Text
,
e
OCT 13 198g
Docket No. 50-305
Wisconsin Public Service
Corporation
ATTN:
Mr. C. W. Ginsler
Vice President
Nuclear Power
Post Office Box 1200
Green Bay, WI 54305
Gentlemen:
This refers to the routine safety inspection conducted by Mr. R. L. Nelson
of this office during the period of July 1-August 31, 1982, of activities
at the Kewaunee Nuclear Power Plant authorized by NRC Operating License
No. DPR-43 and to the discussion of our findings with Mr. D. C, Hintz at
the conclusion of the inspection.
11:e enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
The inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence. Consequently, no reply to this
noncompliance is required and we have no further questions regarding this
matter at this time.
Certain other activities, set forth in Appendix B to this letter, appear to
be a deviation from commitments which you have made in previous correspondence
with the Commission.
Please advise us in writing within thirty days of the
l
date of this letter of the corrective action you have taken or plan to take,
showing the estimated date of completion with regard to this deviation.
1
[
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
,
that you (or your contractors) believe to be exempt from disclosure under
!
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
I
'
8210280223 821013
[66) /
PDR ADOCK 05000305
O
_ , ,
l
N c v, , ,
. . .
.
Wisconsin Public Service
2
Corporation
.
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which~
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity.
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
,
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original signed by J. F. Streeter
J. F. Streeter, Chief
Projects Branch 2
Enclosures:
1.
Appendix A, Notice
of Violation
2.
Appendix B, Notice
of Deviation
3.
Inspection Report
No. 50-305/82-13(DPRP)
cc w/encls:
D. C. liintz, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Stanley York, Chairman
Public Service Commission
RIII
RII
RIII
e son p
V eyes
- r
,
3
( G,fg
,,,,,
, - , -
/ o /6 94
N
..
__
,