Text
-
saa 8'8
"$E NUREG-0580 "l
Vol.11, No. 9 s
[E
- z
_zzz::xzz_ _-_rz: __ _ _ :__ z : __ ; 1-
'-- zzz z_: zi--
REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE B0010 AUGUST 17 - SEPTEMBER 15,1982 1
UN!TED STATES NUCLEAR REGULATORY COMMISSION 1
pn %q r
L____
Avaital>le from N HC/GPO Sales Program Superintendent of Documents Government Printing Off.cc Washingtor. D. C. 20402 A year's subscription consists of 12 issues for this publication.
Mrcrofiche of single copies are availalile from NRC/GPO Sales Program Washington, D. C. 20555 l
l t
NUREG-0580 Vol.11, No.9 REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)
AUGUST 17 - SEPTEMBER 15,1982
$ ate Pub she p mb r 982 Prepared for: 0FFICE OF NUCLEAR REACTOR REGULATION
. NUC EGU TORY M SiON WASHINGTON, D.C. 20555 l
p*"'%,,
t l
l FOREWORD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS
SUMMARY
REPORT, IS DESIGNED TO PROVIDE THE HECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION MUCLEAR REACTOR APPLICATIONS.
IT UTILI3ES DATA COLLECTED FROM THE OFFICE OF HUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION 8 ENFORCEMFMT, AND THE NATIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.
SECTION I 0F THIS EDITION CONSISTS OF THE THREE
SUMMARY
OF AC*0MPLISHMENTS, THE HEW APPLICATI0H FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.
SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY IHFORMATION. ALL OL'S APE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A HON-POWER REACTOR
SUMMARY
EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.
LICEM$ING 0F MUCLEAR REACT 0RS THE U.S. NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER TO OPERATE IT.
LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING LICENSE.
THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AMD ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.
THE HRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AMD TO THE PUBLIC DOCUMENT ROOM. TECHMICAL EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATIDM AND AM ENVIRONMEMIAL IMPACT STATEMENT. THESE DOCUMENTS ARE ALSD MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.
THE STAFF'S ANALYSIS IS SUBMITTED TO THE HRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE i
APPLICANT, THE LICENSING STAFF AND OTHERS. THE ACRS FINDINGS ARE REPORTED TO THE MRC AND MADE PUBLIC.
A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPOSED SITE, BY AM NRC APPOINTED ATOMIC SAFETY a LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.
AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAIMST GRANTING A COMSTRUCTIDH PERMIT.
THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICEMSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGULATORY COMMISSION.
IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTIDH PERMIT, THE DIRECTOR OF THE DIVISIDH OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE MRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.
j AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATI0H IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN DPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE MRC IN DECIDING WHETHER OR MOT TO ISSUE THE OPERATING LICENSE.
IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTIDH PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUAMCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE COMMISSIDH.
h 6
TABLE OF C0NTENTS i
PRINTED IN THE ORDER LISTED 5ECTION I
SUMMARY
OF ACCOMPLISHMENTS OL
SUMMARY
OF ACCOMPLISHMENTS CP
SUMMARY
OF ACCOMPLISHMENTS COMBINED HUMERICAL
SUMMARY
OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE NEXT FIVE YEARS HEW APPLICATION FORECAST 8 OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION 5ECTION II PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS i
STANDARD DESIGN REVIEWS OTHER REVIEWS NON-POWER REACTORS 5ECTION III EXAMPLE REVIEW
I a
Sr
{
}
l i
I 1
k I
e i
)
1 I
i l
z O
M u
LLC m
f 4
r i
k
)
SUMMARY
0F ACC0MPLISHMENTS AS OF SEPTEMBER 15, 1982 SEPTEMBER FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL FACILITY SCHED4 LED ACTUAL SER'S SER ' S NONE BYRON 182 02/07/82 02/07/82C CALLAWAY 1 10/07/81 10/07/81C CLIMION 1 82 01/05/82 02/17/82C MIDLAND 1 82 05/11/82 05/11/82C PALD VERDE 1,2,3 11/11/81 11/11/81C PERRY 1 82 05/10/82 05/24/82C ST LUCIE 2 10/09/81 10/09/81C WASHINGTON NUCLEAR 2 03/31/82 03/31/82C WATTS BAR 1 8 2 07/01/82 07/01/82C WOLF CREEK 1 04/07/82 04/07/82C SSER 'S SS ER ' S SAN ONOFRE 2 8 3 09/07/82 09/07/82C BYRON 182 03/30/82 03/30/32C CALLAWAY 1 01/15/82 01/15/82C CLINTON 1 82 06/30/82 07/22/82C COMANCHE PEAK 1 82 10/16/81 10/16/81C COMANCHE PEAK 1 82 01/20/82 Ot/20/82C DIABLO-CANYON 1 82 10/02/81C ENRICO FERMI 2 01/26/82 01/29/82C GRAND GULF 1 42 12/10/81C GRAND GULF 1 8 2 05/14/82 06/16/8?C GRAND GULF 1 82 07/09/82 07/21/82C LASALLE 1 82 02/12/82 02/12/82C 1
LASALLE 1 8 2 04/16/82 04/16/82C LASALLE 1 42 07/14/82 07/14/82C MIDLAND 1 82 06/30/82 06/30/82C PALD VERDE 1,2,3 02/G5/f?
02/05/82C PALO VERDE 1,2,3 05/17/ A 7 05/17/82C PERRY 1 82 07/29/he 08/09/82C SAN ONOFRE 2 8 3 01/22/82 01/22/82C SAN ONOFRE 2 8 3 02/16/32 02/16/82C SAN ONOFRE 2 8 3 06/30/82 06/30/82C SAN UNOFRE 2 8 3 09/07/32 09/07/82C SHOREHAM 03/12/82C ST LUCIE 2 12/30/81 12/30/81C SUMMER 1 01/08/82 01/08/82C SU".MER 1 07/16/82 08/06/82C SUSQUEHANNA 1 82 07/00/82 07/17/82C WASHINGTON NUCLEAR 2 07/15/82 WASHINGTON NUCLEAR 2 08/11/82 08/11/82C WATERFORD 3 10/09/81 10/13/81C WATERFORD 3 01/22/82 01/13/82C WATERFORD 3 04/30/82 04/30/82C WOLF CREEK 1 08/26/82 08/26/82C ZIMMER 1 10/00/81 10/00/81C
O L-
SUMMARY
0F ACC0MPLISHMENTS AS OF SEPTEMBER 15, 1982 SEPTEMBER FISCAL YEAR TO DATE I
FACILITY SCHEDULEE ACTUAL FACILL11 SCHEDULEQ ACTUAL SSER ' S SSER ' S ZIMMER 1 08/23/82 08/23/82C.
