01/82C ISSUE DES:
05/14/82 05/14/82C RESPONSE TO COMMENTS ON DES:
08/18/82 09/15/82C ISSUE FES:
12/08/82 CURRENT ENV. STATUS:
ER was tendered June 1981.* ER acceptance review was completed September 1981 The ER was docketed SAFETY / HEARING MILESTONES:
October 5, 1981.
DES was issued May, 1982.
Comments are being evaluated. FES pubitcation has been moved from APFLICATION TENDERED 06/29/81 06/29/8tC 10/05/82 to 12/08/82.
SAR DOCKETED:
10/05/81 10/05/81C SAR Q'S RECEIVED BY PM:
01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/07/82 10/08/82C Notice for Opportunity for Hearing was pubit ched in ISSUE DRAF) SER:
07/30/82 08/t3/82C the Federal Register on October 19, 1981 First prehearing INPUT TO SER:
11/30/82 conference was held May 6-7, 1982.
Second prehearing ISSUE SER:
01/12/83 conference was held July 15-16, 1982. ASLB Order identifying parties, contentions and prehearing schedule ACRS FULL COMMITTEE MEETING:
02/10/83 was issued September 13, 1982.
INPUTS TO SE SUPPLEMENT 18 02/10/83 ISSUE SE SUPPLEMENT 18 03/07/83 FEMA LETTER RECEIVED:
12/20/82 CURRENT ANTITRUST Status to be determined.
HEARING STARTED:
08/00/83 ASLB INITIAL DECISION:
06/00/84 ASLB FINAL DECISION:
07/00/84 TECH SPECS COMPLETED:
COMMISSION DECISION:
07/00/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/00/84 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Large number of open items in safety review may cause CONSTRUCTION COMPLETION - APPL.
05/31/84 06/23/82 a two-month slip to the schedule.
HRR LICEN$ING SY$ TEM PAGE NO: 2-22 SHOREHAM 0L CURRENT
$TATUS REPORT REPORT AS OF8 10/15/42 PLANT CHARACTERISTIC 5:
KEY P E R S 0 N N E La DOCKET NO:
05000322 LIC, PM R. GILBERT ASLB CHAIR:
L. BRENNER APPLICANT:
LONG ISLAND LIGHTING CO.
LIC. BC:
A. SCHWENCER MEMBER 1 P. MORRIS LOCATION:
BROOKHAVEN, NY (LI)
LIC. LA.:
E. NYLTON MEMBER 2 J. CARPENTER REGION:
1 AE
$8W COUNSEL:
B. BORDENICK CONST. INSP L. MARROW REAC. TYPE: BWR NSSS: GE ANTITRUST J. RUTBERG RESID. INSP: J. HIGGINS DESIGN PWR 2436 MWT/0854 MWE CONST: 58W RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981.
SER Supplement 2 was issued in March 1982.
An additional ER DOCKETED 01/26/76 01/26/76C SER Supplement is scheduled for Nov. 1982 or earlier ER SITE VISIT COMPLETE:
08/06/76 08/03/76C to address resolution of outstanding matters.
IMPUT TO DES TO PM:
11/22/76 11/29/76C ISSUE DES:
03/11/77 03/24/77C RESPONSE TO COMMENTS ON DES:
07/22/77 07/22/77C ISSUE FES' 10/21/77 10/18/77C CURRENT ENV. STATUS:
The environmental review is complete.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
09/00/75 09/04/75C SAR DOCKETED:
12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:
06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
07/15/77 08/01/77C Hearing sessions were held on September 14-17 & 21-24, ISSUE DRAFT SER:
1982.
After a brief recess, hearings will resume on INPUT TO SER:
03/10/81 03/10/81C October 12, 1982.
ISSUE SER:
04/10/81 04/10/81C ACRS LETTER RECEIVED:
09/18/81 10/19/81C IMPUTS TO SE SUPPLEMENT 3:
N/S ISSUE SE SUPPLEMENT 38 11/15/82 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Not' required.
HEARING STARTED:
05/04/82 05/04/82C ASLB INITIAL DECISION:
05/00/83 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMt1ISSION DECISION:
06/00/83 ISSUE LIC. WITH POWER RESTRICTION: 03/30/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/00/83 FSAR Amendment 26 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
The current estimate for a partial initial ASLB decision CONSTRUCTION COMPLETIDH - APPL.:
03/00/83 04/30/82 on all matters except offsite emergency planning is the end of March, 1983.
A complete initial decision may not be available prior to Mav. 1983.
1
NRR LICEN5ING SYSTEN PAGE NO: 2-23 SOUTH TEXAS 1 82 0L CURRENT STATUS REPORT REPORT AS OFs 10/15/82 PLANT CHARACTERISTIC 58 KEY P E R S 0 N N E La DOCKET NO:
049880499 LIC. PM:
D. SELLS ASLB CHAIR C. BECHNOEFER APPLICANT:
NOUSTON LIGHTING 8 POWER COMPANY LIC. BCs G. KNIGHTON MEM8ER 18 J.-LAMB LOCATION:
12 MI SSW OF BAY CITY, TEX LIC. LA.:
J. LEE MEMBER 2 E. NILL REGIDH 4
AE BECH COUNSEL:
J. GUTIERREZ CONST. INSPs REAC. TYPE: PWR NSS$8 WEST ANTITRUST B. V0GLER RESID. INSP8 W. NILL DESIGN PWRs 3800 MWT/1250 MWE CONST EBASCO RM ANALYST L.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES 8 SCHED. DATE ACTUAL DATE l
Limited work being performed due to higher priorities.
BRRT has been replaced by Bechtel as the A/E.
BRRT ER DOCKETED:
07/17/78C has been replaced by Ebasco as the constructor.
ER SITE VISIT COMPLETE:
09/26/78 09/26/78C l
Hon safety related construction restarted on June 15, 1982.
INPUT TO DES TO PM:
08/00/85 Safety related construction restarted on August 15, 1982.
ISSUE DES:
09/00/85 Current FLD is 12/86. Milestones now reflect a 12/86 FLD.
RESPONSE TO COMMENTS ON DES
- 01/00/86 ISSUE FES:
02/00/86 CURRENT ENV. STATUS:
Schedule revised to reflect new 12/86 FLD.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
05/10/78 05/10/78C SAR DOCKETED:
07/17/78C SAR Q'S RECEIVED BY PM:
01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N 'S CURREtiT NRG. STATU$s INPUT TO DRAFT SER TO PM:
03/00/85 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:
03/00/85 expedited hearing on QA programs and management was INPUT TO SER:
11/00/85 held.
The record of this phase of the hearing ISSUE SER8 12/00/85 was closed on June 17, 1982, Phase II of hearing will consider all aspects of Quadrex Report.
ACRS FULL COMMITTEE MEETING:
01/09/86 Phase II is expected to begin in late '82 or early '83.
INPUTS TO SE SUPPLEMENT 1 01/00/86 ISSUE SE SUPPLEMENT 18 01/00/86 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Memo and Order issued May 6, 1982 approving settlements and NEARING STARTED:
06/00/86 proposed license conditions and dismissing proceeding.
ASLB INITIAL DECISION:
11/00/86 ASLB FINAL DECISION:
12/00/86 TECH SPECS COMPLETED
'01/00/86 COMMIS$IDH DECISION:
12/00/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND 8 12/00/86 FSAR amendment 025 was issued 03/15/82.
ER amendment 05 was issued 08/31/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
All schedules now reflect new official FLD of 12/86.
CONSTRUCTION COMPLETION - APPL.
12/00/86 03/08/82 I
i NRR LICEN5ING SY5 TEM PAGE NO 2-24' ST LUCIE'2 0L CURRENT 5TATU5 REPORT REPORT A5 0F8 10/15/82 PLAMT CHARACTERISTICS:
KEY P E R 5 0 M M E tt DOCKET N08 05000389 LIC. PM:
V. MERSES ASLB CMAIR E. 80WERS APPLICANT:
FLORIDA POWER 8 LIGHT LIC. BC:
G. KNIGHTOM MEMBER 18.
P. MORRIS LOCATION:
12 MI SE OF FT. PIERCE, FLA LIC. LA.:
J. LEE MEMBER 28
- 0. PARIS REGION:
2 AE2 EBASCO COUNSEL:
W. PATTON CONST. INSPs R. WRIGHT ortc. TYPE 8 PWR M555: COMB ANTITRUST:
B. V0GLER RESID. IMSPt 5. ELROD DESIGN PWRs 2700 MWT/C842 MWE CONST8 E5ASCO RM ANALYST:
M. AMDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTOMES:
SCHED. DATE ACTUAL DATE Status of 4-1 and 4-2 review is complete. The SER was i
issued on 10/09/81. SE Supplement No. 1 was i ssued -
ER DOCKETED:
02/17/81C cn 12/30/81 SE Supplement No. 2 was issued on 09/30/82.
