Proposed Tech Spec Page 3/4 3-25 Re Isolation Actuation Instrumentation Surveillance Requirements
ML20027E570
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/11/1982
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20027E552 List:
References
NUDOCS 8211150499
Download: ML20027E570 (1)


Text

_ _.

e TTto EN TABLE 4.5.2-1 ou Qg ISOLATION ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS sd 5:

N: J o

CHANNEL OPERATIONAL hM CHANNEL FUNCTIONAL CHANNEL CONDITIONS IN WHICH g

g TRIP FUNCTION AND INSTRUMENT NUMBER CHECK TEST

_ CALIBRATION SURVEILLANCE REQUIRED.

' T tJ -

& @$"1.

PRIMARY CONTAINMENT ISOLATION U

a.

Reactor Vessel Water Level - low i

w 1.

Level #1 D

M R

1, 2, 3 (B21-LIS-N017 A,B,C,D) 2.

14 vel #2 D

M R

1, 2, 3 (B21-LIS-N024 A,B and B21-LIS-N025 A,B) b.

Drywell Pressure - High NA M

Q 1,2,3 (C72-PS-N002 A,B,C,D) c.

Main Steam Line M

1.

Radiation - High D

W R

1, 2, 3 (D12-RM-K603 A,B,C,D)

Y 2.

Pressure - Low NA M

Q l

O (B21-PS-N015 A,B,C,D) 3.

Flow - High NA M

Q l

(B21-dPIS-N006 A,B,C,D; B21-dPIS-N007 A,B,C,D; B21-dPIS-N008 A,B,C,D; and B21-dPIS-N009 A,B,C,D) 4.

Flow - High NA M

Q 2,3 (B21-dPIS-N006A; B21-dPIS-N007B; B21-dPIS-N008C; and B21-dPIS-N009D) d.

Main Steam Line Tunnel Temperature - High NA M

R 1, 2, 3 (B21-TS-N010 A,B,C,D; B21-TS-N011 A,B,C,D; B21-TS-N012 A,B,C,D; and B21-TS-N013 A,B,C,D) e.

Condenser Vacuum - Low NA M

R 1, 2#

g (B21-PS-N056 A,B,C,D) to U

f.

Turbine Building Area Temp-High NA.

M R

1, 2, 3 g

(B21-TS-3225 A,B,C,D; B21-TS-3226 A,B,C,D; B21-IS-3227 A,B,C,D; B21-TS-3228 A,B,C,D; re

s B21-IS-3229 A,B,C,D; B21-TS-3230 A,B,C,D; B21-TS-3231 A,B,C,D; and B21-TS-3232 A,B,C,D)

F When any turbine stop valve is open.

.