DES ' S DE5 ' S NONE BYRON 142 11/05/81 11/05/81C CATAWBA 142 08/05/82 08/11/82C CLINTON 1 82 12/13/81 12/28/81C MIDLAND 1 8 2 02/05/62 02/05/82C PALO VERDE 1,2,3 10/26/81 10/26/81C PERRY 1 82 02/26/82 02/26/82C SEAER00K 182 05/14/82 05/14/82C ST LUCIE 2 10/16/81 10/16/81C WOLF CREEK 1 01/05/82 01/05/82C FES
'S FES 'S NOME BYROM 182 04/05/82 04/05/82C CALLAWAY 1 01/29/82 01/29/82C CLINTON 182 05/20/82 05/20/82C GRAND GULF 1 82 10/09/8tC MIDLAND 1 82 07/30/82 07/30/82C PALO VERDE 1,2,3 03/11/82 03/11/82C PERRY 1 82 08/13/82 08/13/82C ST LUCIE 2 04/23/82 04/23/82C HASHINGTON NUCLEAR 2 12/31/81 12/31/81C WOLF CREEK 1 06/11/82 06/11/82C
~0L 's ISSUEDu 0L ' s I55UEDu LASALLE 1 08/13/82 08/13/82C SAN ONOFRE 2 09/07/82 09/07/82C SAN ONOFRE 2 09/07/82 09/07/82C SUSQUEHANNA 1 09/00/82 SUSquEHANNA 1 09/00/82 O FULL POWER
CC C
11 2
L 88 8
A
//
/
U 09 4
T 30 0
C
//
/
A 00 5
11 0
D E
E 11 2
T L
88 8
A U
//
/
D D
50 4
E 10 0
O H
//
/
T C
00 5
S 11 0
R A
E Y
S L
A T
C S
N I
F 2
2 E
8 8
1 1
D M
Y T
1D D
E H
I R
R L
KO O
U S
I EF F
C EN N
5 I
A RA A
F CN H
5 L
/
/
S ST T
I P 2 NI I
8 S
E EG S
G S
E E
M 9
N LA A
N N
1 O
R LK K
O S
O 0
N AS S
N N
R E
S S
C 5 1
E S
E E
P C
R S
S D
F C
A E B
M E
F T
P 0 E S
F Y O L
R S A
A U
A T
C M
A M
U S
D E
L U
P D
E C
H 3 C E
S B
M E
T P
E S
D Y
T E
I L
U I
C S
A F
S S
I S
E E
S E
S E
E N
N N
H N
O R
O O
D S
O N
N N
N H
R E
S S
E S
E E
P S
S D
F C
1
5UMMARY 0F ACC0MPLISHMENTS AS OF SEPTEMBER 15, 1982 SEPTEMBER FISCAL YEAR TD__RAIE SCHEDULED ACTUAL 1&ufDulfD ACIMAL 5ER'S( 0L) 0 0
5ER'S( 0L) to 10 SER'SCCP) 0 0
$ER'S( CP) 0 0
SSER'S( 0L) 1 1
SSER'S( 0L) 31 33 SSER'StCP) 0 0
SSER'SCCP) 2 2
. DES'S( 0L) 0 0
DES'S( 0L) 9 9
DES'S( CP) 0 0
DES'S( CP1 1
1 FES'S( 0L) 0 0
FES'S( 0L) 9 10 FES'S( CP) 0 0
FES'S( CP) 0 0
0L'S ISSUEDa 2
1 0L'S ISSUEDM 3
2 CP'S ISSUED 0
0 CP'S ISSUED 0
0 W FULL POWER
I l
l l
LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OFs 09/15/82 (INCLUDES SCHEDULES FOR ADDITIDHAL UNITS WITH PROJECTED CONSTRUCTION COMPLETI0H IN CY 1982-1983)
(LISTED IN ORDER OF FACILITY HAME)
I f-SER SSER EST.
STAFF TECH STAFF TECH ASLB COMMM APPL.
DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
CONST.
PLANT (MONTHS) Eli TO DL 1XR 51G EE1 TO DL liig 0F HRG DECISIDH RAlg COMPL.
l BYROM 1 0
11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 09/82 03/33 07/83 08/83 08/83 CLINT0H 1 0
12/81C 12/81C 02/82C 03/82C 05/82C 06/82C 07/82C 11/82 09/83 12/83 01/84 COMANCHE PEAK 1 0
05/81C 07/81C 07/81C 11/81C 09/81C 10/82 10/82 12/81C 01/83 05/43 06/83 DIABLO CANYON 1 0
12/72C 01/75C 10/74C 07/76C 05/76C 11/82 11/82 12/76C 08/82C DIABLO CANYOH 2 0
12/72C 01/75C 10/74C 07/76C 05/76C 11/82 N/S 12/76C 08/82C ENRICO FERMI 2 0
04/81C 05/77C 09/77C 08/81C 09/81C 09/82 09/82 03/82C 10/82 05/83 06/83 GRAND GULF 1 0
05/81C 08/81C 09/81C 10/81C 10/81C 09/82 09/82 N/A N/A 10/82 06/82C LASALLE 2 0
03/78C 02/81C 03/81C 04/81C 11/78C 10/82 11/82 N/A N/A 03/83 04/83 MCGUIRE 2 0
10/75C 01/78C 03/78C 04/78C 04/76C 12/82 01/83 03/77C 06/81C 03/83 04/83 MIDLAND 1 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 11/83 10/82 07/83 11/83 12/83 MIDLAND 2 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82 10/82 07/83 08/83 07/83 i
PALO VERDE 1 0
10/81C 10/81C 11/81C 12/81C 03/82C 08/82C 09/82 04/82C 10/82 07/83 08/83 PERRY t 0
02/82C 05/82C 05/82C 07/82C 08/82C 07/82C 09/82 03/83 08/83 10/83 11/83 GAN ONOFRE 2 0
01/81C 01/81C 02/81C 02/81C 04/81C 08/82C 09/82C 06/81C 05/82C 08/82C 02/82C SAH ONOFRE 3 0
01/81C 01/81C 02/81C 02/81C 04/81C 08/82C 10/82 06/81C 05/82C 11/82 11/82 SHOREHAM 6
03/77C 03/81C 09/81C 10/81C 10/77C M/S 11/82 05/82C 05/83 06/83 09/82 ST LUCIE 2 0
10/81C 09/81C 10/81C 11/81C 04/82C 08/82C 09/82 N/A N/A 10/82 10/82 SUMMER 1 0
06/79C 12/80C 02/81C 03/81C 05/81C 07/82C 08/82C 06/81C 08/82C 10/82 08/82C SUSQUEHANNA 1 0
03/81C 03/81C 04/81C 08/81C 07/81C 07/82C 07/82C 10/81C 04/82C 09/82 07/82C SUSQUEHAHfiA 2 0
03/81C 03/81C 04/81C 08/81C 07/81C 07/82C 03/83 10/81C 04/82C 12/83 01/84 WASHINGTON NUCLEAR 2 0
07/81C 05/82C 03/82C 10/82 12/81C 10/82 11/82 N/A N/A 08/83 09/83 WATERFORD 3 0
05/81C 05/81C 07/81C 08/81C 09/81C 09/82 10/82 03/82C 10/82 04/83 05/83 WATTS BAR 1 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 09/82 N/A N/A 07/83 08/83 ZIMMER 1 0
10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C 06/82C 11/82 12/82 l
RLICENSING SCHEDULES AND DECISIDH DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGEHCY PREPAREDHESS REVIEW.