ER SITE YISIT COMPLETE:
02/18/81 02/18/81C INPUT TO DES TO PM8 08/07/81 08/07/81C ISSUE DES:
10/16/81 l10/16/81C:
RESPONSE TO CDMMENT5 ON DES:
02/08/82 02/08/82C ISSUE FE58 04/23/82
.04/23/82C CURRENT ENV. STATUS:
The DES was issued on 10/16/81 and the FR Motice was published 10/30/81 The FES was issued on 04/23/82.
SAFETY / HEARING MILESTOME58 APPLICATION TENDERED:
03/31/80 03/31/80C-SAR DOCKETED 02/17/81C l
I SAR Q'S RECEIVED BY PM 06/15/81 06/15/81C SAR APPL. RESPONSE TO 4'S RECEIVED:
CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM 08/03/81 08/03/81C There have been no petitioners on matters dealing with ISSUE DRAFT SER8 08/10/81 08/10/81C health, safety and environment.
IMPUT TO SER:
09/11/81 09/11/81C ISSUE SER:
10/09/81 10/09/81C j
ACR$ FULL COMMITTEE MEETING
- 11/12/81 11/12/81C IMPUT5 TO SE SUPPLEMENT 2 08/20/82 08/20/82C ISSUE SE SUPPLEMENT 28 09/30/82 09/30/82C FEMA LETTER RECEIVED:
08/20/82 08/20/82C CURRENT AMTITRUST Settlement : song the Department of Justice, the MRC Staff HEARING STARTED -
N/A and the licensee has been agreed upon.
Case di smissed ASLB IMITIAL DECISION:
N/A 3/82 following summary disposition and settlement agreement.
ASLB FINAL DECISION 8-N/A TECH SPECS COMPLETED 10/30/82 COMMISSION DECISION:
01/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT 8 ISSUE FULL POWER LICENSE AMEMD 12/17/82 Mo. 12 (F5AR); Mo. 5 (ER)
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTE 58 Caseload Forecast Panel estimates 08/83 core load date.
COMSTRUCTION COMPLETION - APPL.*
01/00/83 Appilcant, in meeting with MRC on 09/30/82, estimates 01/83 core load date.
NRR LICEN5ING SYSTEM PAGE NO: 2-25 SUNMER 1 LIC CURRENT 5TATUS REP 0RT REPORT A5 0F 10/15/82 PLANT CHARACTERI5 TIC 5 KEY P E R S 0 N N E La DOCKET MO:
05000395 LIC. PM:
W. KANE ASLB CHAIR:
H. GROSSMAN APPLICANT:
SOUTH CAROLINA ELECTRIC 8 GAS CO.
LIC. BC:
B. YOUNGBLOOD MEMBER 1 G. LINENBERGER LOCATION:
26 MI NW OF COLUMBIA, SC LIC. LA.:
M. RUSHBROOK MEMBER 28 F. HOOPER REGION:
2 AE GIL COUNSEL:
S. GOLDBERG CONST. INSP REAC. TYPE: PWR MSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP J. SK0LDS DESIGN PWR 2785 MWT/0900 MWE CONST8 DANIEL RM ANALYST S. HEDLUND CURREti! SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER Supplement No. 1 was issued 04/28/81. Supplement No. 2 to tha SER was issued on 05/28/81. Supplement No.
ER DOCKETED:
01/21/77 02/24/77C 3 was issued in January 1982.
Supplement No. 4 was ER SITE VISIT COMPLETE:
06/30/78 06/07/78C issued on A:squst 6, 1922.
An operating license with INPUT TO DES TO PM 09/21/78 05/29/79C a 5% power restriction was issued on August 6, 1982.
ISSUE DES:
10/30/78 06/22/79C Two amendments have been issued, each involving changes RESPONSE TO COMMENTS ON DES:
07/01/80 07/24/80C l
to the Technical Specifications.
ISSUE FES:
05/15/81 05/21/81C i
CURRENT EhV. STATUS:
DES supplement on Class 9 accidents was issued in November 1980.
The FES was issued in May, 1981 SAFETY / HEARING MILESTONES:
l APPLICATION TENDERED:
12/10/76 12/10/75C SAR DOCKETED:
01/21/77 02/24/77C SAR Q'S RECEIVED BY PM 02/03/78 03/08/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/21/78 0 9/18/78C CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
06/16/78 02/21/79C The contested hearing began 06/81 and was completed in ISSUE DRAFT SER:
N/A 01/82. PID on seismic issues was issued on 07/20/82. The INPUT TO SER:
06/02/80 12/15/80C remainder of the decision was issued on 08/04/82. The ISSUE SER:
08/01/80 02/06/81C intervenor requested the ASLB to stay its decision because of cadweld allegations. The ASL3 denied this request ACRS LETTER RECEIVED:
03/18/81 03/18/81C after reviewing affidavits from the staff and licensee.
INPUTS TO SE SUPPLEMENT 4 07/14/82 07/14/82C The ASLF gave the intervenor until 10/18/82 to respond to ISSUE SE SUPPLEMENT 4:
07/16/82 08/06/82C the affidavits before deciding whether to open the hearing.
FEMA LETTER RECEIVED:
11/13/81 11/13/81C CURkENT ANTITRUSTr The Attornoy General sent his advice on significant HEARING STARTED:
06/22/81 06/22/81C changes to the Comsission on 10/10/80. The Commission ASLB INITIAL DECISION:
07/00/82 08/04/82C en 06/26/81 denied Central Electric Power Coop., Inc.
ASLB FINAL DECISION:
10/00/82 petition for antitrust review.
TECH SPECS COMPLETED:
07/00/82 08/06/82C COMMISSION DECISION:
10/00'82 ISSUE LIC. WITH POWER RESTRICTION: 07/PJ/82 08/06/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/10/82 Humber 33.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/10/82C
NRR LICENSING SY$ TEM PAGE NO: 2-26
$USQUEHANNA i82 LIC CURRENT STATUS REP 0RT REPORT AS OF 10/15/82 PLANT CHARACTERI5 TIC 5:
KEY PERS0NNEL DOCKET NO:
038780388 LIC, PM:
R. PERCH ASLB CHAIR:
J. GLEASON APPLICANT:
PENMSYLVANIA POWER & LIGHT LIC. BC A. SCHWENCER MEMBER 1:
G. BRIGHT LOCATION:
7 MI ME OF BERWICK, PA LIC. LA.:
E. HYLTON MEMBER 2 P. PURDOM REGION:
1 AE BECH COUNSEL:
J. CUTCHIM CONST. INSP L. MARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:
A. HODGDON RESID. INSP G. RHOADS DESIGN PWR 3440 MWT/1052 MWE CONST BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued 04/06/81 SSER Of was issued 07/07/81 Post ACRS SSER 82 was issued 09/10/81. SSER 03 was ER DOCKETED:
06/10/78C issued 07/17/82. Full power Ilconse with a fuel load ER SITE VISIT COMPLETE:
10/20/78 10/20/78C and low power testing restriction was issued on 07/17/82.
IRPUT TO DES TO PM 03/30/81 03/30/81C ISSUE DES:
03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:
05/21/81 05/21/81C ISSUE FES 06/15/81 07/02/81C CURRENT ENV. STATUS:
DES was issued on 03-30-81.
FES was issued 07-02-81.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/05/78 04/10/78C SAR DOCKETED:
07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:
11/17/78 05/15/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/07/80 04/07/80C The OL hearing is completes Initial Decision issued on ISSUE DRAFT SER:
04-12-82.
INPUT TO SER:
03/23/81 03/23/81C ISSUE SER:
04/06/81 04/06/81C ACR$ LETTER RECEIVED:
08/15/81C INPUTS TO SE SUPPLEMENT 3 07/16/82 07/16/82C ISSUE SE SUPPLEMENT 38 07/00/82 07/17/82C FEMA LETTER RECEIVED:
06/00/82 06/00/82C CURRENT ANTITRUST:
Complete.
HEARING STARTED:
10/06/81 10/06/81C ASLB INITIAL DECISION 04/12/82 04/12/82C ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISIDH 10/30/82 ISSUE LIC. WITH POWER RESTRICTION: 07/01/82 07/17/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/30/82 FSAR:
No. 30s ER:
No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.
