Forwards IE Insp Rept 50-305/82-13 on 820701-0831 & Notices of Violation & Deviation
ML20027D063
Person / Time
Site: Kewaunee 
Issue date: 10/13/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Giesler C
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20027D064 List:
References
NUDOCS 8210280223
Download: ML20027D063 (2)


See also: IR 05000305/1982013

Text

,

e

OCT 13 198g

Docket No. 50-305

Wisconsin Public Service

Corporation

ATTN:

Mr. C. W. Ginsler

Vice President

Nuclear Power

Post Office Box 1200

Green Bay, WI 54305

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. L. Nelson

of this office during the period of July 1-August 31, 1982, of activities

at the Kewaunee Nuclear Power Plant authorized by NRC Operating License

No. DPR-43 and to the discussion of our findings with Mr. D. C, Hintz at

the conclusion of the inspection.

11:e enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

The inspection showed that action had been taken to correct the identified

noncompliance and to prevent recurrence. Consequently, no reply to this

noncompliance is required and we have no further questions regarding this

matter at this time.

Certain other activities, set forth in Appendix B to this letter, appear to

be a deviation from commitments which you have made in previous correspondence

with the Commission.

Please advise us in writing within thirty days of the

l

date of this letter of the corrective action you have taken or plan to take,

showing the estimated date of completion with regard to this deviation.

1

[

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

,

that you (or your contractors) believe to be exempt from disclosure under

!

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

I

'

8210280223 821013

[66) /

PDR ADOCK 05000305

O

PDR

_ , ,

l

N c v, , ,

. . .

.

Wisconsin Public Service

2

Corporation

.

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which~

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity.

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by J. F. Streeter

J. F. Streeter, Chief

Projects Branch 2

Enclosures:

1.

Appendix A, Notice

of Violation

2.

Appendix B, Notice

of Deviation

3.

Inspection Report

No. 50-305/82-13(DPRP)

cc w/encls:

D. C. liintz, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Stanley York, Chairman

Public Service Commission

RIII

RII

RIII

e son p

V eyes

- r

,

3

( G,fg

,,,,,

, - , -

/ o /6 94

N

..

__

,