i 1
i
LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1983 ISSUE APPL. CONST.
PLANT 11ER COMPLETE BELLEFONTE 1 09/84 05/85 BELLEFONTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 04/86 BYRON 2 N/S 04/84 CALLAWAY 1 01/82C 04/84 CATAWBA 1 04/83 11/84 CATAWBA 2 N/S 03/87 CLINTON 2 N/S CDMANCHE PEAK 2 11/83 12/84 GRAND GULF 2 N/S N/S HARRIS 1 01/84 12/84 HARRIS 2 N/S 06/88 LIMERICK 1 10/83 10/84 LIMERICK 2 N/S PALO VERDE 2 10/83 08/84 PALO VERDE 3 N/S 11/85 PERRY 2 N/S 05/87 RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SEABROOK 1 12/82 05/84 SEABROOK 2 02/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 WASHINGTON NUCLEAR 1 N/S N/S WASHINGTON NUCLEAR 3 06/84 12/85 WATTS BAR 2 06/84 08/84 WOLF CREEK 1 08/82C 10/84
LICENSIN3 SCHEDULES FOR ALL PENDIN3 CP APPLICATIONS REPORT AS OF 09/15/82 (LISTED IN ORDER OF FACILITY NAME)
SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE IMPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
PLANT RE1 TO DL 1ER
[1LQ fil TO DL 1118 0F HRG DECISION R8J1 -
07/74C 08/75C 09/75C 04/76C 10/75C 03/76C 09/81C 06/76C 06/82C 09/82 ALLENS CREEK 1 07/74C 11/74C 11/74C 12/74C 11/74C 03/75C 10/81C 03/75C N/S N/S CLINCH RIVER 02/76C 01/83 03/83 05/83 02/77C 06/83 07/83 08/82C 05/84 06/84 PEBBLE SPRINGS 1 & 2 01/75C 12/75C 01/76C 02/76C 04/75C 12/77C N/S N/S N/S N/S SKAGIT/NANFORD 142 05/82C 07/77C 08/77C 01/83 12/82 10/82 11/82 07/75C 04/83 07/83 1
l NEW APPLICATION F 0 R E C A 5 T --- 0 P E R A T I N G LICENSE REVIEW 5 (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)
AS OF WEEK ENDING: 09/15/82 l
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ = - _ _ _ _.._
_ _ _ _ = = _ _ _ _ _ _
i LICENSING APPL.
APPL.
1ST UNIT DOCKET PROJECT SUBMITS SUBMITS CONST.
FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL FY82 WASHINGTON NUCLEAR 3 050-00508 WASHINGTON PUBLIC POWER SUPPLY
.UHASSIGNED 06/02/82C 06/00/82C 12/00/85 D.SWANSON l
__=___
==._
=___ =__===___=__
__=_ - - ___
FY83 MILLSTONE 3 050-00423 NORTHEAST NUCLEAR ENERGY J. GRANT 11/00/82 12/09/82 12/00/85 M.ROTNSCHILD MARBLE HILL 1&2 054680547 PUBLIC SERVICE OF INDIANA E.DOOLITTLE 12/00/82 12/00/82 06/08/86 R.LESSY BEAVER VALLEY 2 050-00412 DUQUESHE LIGHT E.DOOLITTLE 12/31/82 12/31/82 12/31/85 J.GUTEIRREZ NINE MILE POINT 2 050-00410 NIAGARA MOHAWK POWER D. LYNCH 01/00/83 01/00/83 03/00/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 8 GAS
. UNASSIGNED 03/00/83 03/00/83 06/08/86 R. BLACK V0GTLE 1 82 0424-0425 GEORGIA POWER J. GRANT 09/08/83 09/00/83 09/00/86 8.50RDENICK
___________._______.____.______ ___==__________________._______.________.______._______.___.________.___________________________
FY86l NORTH ANNA 3 050 _00404 VIRGINIA ELECTRIC & POWER
, UNASSIGNED 04/09/86 04/00/86 04/08/89 M.WILC0VER l
-=---___-_=__._______..__________.___ _ ________.______
- = = _ _ = - - - - _ ______________ _== _____=-____
=_
NEW APPLICATION F 0 R E C A S T -- C 0 N S T R U C T I O N PERMITS AS OF WEEK ENDING: 09/15/82
...___===____._________==- _=-
_ _.____...===__-________..___________._-
===__- __-_-_-_________.___.__
l HAME FACILITY PROJECT PROJECT APPL. ER APPL. PSARl UTILITY NUMBER MANAGER SUB. DATE 50
______...._____._______._________________.__________8. DATE I
_ __________...______.__ ______ _____._______ =-
l CARROLL 1 8 2 COMMONWEALTH EDISON 559 J. WILSON 10/00/84 10/06/84 l
_==.______.== --_ _ _=______.______.____..________________...______
I
---m
C0MM0N ABBREVIATIOHS USED WITHIH THE PUBLICA'TIOH i
ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:
LICENSING ASSISTANT AE ARCHITECT / ENGINEER LESRs LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)
AEB:
ACCIDEN1 EVALUATION BRANCH LGR LICENSING GUIDANCE BRANCH ASB AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR l
ASLB ATOMIC SAFETY LICENSING BOARD LQB LICENSEE QUALIFICATIONS BRANCH B8R BURNS 8 ROE MEB MECHANICAL ENGINEERING BRANCH B8V BLACK 8 VEACH MPA:
MANAGEMENT AND PRGGRAM ANALYSIS 58W BABCOCK 8 WILCOX MTEB MATERIALS ENGINEERING BRANCH BECH: BECHTEL MEW MEGAWATTS ELECTRIC BRRT: BROWN 8 ROOT MWT MEGAWATTS THERMAL BWR BOILING WATER REACTOR HSSS: NUCLEAR STEAM SYSTEMS SUPPLIER CES:
CHEMICAL ENGINEERING BRANCH OL:
OPERATING LICENSE COMB COMBUSTIDH ENGINEERING OLB OPERATOR LICENSING BRANCH CP:
CONSTRUCTION PERMIT OPS:
OFFSHORE POWER SYSTEMS CPB:
CORE PERFORMANCE BRANCH CSB CONTAINMENT SYSTEMS BRANCH CWE:
COMMONWEALTH EDISON PDA PRELIMINARY DESIGN APPROVAL PG8E8 PACIFIC GAS 8 ELECTRIC DES:
DRAFT ENVIRONMENTAL STATEMENT PID:
PARTIAL INITIAL DECISI0H PM:
PROJECT MANAGER PS:
POWER SYSTEMS BRANCH EEB ENVIRONMENTAL ENGINEERING BRANCH PSAR PRELIMINARY SAFETY ANALYSIS REPORT EPA ENVIRONMENTAL PROTECTION AGENCY PTRBs PROCEDURES AND TEST REVIEW BRANCH EPLB EMERGEHCY PREPAREDNESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR ER:
ENVIRONMENTAL REPORT EQB:
EQUIPMENT QUALIFICATION BRANCH ESRs EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH ETSB EFFLUENT TREATMENT 3YSTEMS BRANCH RABI RADIOLOGICAL A%SESSt1ENT BRANCH F.R.:
FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH FDA FINAL DESIGH APPROVAL FES:
FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT
$8La SARGENT 8 LUNDY 58W:
STONE 8 WEBSTER SAB:
SITING ANALYSIS BRANCH G8H GIBBS 8 HILL SAR:
SAFETY ANALYSIS REPORT GHDRs GIBBS 8 HILL SDA STANDARD DESIGN APPROVAL GIL:
GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB:
GEOSCIENCES BRANCH SER:
SAFETY EVALUATIDH REPORT SIB SYSTEMS INTERACTION BRANCH SP SPECIAL PROJECT HGB HYDROLOGIC AND GEOTECHNICAL BRANCH SSC:
SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION TVA TENNESSEE VALLEY AUTHORITY ICB INSTRUMENTATIDH AND CONTROL BRANCH UEC UNITED ENG.'8 CONSTRUCTORS UFB UTILITY FINANCE BRANCH WEST: WESTINGHOUSE
y.
Y
)
3 2
i i
w w
Z O
w O
W to I
s i
I i,
PR0 JECT INDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 BELLEFONTE 1 82 2-34 ALLENS CREEK 1 2-38 (80P)BOPSSAR/BSAR-205 2-48 (SP)FNP 1-8 (MANUF.)
l 2-2 BRAIDWOOD 1 & 2 2-35 CLINCH RIVER 2-39 (BOP)ESSAR/BSAR-205 2-49 CARROLL SITE 2-3 BYROM 182 2-36 PEBBLE SPRINGS 182 2-40 (BOP)ESSAR/CESSAR-80 2-4 CALLAWAY 1 2-37 SKAGIT/NANFORD 182 2-41 (80P)ESSAR/RESAR-414 2-5 CATAWBA 1 82 2-42 (BOP)GAISSAR 2-6 CLINTON 1 82 2-43 (BOP)GIBBS$AR (W) 2-7 COMANCHE PEAK 1 82 2-44 (BOP)$NESSAR/BSAR-205 2-8 DIABLO-CANYON 182 2-45 (NSS)CESSAR SYSTEM 80 2-9 ENRICD FERMI 2 2-46 (NSS)GESSAR SEVERE ACC 2-10 FERMI 2 (FSAR RESUB) 2-47 (NSS)GESSAR-238 NI 2-11 GRAND GULF 1 82 2-12 NARRIS 1 8 2 2-13 LASALLE 2 2-14 LIMERICK 182 2-15 MCGUIRE 2 2-16 MIDLAND 1 82 2-17 PALO VERDE 1,2,3 2-18 PERRY 1 82 2-19 RIVER BEND 1 & 2 2-20 SAN ONOFRE 2 8 3 2-21 SEABROOK 1 82 2-22 SHORENAM 2-23 SOUTH TEXAS 1 82 2-24 ST LUCIE 2 2-25 SUMMER 1 2-26 SUSQUEHANNA 182 2-27 WASHINGTON NUCLEAR 1 2-28 WASHINGTON NUCLEAR 2 2-29 WASHINGTON NUCLEAR 3 2-30 WATERFORD 3 2-31 WATTS BAR 1 82 2-32 WOLF CREEK 1 2-33 ZIMMER 1
.~
--.~-
.=
e-psy -
NRR LICEMSING SYSTEM PAGE NO: 2' 1
BELLEFONTE 1 8 2 OL CURRENT STATUS R-E P 0 R T REPORT AS OF8 09/15/82 PLANT
'C H A R A C T E R I 5 T I C St KEY PERS0NNEL DOCKET NO:
043880439 LIC. PM8 D. SCALETTI ASLB CHAIR - N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEttBER 1 N/A I
LOCATION:
6 MI ME OF SCOTTSBORD. ALA LIC. LA.:
M. DUNCAN-MEMBER 2:
N/A
' REGION:
2 AE:
TVA COUNSEL:
B. PATON CONST. INSP R. CRLENJAX REAC. TYPE: PWR NSSS: B8W ANTITRUSTt J. RUTBERG RESID. INSP J. WILCOX i
DESIGN PWR*
3760 MWT/1235 MWE CONST: TVA Rf1 ANALYST M. KING l
CURRENT SAF. STATUS
- ENVIRONMENTAL MILESTONES 8 SCHED. DATE ACTUAL DATE-As a result of appilcant's construction delay, the ER DOCKETED:
06/12/78 06/12/78C review schedule has been delayed. The appileant has announced a delay in loading fuel to 05/85.
The ER SITE VISIT COMPLETE:
02/20/82 06/17/82C r
staf f is currently evaluating the impacts of this INPUT To DES TO PM 10/31/82 delay on the safety review schedule.
ISSUE DES:
01/t5/83 RESPONSE TO COMMENTS ON DES:
05/22/83 ISSUE FES:
06/20/83 4
-CURRENT ENV. STATUS As a result of applicant's construction delay, the review schedule was delayed..and is being re-evaluated.