07/17/82C 05/11/82
I NRR LICEN5ING SY$ TEM PAGE NO: 2-27 WASHINGTON NUCLEAR 1 0L CURRENT 5TATU$
REPORT REPORT AS oft 10/15/82 PLANT CHARACTERI$ TIC $8 KEY P E R S 0 N N E L8 DOCKET N08 0S000460 LIC. PM:
. UNASSIGNED ASLB CHAIR 8 I. SMITH APPLICANT
- WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
E. ADENSAM MEMBER 18 G. BRIGHT LOCATION:
10 MI N OF RICHLAND, WA LIC. LA.
M. DUNCAN MEMBER 28 J. HARBOUR REGION:
5 AE2 UEC COUNSEL:
M. YOUNG CONST. INSPs P. MARBUT REAC. TYPE: PWR HSSS8 B&W ANTITRUST:
RESID. INSP A. TOTH DESIGN PWR 3760 MWT/1266 MWE CONST BECH RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTCHES8 SCHED. DATE ACTUAL DATE Appilcation was tendered on 11-25-81 This schedule is being reconsidered in light of a notice of deferral from ER DOCKETED:
87/08/82 87/16/82C the appilcant. A review schedule will be established ER SITE VISIT COMPLETE 8 following construction resumption. Application was INPUT TO DES TD PM:
docketed on July 16, 1982.
ISSUE DES:
N/S RESPONSE TO COMMENTS ON DES:
ISSUE FES N/S CURRENT ENV. STATUS:
DES issuance will be scheduled following resumption of construction.
SAFETY / NEARING MILESTONES 8 APPLICATION TENDERED:
11/25/81 11/25/81C SAR DOCKETED:
07/00/82 07/16/82C SAR Q'S RECEIVED BY PM SAR APPL. RESPONSE TO q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM8 Notice of Opportunity for Hearing was pubilshed ISSUE DRAFT SER in the Federal Register on August 16, 1982.
INPUT TO SER*
ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING 8 N/S INPUTS TO SE SUPPLEMENT 1*
ISSUE SE SUPPLEMENT 13 N/S FEMA LETTER RECEIVED:
CURRENT ANTITRUST
- HEARING STARTED:
N/S ASLB INITIAL DECISION:
N/S ASLB FINAL DECISION -
TECH SPECS COMPLETED:
COMMISSION DECISION:
ISSUE LIC. WITH POWER RESTRICTION 8 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND 8 N/S Hone SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.*
N/S 95/07/82 on 4/29/82.
1 b
l MRR L I C E M.5 I N G SY5 TEM PAGE NO: 2-28' WASHINGTON, ML' CLEAR 2 0L CURRENT 5TATU5 R E P O_R T REPORT A5 0F 10/15/42 P L'A N T CHARACTERI5 TIC 5 KEY P E R S 0 N N E Lt DOCKET MO:
05000397 LIC. PM:
R. AULUCK ASLB CHAIR E. BOWERS i
APPLICANT WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC A. SCHWENCER MEMBER 18-R. COLE LOCATION:
30 MI NW OF RICHLAND, WASH LIC. LA.*
E. HYLTON MEMBER 2:
E. HILL'-
REGION:
5 AEs B8R COUNSEL W. PATON CONST. INSPs A. TOTH REAC. TYPE 8 BWR NSS$8 GE ANTITRUST 8
- 5. V0GLER RESID. INSP8 R. FEIL DESIGN PWRt 3323 MWT/1103 MWE CONST8 BECH RM ANALYST L. LAMIER CURRENT SAF. STATUS ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued 3/31/82. Geology /Sei smology reviews were Included in SSER Mo. 1 issued August 11, 1982. ACRS ER DOCKETED 02/28/77 04/20/77C' meeting was held on October 7, 1982.
ER SITE VISIT COMPLETE 07/13/77 07/14/77C INPUT TO DES TO PM:
06/30/81
.06/30/81C ISSUE DES:
07/31/81 07/31/81C RESPCHSE TO COMMENTS ON DES:
09/28/81 09/28/8tc ISSUE FE58-12/31/81 12/31/81C
?
i CURRENT ENV. STATUS:
i FES was issued 12-31-81 SAFETY / HEARING MILESTONE 58 t.
APPLICATION TENDERED:
12/30/76 12/30/76C i
SAR DOCKETED 8 84/01/78 86/22/7PC.
4 SAR Q'S RECEIVED BY PM:
01/05/79 03/07/79C SAR APPL. RESPONSE T0 t's RECEIVED: 05/11/79 07/26/79C j
CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
10/12/81 18/12/81C Not required ISSUE DRAFT SER:
11/17/81 11/17/81C 4
IMPUT TO SER:
05/30/82 05/30/12C
-[
ISSUE SER:
.03/31/82 03/31/82C ACRS LETTER RECEIVED:
11/08/82 INPUTS TO SE SUPPLEMENT 2 11/00/82 ISSUE SE SUPPLEMENT 2:
11/22/82 FEMA LETTER RECEIVED:
05/01/83
?
CURRENT ANTITRUST HEARING STARTED:
N/A 4
Not required ASLB INITIAL DECISIONI M/A i
ASLB FINAL DECISION:.
M/A TECH SPECS COMPLETED 07/06/S3.
COMMISSIGH DECISION:
08/00/83 4
ISSUE LIC. WITH POWER RESTRICTION 8 ISSUE FULL POWER LICENSE AMEND 8 09/06/83 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
09/08/83 05/07/82 COMSTRUCTION COMPLETION - APPL.:
I i
=
NRR LICEN5ING SYSTEM PAGE NO: 2-29 WASHINGTON NUCLEAR 3 0L CURRENT STATUS REP 0RT REPCRT AS OF 10/15/82 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E La DOCKET NO:
05000508 LIC. PM:
L. WHEELER ASLB CHAIR:
R. LAZO APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
G. KNIGHTON MEMBER 1 E. LUEBKE LOCATION:
26 MI W OF OLYMPIA, WA LIC. LA.:
J. LEE MEMBER 2:
D. SCHINK REGION:
5 AE:
EBASCO COUNSEL:
D. SWANSON CONST. INSP D. KIRSCH REAC. TYPE: PWR HSSS: COMB ANTITRUST:
B. V0GLER RESID. 1HSP W. ALBERT DESIGN PWR 3800 MWT/1242 MWE CONST EBASCO RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Appilcation was tendered on June 2, 1982, and was docketed on 08/27/82.
ER DOCKETED:
08/27/82 08/27/82C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM ISSUE DES:
09/07/83 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
04/06/84 CURRENT ENV. STATUS:
Application was tendered on June 2, 1982, and was do,cketed on 08/27/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/02/82 06/32/82C SAR DOCKETED:
08/27/82 08/27/82C SAR Q'S RECEIVED BY PM:
04/05/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 07/13/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/28/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
12/01/83 Federal Register on 09/15/82.
INPUT TO SER:
06/05/84 ISSUE SER:
08/09/84 ACRS FULL COMMITTEE MEETING:
09/03/84 INPUTS TO SE SUPPLEMENT 1:
11/06/84 ISSUE SE SUPPLEMENT 1 12/13/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST Notice of Opportunity for hearing is to be published in HEARING STARTED:
05/00/85 the Federal register on October 15, 1982.
ASLB INITIAL DECISION:
11/00/86 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISI0H:
12/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Schedule will be completed after management approval.
CONSTRUCTION COMPLETION - APPL.:
12/00/85 10/01/82 Caseload Forecast Panel visited site 8/31/82-9/2/82.
Detailed review schedule is now being developed.
NRR LICEN5ING SY$ TEM PAGE NO: 2-30 WATERFORD 3 0L CURRENT STATUS REPQRT REPORT AS CF 10/15/82 PLANT C H A R A C T E R I S T I C 5:
KEY P E R S 0 N N E La DOCKET NO:
05000382 LIC. PM:
S. BLACK ASLB CHAIR S. WOLFE APPLICANT:
LOUISIANA POWER 8 LIGHT LIC. BC:
G. KNIGHTON MEMBER 1 W. JORDAN LOCATION:
20 MI W OF NEW ORLEANS, LA LIC. LA.:
J. LEE MEMBER 2:
H. FOREMAN REGION:
4 AE:
EBASCO COUNSEL:
S. TURK CONST. INSP
. UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP: L. CONSTABLE DESIGN PWR 3560 MWT/1151 MWE CONST: EBASCO RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The safety review was expedited. The SER was issued July 9, 1981 Fuel load date delayed until 05/83 by ER DOCKETED:
12/00/78 12/09/78C applicant.
ER SITE VISIT COMPLETE:
12/05/80 12/05/80C INPUT TO DES TO PM:
04/06/81 04/06/81C ISSUE DES:
05/01/81 05/01/8tC RESPONSE TO COMMENTS ON DES:
07/24/81 08/19/81C ISSUE FES:
09/30/81 09/30/81C CURRENT ENV. STATUS:
The DES was completed in May 1981 FES was completed September 1981 SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
09/28/78 09/28/78C SAR DOCKETED:
12/18/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM 10/03/80 05/15/81C Contested hearing started 03/82.