SAFETY / HEARING MILESTONES:
The environmental site visit was completed on 6/17/82.
APPLICATION TENDERED:
02/03/78 02/03/78C SAR DOCKETED 06/12/78C SAR Q'S RECEIVED BY PM:
07/03/80 04/02/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/28/83 CURRENT HR'G. STATUS:
INPUT TO DRAFT SER TO PM 05/15/83 No hearing is anticipated.
ISSUE DRAFT SER*
INPUT TO SER:
03/15/84 ISSUE SER*
05/15/84 ACRS FULL COMMITTEE MEETING:
07/08/84 INPUTS TO SE SUPPLEMENT tt 07/29/84 ISSUE SE SUPPLEMENT 13 09/15/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Pending determination HEARING STARTED N/A ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
03/00/85 I'
COMMISSIDH DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND 05/00/85 SCHED. DATE RECEIPT DATE NEW SLIP'/ NOTES:
On 07/06/82 TVA revised fuel load date to 5/85. Staff is CONSTRUCTION COMPLETION - APPL.:
05/00/85 07/06/82 evaluating impact on safety and environmental review
- i schedules, j
NRR LICEN$ING SYSTEM PAGE NO: 2-2 BRAIDWOOD 1 & 2 0L CURRENT STATUS REP 0RT REPORT AS OF 09/15/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E Le DOCKET NO:
045680457 LIC. PM:
K. KIPER ASLB CHAIR. M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:
24 MI SSW OF JOLIET, ILL LIC. LA.:
M. PUSNBROOK MEMBER 2 D. CALLINAM REGION:
3 AE:
58L COUNSEL:
D. HASSELL CONST. INSP J. NEISLER REAC. TYPE: PWR HSSS WEST ANTITRUST B. V0GLER RESID. INSP L. MCGREGOR DESIGN PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Several portions are under contract review.
ER DOCKETED:
11/30/78C ER SITE VISIT COMPLETE:
04/15/83 INPUT TO DES TO PM:
11/01/83 ISSUE DES:
01/00/84 RESPONSE TO CCMMENTS ON DES:
04/01/84 ISSUE FES:
06/00/84 CURRENT ENV. STATUS:
Inactive.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:
12/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/01/83 There will be a contested hearing.
ISSUE DRAFT SER:
09/20/83 INPUT TO SER:
11/01/83 ISSUE SER:
12/01/83 ACRS FULL COMMITTEE MEETING:
01/00/84 INPUTS TO SE SUPPLEMENT 1 04/01/84 ISSUE SE SUPPLEMENT 1 05/00/C4 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Applicant has submitted antitrust information pursuant to NEARING STARTED:
10/00/84 Reg. Guide 9.3.
ASLB INITIAL DECISION:
03/00/85 ASLB FINAL DECISION:
04/00/85 TECH $PECS COMPLETED:
09/00/84 CCMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 FSAR Amendmer.t No. 33 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
C4/00/85 04/14/82
NRR LICEN5ING SYSTEM PAGE NO: 2-3 BYROH 1 82 0L CURRENT STATUS REPORT REPCRT AS OF 09/15/82
]
PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
045480455 LIC. PM:
S. CHESNUT ASLB CHAIR:
M. MARGULIES APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1:
R. COLE LOCATION:
17 MI SW OF ROCKFORD, ILL LIC. LA.:
M. RUSHBROOK MEMBER 2:
D. CALLIHAN l
REGION:
3 AE:
S8L COUNSEL:
S. GOLDBERG CONST. INSP M. RING REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. NOGLER RESID. INSPs.W. FORNEY DESIGh FWR: 3425 MWT/1120 MWE CONST: CWE RM ANALYST:
M.
KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCNED. DATE ACTUAL DATE SER and Supplement 1 have been i ssued.
Several outstanding and confirmatory issues remain to be ER DOCKETED:
11/30/78C resolved prior to licensing.
ER SITE VISIT COMPLETE:
05/31/81 05/31/81C l
INPUT TO DES TO PM:
08/15/81 08/15/81C ISSUE Dest 11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:
03/01/82 03/01/82C ISSUE FES:
04/05/82 04/05/82C CURRENT ENV. STATUS:
Environmental review completed and FES (NUREG-0848) pubilshed in April 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:
08/15/81 08/15/81C SAR APPL. RESPONSE TD Q'S RECEIVED: 10/15/81 10/15/81C CURRENT HRG. STATUS:
INPUT TO CRAFT SER TO PM:
11/07/81 11/07/81C In discovery. Hearing scheduled to commence in ISSUE DRAFT SER:
INFUT TO SER:
01/07/82 01/07/82C 1
tiarch 1983.
ISSUE SER:
02/07/82 02/07/82C l
ACRS LETTER RECEIVED:
03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 28 08/20/82 08/20/82C ISSUE SE SUFPLEMENT 2:
09/18/82 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Applicant has submitted antitrust information pursuant HEARING STARTED:
03/00/83 to Reg. Guide 9.3.
ASLB INITIAL DECISION:
07/00/83 ASLB FINAL DECISION
- 08/00/83 3
TECH SPECS COMPLETED:
06/30/83 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/00/83 FSAR - Amendment 38 SCHED. DATE RECEIPT DATE ER - Amendment 3 NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/31/83 07/14/82 l
a w
v--
vr M
e-
NRR LICEN5ING SYSTEM PAGE HU 2-4 CALLAWAY I OL CURRENT STATUS REP 0RT REPORT AS OF 09/15/82 PLANT C H A R A C T E R I S T I C S:
KEY PERSONNELa DOCKET NO:
05000483 LIC. PM:
G. EDISON ASLB CHAIR:
J. GLEASON APPLICANT:
UNION ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G. BRIGHT LOCATION:
10 MI SE OF FULTON, M0 LIC. LA.:
M. RUSNBROOK MEMBER 22 J. KLINE REGION:
3 AE BECH COUNSEL:
R. LES$Y CONST. INSP: J. KONKLIN REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP: J. NEISLER DESIGN PWR 3425 MWT/1188 MWE CONST: DANIEL RM ANALYST:
S. NEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80. The SER was issued by NRC on 10/07/81 and the SER Supplement No. I was issued on ER DOCKETED:
12/12/80 12/12/80C 01/15/82.