Discovery among the ISSUE DRAFT SER:
parties has been held.
Hearing record closed 5/12/82.
INPUT TO SER:
05/08/81 05/15/81C ISSUE SER:
07/09/81 07/09/81C ACRS LETTER RECEIVED:
08/08/81 08/08/81C INPUTS TO SE SUPPLEMENT 48 09/15/82C ISSUE SE SUPPLEMENT 4 10/2h,2 FEMA LETTER RECEIVED:
11/30/82 CURRENT ANTITRUST:
Staff is reviewing OL Antitrust information.
HEARING STARTED:
03/00/82 03/23/82C ASLB INITIAL DECISION:
10/00/82 ASLB FINAL DECISION:
11/00/82 TECH SPECS COMPLETED:
02/28/83 COMMISSION DECISION:
04/30/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/00/83 ER 83 - 8/81 FSAR 828 - 7/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:
05/00/83 08/24/82 cmerqcncy plan.
On 08/24/82, LPEL advised FLD slip to 05/83 and commercial operation slip to 01/84.
NRR LICEN$ING
$Y$ TEM PAGE NO: 2-31 WATTS BAR 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF8 10/15/42 PLANT C H A R A C T E R I S T I C 5:
KEY P E R S 0 N N E L8 DOCKET NO:
039030391 LIC. PM:
T. KEMYON ASLB CHAIR 8 N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 18 M/A LOCATION:
10 MI S OF SPRING CITY, TENN LIC. LA.*
M. DUNCAN MEMBER 22 N/A REGION:
2 AE:
TVA COUNSEL:
M. YOUNG CONST. INSP8 R. CRLENJAK REAC. TYPE: PWR NS$$8 WEST ANTITRUST J. RUTBERG RESID. INSPs T. HEATHERLY DESICN PWR*
3411 MWT/1165 MWE CONSTt TVA RM ANALYST
- M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion date at 08/83.
SER published 07/82.
ACRS subcommittee meetings held ER DOCKETED:
01/05/77 11/23/76C 04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE:
03/18/77 02/25/77C held 08/13/82. ACRS letter received 08/16/82. Supplement INPUT TO DES TO PM:
07/06/77 08/18/77C 01 to SER published 09/22/82.
ISSUE DES:
11/29/77 06/02/18C RESPONSE TO COMMENTS ON DES:
N/A ISSUE FES:
11/24/78 12/29/78C CURRENT ENV. STATUS:
Complete except for environmental tech specs.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/30/76 06/30/76C SAR DOCKETED:
10/04/76 10/04/76C SAR Q'S RECEIVED BY PM 12/15/76 05/20/77C SAR APPL. RESPONSE TO 4'S RECEIVED: 03/23/77 02/10/78C CURRENT HRG. STATU$s INPUT TO DRAFT SER TO PM:
06/18/80 12/18/8tc No hearings are assumed.
ISSUE DRAFT SER:
12/30/81 12/30/8tc INPUT TO SER:
C6/04/82 06/04/82C ISSUE SER:
07/01/82 07/01/82C ACRS LETTER RECEIVED:
09/08/82 08/16/82C INPUTS TO SE SUPPLEMENT 18 08/27/82 09/03/82C ISSUE SE SUPPLEMENT 18 09/97/82 09/22/82C-FEMA LETTER RECEIVED 8 04/08/83 CURRENT ANTITRUST Complete HEARING STARTED N/A ASL8 INITIAL DECISION 8 N/A ASLB FINAL DECISIOMs N/A TECH SPECS COMPLETED:
11/08/82 COMMISSIDM DECISION 07/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/08/83 FSAR Ho. 46 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
CONSTRUCTION COMPLETION - APPL.8 G8/08/83 04/09/82
NRR LICEN$ING SY5 TEM PAGE NO: 2-32 l
WOLF CREEK t 0L CURRENT 5TATU5 REPORT REPORT A5 0F 10/15/42 PLANT CHARACTERI5 TIC 5:
KEY P E R 5 0 N N E La DOCKET NO:
65000482 LIC, PM:
J. HOPKINS ASLB CHAIR J. GLEASON APPLICANT:
KANSAS GAS 8 ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G. ANDERSON LOCATIDM 3.5 MI NE OF BURLINGTON. KAN LIC. LA.:
M. RUSHBROOK MEMBER 2:
H. PAXTON REGIDH 4
AE BECH COUNSEL:
M. KARMAN CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP T. VANDEL DESIGN PWR 3425 MWT/1150 MWE CONST DANIEL RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued in AprlI 1982. 55ER-1 was issued in August 1982.
ER DOCKETED:
11/25/80 11/25/80C ER SITE VISIT COMPLETE:
07/28/81 04/21/81C INPUT TO DES TO PM:
10/01/81 10/01/81C ISSUE DES:
01/05/32 01/05/82C RESPONSE TO COMMENTS ON DES:
05/14/82 05/14/82C ISSUE FES:
06/11/82 06/tt/82C CURRENT ENV. STATUS:
The DES was issued in January 1982.
The FES was issued
.in Juns 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/21/80 02/21/80C SAR DOCKETED:
08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/12/82 03/12/82C Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
Federal Register on 12/18/80. Two petitions for INPUT TO SER:
03/19/82 03/19/82C leave to intervene were filed. A special coebined ISSUE SER:
04/07/82 04/07/82C prehearing conference was held on 4/15/81.
ACRS LETTER RECEIVED:
05/11/82 05/11/82C INPUTS TO SE SUPPLEMENT 18 08/10/82 08/10/82C ISSUE SE SUPPLEMENT 18 08/26/82 08/26/82C FEMA LETTER RECEIVED:
04/01/83 CURRENT ANTITRUST:
OL antitrust review is in progress.
HEARING STARTED:
06/08/83 ASLB INITIAL DECISION:
11/00/83 ASLB FINAL DECISIGHz 12/00/83 TECH SPECS COMPLETED:
N/S COMMISSION DECISION:
09/08/84 ISSUE LIC. WITH POWER RESTRICTION: N/5 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/08/84 SNUPPS FSAR - No. 9; Wolf Creek Site Addendum - No. 9; SCHED. DATE RECEIPT DATE ER - No. 3.
NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.:
10/00/84 08/24/82 l
--+L 4_
+%
y 4
i b
M+E 4
e es-aa.4%
E w_
F
,-.+.J b.i 4.E--*s euh-
-wha--14G%+-e
-1.=
m m
&a
_-d4-4 d
{
MRR LICEN5IMG SY$ TEM PAGE MO: 2-33 ZIMMER 1 0L CURRENT
$TATUS REPORT REPORT A5 0F 10/15/82
}
PLANT CHARACTERI5 TIC 5:
KEY PERS0MMEL l
DOCKET NO:
65000358 LIC. PM:
L. KINTMER ASLB CHAIR J. FRYE APPLICANT:
CINCIMMATI GAS 8 ELECTRIC LIC. BC:
- 8. YOUNGBLOOD MEMBER 1:
F. M00PER LOCATION:
24 MI SE OF CINCINNATI, ON LIC. LA.:
M. RUSHBROOK MEMBER 28 M. LIVING5 TOM REGIDM 3
AE 58L COUMSEL:
C. BARTM CONST. INSP D. MUMTER REAC. TYPE: BWR MS$$t GE ANTITRUST
- 5. LEWIS RESID. INSP F. CHRISTIAM50M DESIGN PWR 2436 MWT/0810 MWE CONST: KAISER RM ANALYST M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTOMES:
SCHED. DATE ACTUAL DATE SE Supplement was issued on 06/04/81. SE Supplement 82 was i ssued 10/81. SE Supplement 83 was issued on 08/23/82.
ER DOCKETED:
09/10/75 09/10/75C ER SITE VISIT COMPLETE:
10/09/75 10/09/75C IMPUT TO DES TO PM:
08/20/76 08/19/76C ISSUE DES:
10/15/76 10/15/76C RESPDMSE TO COMMENTS ON DE5*
03/25/77 04/01/77C ISSUE FES:
06/10/77 06/10/77C CURRENT ENV. STATUS 1
SAFETY /MEARING MILESTOMES:
APPLICATI0M TENDERED:
08/15/75 05/09/75C SAR DOCKETED:
09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:
10/29/76 01/06/77C SAR APPL. RESPONSE To t'5 RECEIVED: 12/31/76 07/29/77C CURRENT MRG. STATUS:
IMPUT TO DRAFT SER TO PM 01/28/77 08/11/77C 1
Hearing was completed March 5. 1982. Board decision was ISSUE DRAFT SER:
N/A rendered in June, 1982.
The Board exercised its sua INPUT TO SER:
05/20/77 12/07/77C 4
sponte authority to admit as Board issues eight new ISSUE SER:
07/29/77 St/31/79C 4
contentions. The Commission reviewed the action and t
i directed the Board to issue an appropriate order ACRS LETTER RECEIVED:
09/f6/77 03/13/79C dismissing the eight contentions from the proceeding.
IMPUTS TO SE SUPPLEMENT 38 06/17/82 08/02/82C ISSUE SE SUPPLEMENT 38 08/23/42 08/23/82C FEMA LETTER RECEIVED:
84e15/82 04/15/82C CURRENT ANTITRUST:
Antitrust review is now closed. Federal Register Notice NEARIMG STARTED:
02/26/82 02/26/82C was pubit shed 04/09/82.
ASLB IMITIAL DECISION 06/21/82 06/21/82C i
ASLB FINAL DECISION:
11/20/82 l
TECM SPECS COMPLETED:
05/00/83 i
COMMISSION DECISIDM 1t/08/83 I
I ISSUE LIC. WITM POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/09/83-SCHED. DATE RECEIPT DATE i
NEW SLIPS / MOTES:
1 Applicant by letter of 89/24/82 has revised the construction CONSTRUCTION COMPLETION - APPL.
09/08/83 09/29/82 completion target date to the third quarter of 1983.
i
MRR LICEN5ING SY$ TEM PAGE NO: 2-34 CLINCH RIVER CP CURRENT STATUS REPORT REPORT AS OF 10/15/82 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E La DOCKET NO:
05000537 LIC. PM:
. STARK LEECM ASLB CHAIR M. MILLER APPLICANT:
PROJECT MANAGEMENT CORP.; DOE;TVA LIC, BC:
P. CNECK MEMBER 1:
G. LINENBERGER LOCATION:
25 MI W OF KNOXVILLE, TN LIC. LA.:
P. SMUTTLEWORTH MEMBER 2:
C. HAND REGIDH 2
AE B8R COUNSEL:
S. TREBY CONST. INSP REAC. TYPE: LMFBR NSSS: WEST ANTITRUST J. RUTBERG RESID. INSP DESIGN PWR 0975 MWT/0350 MWE CONST: 58W RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981 A revision to the Site Suitability Report was issued June 11, 1982.
ER DOCKETED:
04/11/75 04/11/75C On August 17, 1982, NRC issued an order granting Clinch ER SITE VISIT COMPLETE:
River's request to begin site preparation activities.
INPUT TO DES TO PM:
The Site Sultability Report hearing sessions were held ISSUE DES:
02/12/76C in Oak Ridge during the week of August 23, 1982.
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
02/07/77 02/07/77C CURRENT ENV. STATUS:
The FES was issued in February 1977.
A document updating the FES was issued on July 19, 1982.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
10/15/74 10/15/74C SAR DOCKETED:
06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:
04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/16/82 07/16/82C Hearing sessions on the SSR took place on August 23-27, ISSUE DRAFT SER:
09/27/82 09/27/82C 1982.
The FES hearings are scheduled for November 15, 1982.
INPUT TO SER:
01/14/83 ISSUE SER:
03/04/83 ACRS FULL COMMITTEE MEETING:
05/06/83 INPUTS TO SE SUPPLEMENT 18 06/10/83 ISSUE SE SUPPLEMENT 1 07/01/83 CURRENT ANTITRUST HEARING STARTED:
08/23/82 08/23/82C ASLB INITIAL DECISION:
04/01/84 ASLB FINAL DECISION:
TECM SPECS COMPLETED:
COMMISSIDH DECISION:
06/01/84 CP ISSUED:
06/01/84 LATEST AMENDMENT:
NEW SLIPS / NOTES:
NRR LICEN5ING SY$ TEM PAGE NO: 2-35 PEBBLE SPRINGS I 82 CP CURRENT
$TATUS REPORT REPORT AS 00: 10/15/82 PLANT CHARACTERISTIC 58 KEY PERSONNELa DOCKET NO:
051480515 LIC. PM D. SCALETTI ASLB CHAIR:
I. SMITH APPLICANT:
PORTLAND GENERAL ELECTRIC LIC. BC8 E. ADENSAM MEMBER 18
- 0. PARIS LOCATION:
3 MI NW OF ARLINGTON. ORE LIC. LA.*
M. DUNCAN MEMBER 28 W. JORDAM REGION:
5 AE BECH COUNSEL B. BORDENICK CONST. INSP REAC. TYPE 8 PWR NSSS: B8W ANTITRUSTs B. V0GLER RESID. INSPs DESIGN PWR 3760 MWT/1260 MWE CONST8 BECH RM ANALYSTS L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Amendment 13 to the PSAR in response to 10CFR50.34(f)
(CP/ML rule) was filed 1/29/82.
The staff's review of ER DOCKETED:
08/06/74 08/06/74C the TMI-2 issues is presently in a hold status awaiting ER SITE VISIT COMPLETE:
a decision by PGE whether or not to continue their INPUT TO DES TO PM8 18/11/74 12/11/74C appilcation at a different site (see Environmental Status).
ISSUE DES:
11/15/74 81/86/75C A decision is expected within 2 months.
RESPONSE TO CCMMENTS ON DES:
83/87/75 03/22/75C ISSUE FES:
84/07/75 84/16/75C CURRENT ENV. STATUS:
On 4/9/82, PGE withdrew their application, before the Oregon Energy facility siting council, for the Pebble SAFETY / HEARING MILESTONES 8 Springs site.
The alternative sites hearing before the ASLB scheduled for 4/20/82 was cancelled.
APPLICATION TENDERED:
06/87/74 86/07/74C SAR DOCKETED:
15/18/74 10/18/74C SAR Q'S RECEIVED BY PM 12/13/74 01/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED 8 O2/14/75 02/04/75C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/11/75 85/23/75C A prehearing conference on alternative sites was held ISSUE DRAFT SER on December 1,
1981.
INPUT TO SER:
09/01/75 12/08/75C ISSUE SER:
01/05/76 st/12/76C ACRS LETTER RECEIVED:
11/12/76 02/12/76C INPUTS TO SE SUPPLEMENT 6 8 09/89/76 12/14/77C ISSUE SE SUPPLEMENT 68 N/S CURRENT ANTITRUST:
Antitrust review is complete.
HEARING STARTED:
ASLB INITIAL DECISIONJ M/S ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
N/S CP ISSUED:
N/$
LATEST AMENDMENT:
Amendment 13 to the PSAR in response to 10CFR50.34(f).
NEW SLIPS / NOTES:
NRR LICEN5IOG SY5 TEM PAGE NO: 2-36 SKAGIT/HANFORD 182 CP CURRENT 5TATUS REPORT REPORT AS OF8 10/15/82 PLANT CHARACTERI5IICSt KEY PER50NNELa DOCKET NO:
052280523 LIC. PM:
C. M00M ASL8 CHAIR J. WOLF APPLICANT:
PUGET SOUND POWER 8 LIGHT LIC. BC:
E. ADENSAM MEMBER 18 F. N00PER LOCATION:
30 MI. NW OF RICMLAND, WA.
LIC. LA.:
M. DUNCAM MEMBER 2 G. LINEMBERGER REGION:
5 AE8 BECH COUNSEL 8 R. BLACK CONST. INSPs REAC. TYPEt BWR H5558 GE ANTITRUST
- B. V0GLER RESID. INSPs DESIGN PWRt 3833 MWT/1277 MWE CONSTt BECH RM ANALYST 8
- 5. HEDLUND CURRENT SAF. STATUS
- ENVIRONMENTAL MILESTONE 58 SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI-related action items. Site relocation ER amendment and PSAR ER DOCKETED:
09/30/74 89/30/74C amendment were submitted on 12/31/81 The applicant is ER SITE VISIT COMPLETE 02/05/82 02/05/82C r
relocating the site to the Hanford Reservation.
INPUT TO DES TO PM:
04/09/82 84/09/82C On 7/16/82, the staff requested additional geological ISSUE DES:
05/04/82 05/04/82C fleid data.
Submittal and review of this data will RESPONSE TO COMMENTS ON DES:
08/06/82 09/38/82C require a delay in issuance of supplement No. 3 to ISSUE FES:
12/09/82 SER to 11/82.
CURRENT ENV. STATUS:
Site relocation (to Nanford) DES was issued on May 4, 1982. The FE5 is expected to be issued 12/82.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED 88/86/74 08/06/74C SAR DOCKETED:
01/15/75 st/15/75C SAR Q'S RECEIVED BY PM:
02/10/82 82/10/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/82 CURRENT HRG. STATU58 IMPUT TO DRAFT SER TO PM:
A special prehearing conference was held on May 5, 1982.
ISSUE DRAFT SER:
Safety hearings are expected to begin in 02/83.