ER SITE VISIT COMPLETE:
12/00/81 12/00/8tC INPUT TO DES TO PM:
08/01/81 08/01/81C ISSUE DES:
09/29/81 09/29/8tc RESPONSE TO COMMENTS ON DES:
12/01/81 12/01/81C ISSUE FES:
01/29/82 01/29/82C CURRENT ENV. STATUS:
ER was docketed 12/12/80. The DES was issued by NRC on 09/29/81 and the FES was issued en 01/29/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/25/79 10/25/79C SAR DOCKETED:
08/05/80 03/08/80C SAR Q'S RECEIVED BY PM:
12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Hearings were held on limited issues during November 1981 ISSUE DRAFT SER:
N/A The hearing on the one remaining contention, emergency INPUT TO SER:
09/11/81 0 9/11/81C preparedness, is expected to be delayed from the current ISSUE SER:
10/07/81 10/07/8tC scheduled date of October 12, 1982.
A prehearing is scheduled for September 8-9, 1982 to set a new schedule.
ACRS LETTER RECEIVED:
11/19/81 11/19/81C INPUTS TO SE SUPPLEMENT 18 01/01/82 01/01/82C ISSUE SE SUPPLEMENT 18 01/15/82 01/15/82C FEMA LETTER RECEIVED:
10/31/82 CURRENT ANTITRUST:
OL review is in progress.
HEARING STARTED:
11/17/81 tt/17/81C ASLB INITIAL DECISION:
10/00/83 ASLB FINAL DECISION:
11/00/83 TECH SPECS CCMPLETED:
N/S COMt1ISSION DECISION:
03/00/84 ISSUE LIC. WITN POWER RESTRICTION: 04/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/00/84 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
The Caseload Forecast Panel will visit the site to revise CONSTRUCTION COMPLETION - APPL.:
04/00/84 08/23/82 the construction completion schedule. An April 1984 estimate is based on the applicant's recently revised fuel load date.
v-e m,,
m
m 4
HRR L~I C E N S I N G SY$ TEM PAGE NG: 2-5 CATAWBA 1 8 2 0L CURRENT STATUS REPORT REPORT AS oft. 09/15/82 l
PLANT. C H A R A C T E R I S T I C 58 kev P E R S 0 N N E L:
DOCKET NO:
041380414 LIC. PM:
K.
JAPEOUR ASLB CNAIR:
J. KELLEY
. APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAN met 1EER 1:
D. CALLIHAN LOCATION:
6 MI.HHW OF ROCK HILL, SC LIC.
LA.+
M.
DUt:CAN MEi1BER 2:
R.
FOSTER 4
REGION:
2 AE:
DUKE COUNSEL:
G. J 0'W SO N CONST. INSP P. VANC00RN REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: K. VAN DOORN i
DESIGN PWR 3582 MWT/1145 MWE CONST: DUKE Rf1 ANALYST:
L. f.ANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER is scheduled to be completed 02/06/83.
l ER DOCKETED:
06/11/81 0 6/11/81C ER SITE VISIT COMPLETE:
10/15/81 10/15/81C l
INPUT TO DES TO PM:
06/25/82 07/29/82C ISSUE DES:
OS/05/82 08/11/82C RESPONSE TO COMMENTS ON DES
- 11/01/82 ISSUE FES:
01/05/83 CURRENT ENV. STATUS:
DES was.lssued on 08/11/82.
SAFETY / HEARING MILI. STONES:
APPLICATION TENDERED:
04/07/81 04/07/81C SAR DOCKETED:
06/11/81 06/11/81C SAR Q'S RECEIVED BY FM:
12/15/81 12/15/81C SAR APPL. RESPONSE 10 Q'S RECEIVED: 09/30/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
09/30/82 Combined hearing anticipated'to start C9/83.
ISSUE PCAFT SER:
INPUT TO SER:
01/09/83 ISSUE SER:
02/06/83 ACRS FULL CCMMITTEE MEETING:
03/10/83 INPUTS TO SE SurPLEt1ENT 12 04/12/83 ISSUE SE SurPLEMLNT 1:
04/30/83 FEMA LETTER RECEIVED:
03/30/83 CURRENT ANTITRUST:
NEARING STARTED:
09/23/83 Complete.
ASLB INITIAL DECISION:
03/00/84 ASLB FINAL DECISION:
04s$0/84 TECH SPECS COMPLETED:
CCt"11SSION DECISIDH:
4.9/0'0/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE A!1END:
11/00/84 i
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CP Amend. issued 12/23/80 indicating change in ownership.
CONSTRUCTION COMPLETION - APPL.:
11/00/84 05/00/82 Staff is reassessing standard assumptions for projecting hearing schedules for plants with const. completion dates bevond '82.
This re-assess. may result in a new sebcdule.
.. - ~.
NRR LICEN$ING SY$ TEN PAGE.NO: 2-6 CLINTON 1 82 0L CURRENT S.T A T U S REP 0RT-REPORT AS OF 09/15/82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO '
046180462 LIC. PM:
H. WILLIAMS ASLB CHAIR:
H. CLARK-APPLICANT:
ILLINDIS POWER LIC. BC:
C.
THOMAS MEMBER 1 G. FERGUSON LOCATION:
6 MI E OF CLINTON..ILL LIC. LA.:
P.
ANDERSON MEMBER 2:
D. PARIS REGION:
3 AE:
S8L COUNSEL:
R. GODDARD CONST. INSP:
F. JABLONSKI^
REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP: N. LIVERMORE DESIGN FWR: 2894 MUT/0950 MWE CONST: BALDWIN RM ANALYST:
M.
KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED..DATE ACTUAL DATE FSAR was docketed 09/08/80. SER was issued 02/17/82.
Supplement No. 1 was, issued 07/22/82.
ER DOCKETED:
03/01/81 09/08/80C ER SITE VISIT-COMPLETE:
INPUT TO DES TO PM:
12/08/81
-12/08/81C ISSUE DES:
12/18/81 12/28/81C r
RESPONSE TO COMMENTS ON DES:
02/22/82 03/25/82C ISSUE FES:
05/20/82 05/20/82C CURRENT ENV. STATUS:
The draft environmental statement was completed December
,1981 The FES was completed May 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/01/79 12/01/79C SAR DDCKETED:
09/08/80 09/08/80C S,*,R Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
-CURRENT HRG. STATUS:
INPUT TO CRAFT SER TO PM:
Two petitions for 1 cave to intervene were filed.
The ISSUE DRAFT SER:
State of Illinois filed under 10 CFR 2.715(c).
INPUT TO SER:
12/05/81 12/05/81C A prehearing was held on 04/14/81.
A second ISSUE SER:
01/05/82 02/17/82C prehearing was held 05/04/82.
ACRS LETTER RECEIVED:
02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 1:
06/30/82 06/30/82C.
ISSUE SE SUPPLEMENT 12 06/30/82 07/22/82C l CURRENT ANTITRUST:
FEMA LETTER RECEIVED:
N/S Operatinq license antitrust review completed HEARING STARTED:
11/00/82 March 18, 1982 (SECY-82-120).