INPUT TO SER:
07/11/7'i 07/11/77C Environmental hearings, except for need-for power, are ISSUE SER8 08/31/77 88/31/77C expected to begin in 04/83. Need-for power hearing is 6xpected to begin in 05/83 after the Regional Power ACRS FULL COMMITTEE MEETING:
01/05/83 Council publishes a regional conservation and electric INPUTS TO SE SUPPLEMENT 3:
10/88/82C power plan in 04/83.
ISSUE SE SUPPLEMENT 3:
11/15/82 CURRENT ANTITRUST Complete NEARING STARTED 8 07/15/75 87/15/75C ASLB INITIAL DECISION:
04/00/83 ASLB FINAL DECISION:
N/5 TECH SPECS COMPLETED:
N/A COMMISSION DECISION:
07/08/83 CP 155UED8 07/80/83 LATEST AMENDMENT:
NEW SLIPS / NOTE 58 i
l
MRR LICEN5ING SYSTEM PAGE NO: 2-37 (BOP)BOPSSAR/BSAR-205 PDA CURRENT
$TATUS REP 0RT REPORT AS OF 10/15/82 PLANT C N A R A C T E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCKET NO:
05000560 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
FLUOR POWER SERVICES LIC. BC:
C. THDNAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
1 AE FLUOR COUNSEL:
N/A CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR 0000 MWT/0000 MWE CONST:
RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESFDNSEsTO CnMMENTS ON DES:
ISSUE FES:
e' CURRENT ENV. STA1US:
r s.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
10/31/77 10/31/77C SAR DOCKETED:
r10/31/77 10/31/77C
~ a SAR Q'S RECEIVED BY PM:
s-
.04/14/78 06/20/78C SAR APPL. RESPONSE TO Q'S RE EIVED: 06/02/78 07/31/78C INPUT TO DRAFT'3ER"70 PM:
05/25/78
'97/07/7F.C CURRENT NRG. STATUS:
L ISSUE DRAFT SER "
INPUT TO SER:
08/21/78 10('7/78c ISSUE SER:
10/02/78 12/29/ 78C' ACRS LETTER REdb3VED - -
11/17/78 02/16/79('
INPUTS TO SE SUPPLEMENT-is 12/08/78 03/21/79C*
ISSUE SE SUPPLEMENT 1:
N/S
"'+-
~
"^
CURR NT ANTITRUST b 7
NEARING STARTED:
ASLB INITIAL DECISION:
COMMISSICH CECISION:
-i
- ?
.SPECIAL fROJECT COMPLETE:
N/S
+
,3
'< J
_ j LATEST AMENDMENT:
NEW SLIPS / NOTES:
vo ei"#
~
~
NO 4W w 4@
'., [;
e,
jQ. *
- l,
i -
- t
-,g
{.-
- 1. '.'..,A
,.. g
>y
~-
- . y...,, ; -
,8.-
..v.
%.1 N, R R LICEN$INO SYSTEM PAGE NO: 2-38 (BOP)ESSAR/BSAR-205 PGA CURRENT STATUS REPORT REPORT AS OF 10/15/82 KEY PERSONNELa PLANT CNARACTERISTICS LIC, PM:
. UNASSIGNED ASLB CHAIR:
DOCKET NO:
00002591 LIC. BC C. THOMAS MEMBER 1 APPLICANT:
EBASCO SERVICES LIC. LA.:
P. ANDERSON
" EMBER 2:
REGICH:
0 AE2 EBASCO COUNSEL:
. UNASSIGNED
'OMST. INSP:
LOCATION:
N/A ANTITRUST:
RESID. INSP:
REAC. TYPE: BOP NSSS:
DESIGN PWR 0000 MWT/0000 MWE CONST:
RM ANALYST M. KING l
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Review in abeyance pending the future of standardization, ER DOCKETED:
and resources to conduct review.
ER' SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DE5 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL RESPONSE TO q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:
N/S CURRENT NRG. STATUS:
ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SU?PLEMENT 18 N/S CURRENI ANTITRUST NEARING STARTED:
ASLB INITIAL DECISION:
COMMISSIDH DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
NRR LICEN$ING SYSTEM PAGE NO: 2-39 (80P)ESSAR/CESSAR-80 PDA CURRENT STATUS REP 0RT REPORT AS oft 10/15/42 PLANT CHARACTERI$ TIC $3 KEY PERS0NNEL8 DOCKET NO:
05000591 LIC. PM:
. UNASSIGNED ASLB CHAIR 8 APPLICANT 8 EBASCO SERVICES LIC. BC:
C. THOMAS MEMBER 18 LOCATION:
N/A LIC. LA.:
P. ANDERSON' MEMBER 2:
REGION:
0 AE:
EBASCO COUNSEL:
. UNASSIGNED CONST. INSP REAC. TYPE: BOP HSSS:
ANTITRUST:
RESID. INSP8 DESIGN PWR 3800 MWT/0000 MWE CONST:
RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETEt' INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES 8 APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO 9'S RECEIVED: N/5 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETINGt N/S INPUTS TO SE SUPPLEMENT 18 N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSIDH DECISION:
SPECIAL PROJECT COMPLETE 8 N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
f
NRR LICEN5ING SYSTEM PAGE NO: 2-40 (50P)ESSAR/RESAR-414 PDA CURRENT 5TATUS REPORT REPORT AS OF8 10/15/82 PLANT CHARACTERI5 TIC 53 KEY PERS0NNELa DOCKET NO 00007591 LIC. PM:
. UNASSIGNED ASLB CHAIR APPLICANT:
EBASCO SERVICES LIC. BC:
C. THOMAS MEMBER 18 LOCATIDH2 N/A LIC. LA.:
P. ANDERSON MEMB ER 2 8 REGION:
0 AE EBASCO COUNSEL:
, UNASSIGNED CONST. INSPs REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSPs l
DESIGN PWR 0000 MWT/0000 MWE CONST8 RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONE 58 SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED 8 ER SITE VISIT COMPLETE:
INPUT TO DES TO PMt ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATU58 SAFETY / NEARING MILESTONES:
APPLICATICH TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM N/5 SAR APPL. RESPONSE TO Q'S RECEIVED 8 N/5 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/5 ISSUE DRAFT SER:
INPUT TO SER:
N/5 ISSUE SER N/S ACRS FULL COMMITTEE MEETING N/S INPUTS TO SE SUPPLEMENT 18 N/S ISSUE SE SUPPLEMENT 1:
N/5
{
CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISIGHz SPECIAL PROJECT COMPLETE:
N/5 LATEST AMENDMENT:
HEW SLIPS / MOTES:
NRR LICEN5ING SYSTEM PAGE NO: 2-41 (BOP)GAISSAR PDA CURRENT STATUS REP 0RT REPORT AS OF 10/15/82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000595 LIC. PM:
. UNASSIGNED ASLB CNAIR:
APPLICANT:
GILBERT COMMONWEALTH LIC. BC C. THOMAS MEMBER 1 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2 REGION:
4 AE WEST COUNSEL:
M. KARMAN CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP DESIGN PWR 0000 MWT/0000 MWE CONST:
RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS CN DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/24/78 02/24/78C SAR DOCKETED:
08/21/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
N/S INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW LLIPS/ NOTES:
MRR LICEN$ING SYSTEM PAGE NO: 2-C2 (BOP)GIBBSSAR (W)
PDA CURRENT STATUS REP 0RT REPORT AS OF 10/15/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L8 DOCKET NO:
05000534 LIC. PM8
. UNASSIGNED ASLB CHAIR APPLICANT 8 GIBBS 8 HILL LIC. BC C. THOMAS M EMBER 1:
LOCATION:
N/A LIC. LA.
P. ANDERSON MEMBER 2:
REGIOMs O
AE GHDR COUNSEL:
M. WAGNER CONST. INSPs REAC. TYPE: BOP NS$$8 ANTITRUST
- RESID. INSPs DESIGN PWR8 0000 MWT/0000 MWE CONST RM ANALYST M. ANDERSON CURRENT SAF. STATUS
- ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/15/76 10/15/76C SAR DOCKETED:
04/08/77 05/10/77C SAR Q'S RECEIVED BY PMt 02/03/78 03/16/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. %TATUS*
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1:
N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE 8 M/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
NRR LICENSIHG SY$ TEM PAGE NO: 2-43 (BOP)SWESSAR/BSAR-205 PDA CURRENT
$TATUS REPORT REPORT AS OF 10/15/82 PLANT CNARACTERISTICSt KEY PERS0NNELa DOCKET NO:
00000595 LIC. PM:
. UNASSIGNED ASLB CH4IR8 APPLICANT:
STONE & WEBSTER LIC. BC:
C. THOMAS MEMBER 18 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 28 REGION:
0 AE 58W COUNSEL:
. UNASSIGNED CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSPs DESIGN PWR 0000 MWT/0000 MWE CONST N/A RM ANALYST M. KINO CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
N/A ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES 8 ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES 8 APPLICATION TENDERED:
12/15/75 12/22/75C SAR DOCKETED:
12/22/75 12/22/75C SAR Q'S RECEIVED BY PM:
11/12/76 04/04/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/14/77 05/20/77C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER INPUT TO SER:
09/09/77 10/13/77C ISSUE SER:
10/19/77 12/02/77C ACRS LETTER RECEIVED:
01/15/78 01/13/78C INPUTS TO SE SUPPLEMENT 18 N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST:
NEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
NRR LICEN5ING SYSTEM PAGE NO: 2-44 (NSS)CESSAR SYSTEM 80 FDA C U'R R E N T STATUS REPORT REPORT AS OF 10/15/82 PLANT CHARACTERISTICSt KEY P E R S O N N E La DOCKET NO:
65000470 LIC, PM C. GRIMES ASLB CHAIR:
APPLICANT:
COMBUSTION ENGINEERING LIC. BC C. THOMAS MEMBER 1 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE COUNSEL:
M. WAGNER CONST. INSP REAC. TYPE: PWR MSSS: COMB ANTITRUST:
RESID. INSP i
DESIGN PWR: 3c00 MWT/1295 MWE CONST:
RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER (NUREG-0852) issued 11/81. Awaiting documentation to resolve ACRS, open, and confirmatory issues.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM ISSUE DES:
)
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
j CURRENT ENV. STATUS:
M/A.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/27/78 10/27/78C SAR DOCKETED:
12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:
09/01/80 09/01/81C SAR APPL. RESPONSE TO 4'S RECEIVED: 01/01/81 07/15/81C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S N/A.
ISSUE DRAFT SER:
N/S INPUT TO SER:
11/01/81 11/13/81C ISSUE SER:
05/01/82 11/10/81C ACRS LETTER RECEIVED:
06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 18 02/28/83 ISSUE SE SUPPLEMENT 18 03/30/83 CURRENT ANTITRUST:
NEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSIDH DECISION:
07/00/83 SPECIAL PROJECT COMPLETE:
07/29/83 LATEST AMENDMENT:
MEW SLIPS / NOTES:
_=__
~,- _
t j
NRR LICEN5ING SYSTEM PAGE NO: 2-45 (NSS)GESSAR SEVERE ACC FDA CURREN1 STATUS REP 0RT REPORT AS OF 10/15/82-PLANT CNARACTERI5 TIC $8 KEY P E R S 0 N N E L:
4 DOCKET NO 00007447 LIC. PM:
D. LYNCH ASLB CHAIR. M/A i
APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C. THOMAS MEMBER 18 N/A LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 28 N/A REGION:
0 AE BRAUN COUNSEL:
B. BORDENICK CONST. INSP REAC. TYPE: BWR HSSS: GE ANTITRUST:
RESID. INSP DESIGN PWR 3579 MWT/1220 MWE CONST:
RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.
Dates shown reflect review for the severe accident ER DOCKETED:
design.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
1 ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C 4
SAR Q'S RECEIVED BY PM:
10/15/82 SAR APPL. RESPONSE TO 9'S RECEIVED: 02/01/83 i
CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
INPUT TO SER:
02/01/84 ISSUE SER:
03/01/84 ACRS FULL COMMITTEE MEETING:
04/06/84 1
l INPUTS TO SE SUPPLEMENT 18 04/21/84 ISSUE SE SUPPLEMENT 18 05/25/84 CURRENT ANTITRUST:
FDA antitrust review is in progress.
NEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSIDH DECISION:
05/00/84 SPECIAL PROJECT COMPLETE:
05/08/84 LATEST AMENDMENT:
i FDA Amendment No. 6 was received in August, 1982.
NEW SLIPS / MOTES:
HRR LICEN5ING
$Y$ TEM PAIE NO: 2-46 (NSS)GESSAR-238 MI FDA CURRENT STATUS REP 0RT REPORT AS OF 10/15/82 PLANT CHARACTERISTICSt KEY P E R S O N N E La l
DOCKET NO:
05000447 LIC. PM D. LYNCH ASLB CHAIR N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C. THOMAS MEMBER 18 M/A LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 28 N/A REGION:
0 AE:
BRAUN COUNSEL:
B. BORDENICK CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:
RESID. INSP DESIGN PWR: 3579 MWT/1220 MWE CONST:
RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82.
The foundation analysis issue will require special attention. PRA for severe ER DOCKETED:
accident design was submitted 4/82.
Severe accident ER SITE VISIT COMPLETE:
design modifications were submitted 6/82 in Amendment INPUT TO DES TO PM:
No. 4.
GE has requested the EDO to accelerate the ISSUE DES:
PRA review schedule to coincide with the FDA.
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
I CURRENT ENV. STATUS i
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
10/15/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 12/30/82 CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
INPUT TO SER:
02/01/03 ISSUE SER:
03/02/J3 ACRS FULL COMMITTEE MEETINC:
04/08/83 INPUTS TO SE SUPPLEMENT 1:
04/15/83 ISSUE SE SUPPLEMENT 18 05/12/83 CURRENT ANTI (RUST:
FDA-anti'. rust review is in progress.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION DECISION:
05/00/83 SPECIAL PROJECT COMPLETE:
05/08/83 LATEST AMENDMENT:
FDA Amendment No. 6 was received in August, 1982.
NEW SLIPS / NOTES:
NRR LICEN5ING 5YSTEM PAGE NO: 2-47 (SP)FNP 1-8 (MANUF.)
SPC CURRENT STATUS REP 0RT REPORT AS OF8 10/15/82 PLANT CHARACTERI5TICSt KEY P E R S O N N E Lt DOCKET N08 05000437 LIC PM:
. UNASSIGNED ASLB CHAIR *
- 5. WOLFE APPLICANT 8 0FFSNORE POWER SYSTEMS LIC. BC:
E. ADENSAM MEMBER 1 D. SCHINK LOCATION:
JACKSONVILLE, FLA.
LIC. LA.
M.'DUNCAN MEMBER 28 G; BRIGNT REGION:
2 AE OPS COUNSEL:
D. GODDARD CONST. INSP REAC. TYPEt PWR NSSS: WEST ANTITRUST
- J. RUTBERG RESID. IM5P8 DESIGN PWR8 3411 MWT/1150 MWE CONST: OPS RM ANALYST B. ST MARY ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SSER 4, ML matters have been addressed by applicant.
covering TMI requirements and other previous unresolved ER DOCKETED:
07/05/73 07/05/73C issues, was issued 09-29-81.
An ACRS subcommittee ER SITE VISIT COMPLETE:
08/16/73 08/16/73C meeting was held on 10-15-81.
The ACRS sent a favorable INPUT TO DES TO PM:
07/01/74C letter on 10-19-81.
Commission Decision is projecteo ISSUE DES:
04/12/74 07/24/74C for 10-82.
RESPONSE TO COMMENTS ON DES 8 ISSUE FES:
10/06/75 10/06/75C i
CURRENT ENV. STATUS:
All environmental statements have been issued.
SAFETY / NEARING MILESTONES:
j APPLICATION TENDERED:
05/07/73 05/07/73C SAR DOCKETED:
07/05/73 07/05/73C SAR Q'S RECEIVED BY PM 02/15/74 02/15/74C SAR APPL. RESPONSE To t's RECEIVED: 04/08/74 04/08/74C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/25/75 07/25/75C j
Suppl. 4 to the SER was entered into the record on 12-4-81.
ISSUE DRAFT SER:
Hearing reopened and closed on 12-4-81.
Licensing Board INPUT TO SER:
08/22/75 08/22/75C 1
issued an Initial Decision on 6-30-82, authorizing the ISSUE SER:
09/30/75 09/30/75C Director of HRR to issue a manufacturing Ilconse, subject
}
to a condition, to OPS for the manufacturing by the end ACRS LETTER RECEIVED:
10/19/81 10/19/81C of 1999 of eight standardized floating nuclear plants at IMPUTS TO SE SUPPLEMENT 48 02/20/76 03/05/76C Blount Island, Jacksonville, Florida.