ASLB INITIAL DECISION:
09/00/83 ASLB FINAL DECISION:
10/00/83 TECH SPECS COMPLETED:
CCC11SSION DECISICH:
12/00/83 ISSUE LIC. WITH POUER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/00/84 FSAR Anendment 817, 07/82.
SCHED. DATE RECEIPT DATE NEM SLIPS / NOTES:
4 IPC announced fuel load date of 1/34 by letter dated CONSTRUCTION COMPLETION - APPL.
01/00/84 04/21/82 04/21/82. 'Stop work orders' associated with construction QA nay impact fuel load date.
4e.,,
,g
V k
w
--rte
NRR LICEN57NG SYSTEM PAGE NO: 2-7 CD:MNCHE PEAK 1 82 0L CURRENT STATUS REPORT REPORT AS OF 09/15/82 PLANT.CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
044510446 LIC, PM:
S. BURUELL ASLB CHAIR:
M. MILLER APPLICANT:
TEXAS UTILITIES GENERATING LIC. BC:
B.
YOJNGBLOOD MEMBER 1=
R. COLE-LCCATION:
4 MI N OF GLEN ROSE, TEX LIC. LA.:
M. RUSNBROOK MEMBER 2 K. MCCOLLOM REGION:
4 AE2 GtH COUNSEL:
M. ROTHSCHILD CONST. INSP R. TAYLOR REAC. TYPE: FWT NSSS: UEST ANTITRUST:
B. V0GLER RESID, INSP D. KELLY DESIGN FUR: 3411 MWT/1150 MUE CONST: BRRT Rf1 ANALYST
- M.
ANDERSON ENVIRONMENTAL MILESTONES:
-SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
The SER was issued 07/14/81 The staff deferred scheduling the Comanche Peak revicts by the ACRS untti sufficient ER DOCKETED:
91/19/79 01/19/790 information was providad to resolve a large number of open ER SITE VISIT COMPLETE:
06/20/80 08/07/80C issues. SSER 81 was issued 10/16/81 Application was INPUT TO DES TO PM:
01/15/80 04/27/8tC revieard by the ACRS on 11/13/81 SSER 82 responding to ISSL'E DES:
04/30/81 05/22/8tc the ACRS uas issued on 01/20/82. SSER 83 is scheduled RESP 3NSE TO COMMENTS ON DES:
07/19/81 08/28/8tc ISSU2 FES:
09/18/81 09/24/81C to be issued 10/15/82.
CURRENT ENV STATUS:
The DES was issued on 05/02/81 The EPA Federal Register Notice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:
ended 07/13/81. The FES was issued on 09/24/81.
APPLICATION TENDERED:
03/01/78 03/01/78C SAR D3CKETED:
05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:
12/30/78 C2/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C INPUT TO DRAFT SER Tb PM:
04/13/79 03/11/81C
' CURRENT PRG. STATUS:
The first hearing session was held 12/02/81 in Fort Worth.
ISSUE DRAFT SERE 03/31/81 03/31/81C INPUT TO SER:
05/22/38 07/08/81C Issues board were financial qualifications and the operating QA program.
A second and third hearino session ISSUE SER:
07/14/81 07/14/8tc QA/CC during construction were held 06/07-11/82 and 07/26-30/82.
A fourth hearing session is scheduled to be ACRS LETTER RECEIVEDs 11/17/81 11/17/81C on held 09/13-17/82 on QA/QC during construction. The fifth INPUTS TO SE SUPPLEMENT 3 10/07/82 4
hearing session is expected to complete the remaininq ISSUE SE SUPPLEf1ENT 33 10/15/82 contention, cmergoney plans, and is unscheduled.
FEMA LETTER RECEIVED:
10/01/82 CURRENT ANTITRUST:
ALJ acpointed on 02/23/82 to replace ASLB. Prehearing i
HEARING STARTED:
12/02/81 12/02/81C conference hold 04/13/82 to deternine status of parties.
ASL8 INITIAL DECISION:
01/00/83 C
Briefs filed 05/04/82 request irmediate imposition of ASLB FINAL DECISION:
02/05/83 settlement licenso cenditions. A Memorandum and Order TECH SPECS COMPLETED:
05/00/83 COFf1ISSION DECISION:
05/00/d3 approving settlement agreements 8 proposed license conditions 8 di smi ssing proceedings was i ssued 05/06/82.
ISSUE LIC. WITN POWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:
06/00/83 t
LATEST AMENDMENT:
34 SCHED. DATE RECEIPT DATE SSER #3 has been delayed two weeks by the applicant to CONSTRUCTION COMPLETION - APPL.:
06.*00/83 10/29/81 l
NEW SLIPS / NOTES:
supply additional information in the Emergency Plan.
The delay will not irpact the hearing schedule.
NRR LtCENSING.
S.Y S T E M PAGE NO: 2-8 DIABLO-CANYON 1 8 2 0L CURRENT 5TATUS REPORT REPORT AS OF: 09/15/82 PLANT CNARACTERI5TI *St KEY PERS0NNEL DOCKET NO:
027580323-LIC. PM:
B. BUCKLEY ASLB CHAIR:
J. WOLF APPLICANT:
PACIFIC GAS 8 ELECTRIC LIC. BC:
F. MIRAGLIA MEMBER 18 J. KLINE LOCATION:
12 MI WSW 0F SAN LUIS OBI 5PO LIC. LA.:
J. LEE MEMBER 2:
G. BRIGHT REGION:
5 AE:
PG8E COUNSEL:
F. JONES CONST. INSP D. KIRSCH REAC. TYPE: PWR MSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP: J. CARLSON DESIGN PWR 3338 MWT/1084 MWE CONST PG8E RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER 15 (Equip. Qualification) was issued on 10-02-81 SSER 16 (Emergency Prep.) is estimated for 11/29/82 ER DOCKETED:
11/09/71 11/09/71C (indicated as SSER9 on schedule). Favorable ASLB ER SITE VISIT COMPLETE:
Initial Decision on a full-power license was issued INPUT TO DES TO PM:
10/09/72 10/09/72C on August 31, 1982.
Low Power license was issued on ISSUE DES:
12/12/72 12/12/72C 09-22-81 and suspended on November 19, 1981 RESPONSE TO COMMENTS ON DES:
04/27/73 04/27/73C ISSUE FES:
09/15/75 05/28/76C CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILLTTONES:
APPLICATION TENDERED:
07/10/73 07/10/73C SAR DOCKETED:
10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:
01/04/74 01/04/74C SAR APPL. RESPONSE TO Q'S RECEIVEDa 11/01/74 11/01/74C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/24/75 01/24/75C LP hearings were held 05-19-81 through 05-22-81 A
ISSUE DRAFT SER:
favorable PID on low power operation was issued July IMPUT TO SER:
01/24/75 01/24/75C 17, 1981.