ISSUE SE SUPPLEMENT 48 09/09/81 09/29/81C CURRENT ANTITRUST
)
NEARING STARTED:
06/17/76 06/15/76C ASLB IMITIAL DECISION:
06/30/82 06/30/82C-COMMISSION DECISION:
10/08/82 SPECIAL PROJECT COMPLETE 8 10/00/82 LATEST AMENDMENT:
i l
NEW SLIPS / NOTES:
l
NRR LIC*N5ING SYSTEM PAGE NO: 2-48 CARROLL SITE ESR CURRENT STATUS REPORT REPORT AS OF 13/15/82 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:
05000599 LIC. PM:
J. WILSON ASLB CHAIR J. WOLF APPLICANT:
COMMONWEALTH EDISON LIC. BC:
C. THOMAS MEMBER 1 G. BRIGHT LOCATION:
CARROLL COUNTY, IL.
LIC. LA.:
P. ANDERSON MEMBER 2:
R. HOLTON REGION:
3 AE:
COUNSEL:
R. LESSY CONST. 1HSP REAC. TYPE:
MSSS: WEST ANTITRUST A. HODGDON RESID. INSP DESIGN PWR 0000 MWT/1120 MWE CONST:
RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE
-The commercial operation date has been postpongd untti 1999 - 2000.
This license ER DOCKETED:
04/07/79 04/07/79C is not under active review.
ER SITE VISIT COMPLETE:
N/S INPUT TO DES TO PM:
N/S ISSUE DES:
N/S RESPONSE TO COMMENTS ON DES:
N/S ISSUE FES:
N/S CURRENT ENV. STATUS:
Portions of the alternate site study are under review by DOE.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/20/78 12/20/78C SAR DOCKETED:
SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TD Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Five intervenors have been admitted.
ISSUE DRAFT SER:
IMPUT TO SER:
ISSUE SER:
ACRS FULL COMMITTEE MEETING:
INPUTS TO SE SUPPLEMENT ISSUE SE SUPPLEMENT CURRENT ANTITRUST
)
Awaiting updated antitrust information from applicant.
HEARING STARTED:
N/S ASLB IMITIAL DECISI0H:
N/S SPECIAL PROJECT COMPLETE:
N/S l
LATEST AMENDMENT:
NEW SLIPS / MOTES:
NRR LICEN$ING SY$ TEM AS OF 10/15/82 NON-P0WER REACT 0RS IMPUT ISSUE EARLIEST ISSUEu TO SER ISSUE FES OR START ISSUE NON-POWER FACILITY DOCKET R11 TO PM lig 11A HE4 RING R1 COMMENTS AFRRI, TRIGA 1000.0000W TAMK ESTIMATED DATE: 10/80 N/A 01/82 N/S 09/82 N/S CONTESTED CASE ACTUAL DATE:
10/80C 01/82C NBSR 10.0000W T ESTIMATED DATE: 12/80 02/82 11/82 08/82 01/83 POWER INCREASE TO 20 MW ACTUAL DATE:
12/80C 02/82C 08/82C INCLUDED IN RENEWAL TEXAS A8M, TRIGA 1000.0000W POOL ESTIMATED DATE: 07/79 N/A 10/82 11/82 11/82 ACTUAL DATE:
07/79C U. OF FLA., ARG0HAUT 100.0000W GRAPH ESTIMATED DATE: 01/81 N/A 06/82 11/82 N/A 11/82 ACTUAL DATE8 01/8tC 06/82C U. OF VA.
2000.0000W POOL ESTIMATED DATE: 03/77 N/A 09/82 09/82 N/A 09/82 ACTUAL DATE:
03/77C 09/82C 09/82C 09/82C WORCESTER POLY TECH 10.0000W ESTIMATED DATE: 07/79 N/A 10/82 N/S N/A 10/82 ACTUAL DATE:
07/79C W FOR TEST REACTORS ONLY
M M
M Z
O M
O W
to i
I l
I
~
PAGE NO: 2-NRR LICEHSING SYSTEM 0L CURRENT STATUS REPORT REPORT AS OF KEY P E R S 0 H H E L:
PLANT C H A R A C T E R I S T I C S:
LIC. PM:
Licensing Project Manager ASLB CHAIR: ASLB Chairman DOCKET HO:
Docket No.or Project No'.,if not docketed LIC. BC:
Licensing Branch Chief MEMBER 18 on panet LIC. LA.:
Licensing Assistant MEMBER 2
-on panet APPLICANT:
Utility LOCATION:
Miles and direction from nearest major town REGION:
1 through 5 AE:
Architect / Engineer COUNSEL:
Attorney assigned to case CONST. INSP : Construction Inspector REAC. TYPE:
PWR, BWR, HTGR or LMFBR HSSS: Nuclear Steam Systems SuppGer ANTITRUST:
Antitrust Attorney RESID, INSP: Resident inspector DESIGH PWR: Megawatts electric & thermal CONST: Constructor MPA ANALYST: MPA analyst assigned to track project ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Saf0ty status for this reporting period only. It consists of accomplishments and schedu!e ER DOCKETED:
Environmental Report changes occurring since the last issue of Blue Book. Outstanding issues and late input from T
roview branches should be indicated, along with indication of the critical path, p
0 T
Project Manager ISSUE DES:
Draft Environmental Statement RESPONSE TO COMMENTS OH DES' Final Environmental Statement ISSUE FES STATUS:
CURRENT ENV.
Environmental status for this reporting period only, it consists of accomplishments and SAFETY / HEARING MILESTONES:
schedule changes occurring since the last issue of Blue Book. Outstanding issues and late input from review branches'should be indicated.
APPLICATION TENDERED:
SAR DOCKETED:
Safety Analysis Report SAR C'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
IHPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
ISSUE DRAFT SER:
Safety Evaluation Report Changes in the hearing dates since the last issue of Blue Book. Changes in intervention and ER:
contentions should be indicated.
ACRS LETTER RECEIVED:
Advisory Cemmittee INPUTS TO SE SUPPLEMENT 3:
on Reac+or Safeguards ISSUE SE SUPPLEMENT 3:
FEMA LETTER RECEIVED:
Safety Evaluation Supplement CURRENT ANTITRUST:
HEARING STARTED:
Changes in the antitrust status since the last issue of Blue Book.
ASLB IHITIAL DECISION:
Atomic Safety & Licensing Board
~
ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISI0Hz ISSUE PARTIAL POWER LICENSE:
ISSUE FULL POWER LICENSE:
LATEST AMENDMENT:
The latest amendment submitted by the applicant.
NEW SLIPS /HGTES:
CONSTRUCTIDH COMPLETIDH - APPL.*
MI*,te f notice of
'h Slips or potential problems that should be brought to management's attention.
wnstruction in construction completion completion
1.
EPORT NUM"E R (Assped t DOCA
,",),* " 335
~ u S. NUCLE.".3 CEIUL ATORY COMMISSION BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vol. 11 No.10
- 2. (Ecare blaa41 1 T AT L E AN D SUBi tT LE (Add volume No. it apasopr<aref R:gulatory Licensing Status Sumary Report 3 RECIPIEtM ACCE SSION NO.
(Blue Book)-
S. DATE REPORT COMPLE TED
- 7. AUTHORtSi MON Te4 l YL AR october 1982 DATE REPORT ISSUED 9 PERF ORMING ORGANIZATION NAME AND M AILING ADDRESS (include Isp Codef "oNTH Ive^a Office of Resource Management Management Information Branch
_ October 1982 6 (L '*<' '"*' a i U. S. Nuclear Regulatory Comission Washington, D.C.
20555 B. fleave blanhj 12 SPONSORING ORGAN 12 AllON NAME AND MAILING ADORESS (Include Ic Codel 10 PROJECT 1 ASMWORK UNIT NO.
Office of Resource Management si. CONT R ACT NO.
Management Information Branch U. S. Nuclear Regulatory Comission Washington, D.C.
20555 PE RIOD COVE RE D (/nclus,ec dates /
- 13. TYPE OF REPORT September 16, 1982 - October 15, 1982 14 - (L '*"' 8'd*' I
- 15. SUPPLEMENTARY NOTES 16 ABSTR ACT (200 words or sess/
Provide a review of the s'tatus of the progress of the licensing reviews for all construction permits, operating license, special project and non-power reactor renewals under review, as reported to Congress.
17a DE SCRIPTORS t 7 KE Y WORDS AND DOCUME NT AN ALYSIS I
I i
'l7b IDE NisF tE RS OPEN ENDE D TE RMS 19 SE CURITY CLt.S$ #Tr S 'rDorte 2:
- O OF Pt GE S
'I IS AV All ABILIT Y ST ATE t.*E NT Unciassified l
Unlimited-
- og i,Y cggg it' ow'
- "'CE S
j i
{
UNITE D STATES
,,,3, g g,33,,,,
NUCLEAR REGULATORY COMMISSION Postact a satsea o WASHINGTON. D.C. 20566
..'3Y [ c es ama n. nr.
OFFICIAL BUSINESS PENALTY FOR PRIVATE USE. $300 O
l A
e i
a f
d 0
0 4
4 I
i 4