A full power hearing was completed on January ISSUE SER:
10/04/74 10/16/74C 26, 1982.
In August an Initial Decision was issued authorizing issuance of a full power operating license.
ACRS LETTER RECEIVED:
05/00/73 07/18/78C INPUTS TO SE SUPPLEMENT 9:
11/22/82 ISSUE SE SUPPLEMENT 9:
11/29/82 FEMA LETTER RECEIVED:
11/15/82 CURRENT ANTITRUST:
Not required HEARING STARTED:
10/29/75 12/07/76C ASLB INITIAL DECISION:
08/31/82 08/31/82C ASLB FINAL DECISIDH:
09/00/82 TECH SPECS COMPLETED:
09/15/81 0 9/15/81C COMMISSION DECISION:
ISSUE LIC. MITH POWER RESTRICTION: 09/22/81 09/22/31C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S NEW SLIPS / NOTES:
Est. of dates from end of LP hro to lic. complete CONSTRUCTION COMPLETION - APPL.:
dependent upon dev./ approval of State and local Emergency Plans. Ongoing Design Verif. Program likely to identify nlant modifications.
Const. completion docendent on mods.
~ e' NR*
L'I C E N S I N G SY$ TEM:
PAGE N0s.2. 9 ENRICd' FERMI 2 0L CURRENT STATUS REPQRT REPORT AS OF 09/15/82 PLANT
.C II A' R A C T E R I $ T I C 5:
K E.Y PERSONNELe DOCKET N0s, 05000341 LIC. PM '
L. KINTNER
'ASLB CHAIR G. MILLHOLLIN MIMEER 1:
P. MORRIS
. APPLICANT
- DETROIT EDISON LIC. PCs J. YOUNGELOOD ~
MEM3ER 2:
D. SCHINK-j
~ LOCATION:
LAGUNA BEACM, MICN' LIC. LA.:
M. RUSHDROOK REGION:
3 AE SIL COUNSEL
- C. UDODHEAD CONST. INSPs P. PELKE i
REAC. TYPE: BWR NSSS: GE ANTITRUST:
A.
HODGDON RESID, INSP B. LITTLE f
. DESIGN PWR 3292 MWT/1093 MWE.
CONST DANIEL RM ANALYST S. HEDLUND ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS -
An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81.
(See second page for milestone ER DOCKETEDs.
04/04/75 04/04/75C summary.) $$ER No. I was issued 09-25-81 SSER No. 2 was ER SITE VISIT CCMPLETEs~
09/27/73 10/31/75C-I ssued. 01-29-82 wi th 7 prelict ising issues outstanding.
INPUT TO DES To rn:
07/31/81 04/24/8tC-SSER Mo. 3 is scheduled for tsuuance on 09-30-82.
ISSUE DES:
05/01/81 04/30/8tc RESPONSE TO COMMENTS ON DES:
07/31/81 06/29/81C ISSUE FES:
08/31/81 09/04/81C CURRENT ENV. STATUS:
Addendum No. I to the FES was issued 03-03-82.
3' SAFETY / HEARING MILESTONES:
4 APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
04/05/75 04/35/75C SAR Q'S RECEIVED BY PM:
06/13/75 03/tt/75C 4
SAR APPL. RESPCNSE TO Q'S RECEIVED: 08/29/75 01/12/76C CURRENT NRG. STATUS:
INPUT TO CRAFT SER TO PM:
10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE CRAFT SER:
04-02-82.
The two contentions wares (1) QA/QC during INPUT TO SER:
03/05/76 05/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:
03/08/77 09/29/77C the local community. Proposed findings completed by by applicant and staff. Monroe County, Michigan ACRS LETTER RECEIVED:
08/20/88 08/ft/81C petitioned for leave to reopen hearings on the IldPUTS TO SE SUPPLEMENT 38 09/t5/82 evacuation issue.
ISSUE SE SUPPLEMENT 38 09/30/82 FEMA LETTER RECEIVED:
0S/01/83 CURRENT ANTITRUST:
HEARING STARTED:
12/02/81 03/31/82C An ASLB decision on antitrust matters was issued on 04-25-78.
ASLB INITIAL DECISION:
80/03/82 ASLB FINAL DECISION:
11/00/82 TECH SPECS CCMPLETED:
04/01/83 COMMISSION DECISION:
05/01/83 ISSUE LIC. WITH PCWER RESTRICTIO%8 N/A LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/01/83 The latest final Safety Analysis Report Amendment is number 43.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
i Issuance of SE Supplement 3 slipped 1 month due to later CONSTRUCTION COMPLETION - APPL.!
06/01/83 03/29/82 responses from applicant and later SE input.
There is no impact on OL issuance.
l
0 NRR LICEN5ING
$YSTEM PAGE NO: 2-10 FERMI 2 (FSAR RESUB).
OL CURRENT
$TATUS REP 0RT REPORT AS OF 89/15/82, P.L A N T C H A'R A C T E R I S T I C St KEY PERS0NNELa DOCKET NO:
00007341 APPLICANT:
DETROIT EDISON.
LIC. PMt L. KINTNER ASLB CHAIR G. MILLHOLLIN LIC. EC:
J. YOUNGBLOOD MEMBER 1:
P. MORRIS LOCATION:
LAGUNA' BEACH, MICH LIC. LA.:
M.
RUSHBROOK MEMBER 2 D. SCHINK REGION:
3 AE StL COUNSEL:
C. WOODHEAD CONST. INSP P. PELKE
'REAC. TYPE: BWR NS$$: GE ANTITRUST A. HODGDON RESID. INSP: B. LITTLE DESIGN PWR: 3292 MWT/1093 MWE CONST DANIEL RM ANALYST:
- 5. HEDLUND CURRENT SAF. STATUS:
SCHED. DATE ACTUAL DATE All informaticn on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81 Summary of later milestones is on previous page.
CL*RRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/22/74 10/22/74C SAR COCKETED:
06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:
07/01/78 08/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/*CC CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
09/08/78 03/27/8i t ISSUE DRAFT SER:
INrUT TO SER 06/10/81 06/23/8tc ISSUE SER:
06/30/81 07/10/8tC CURRENT ANTITRUST:
LATEST' AMENDMENT:
NEW SLIPS / NOTES:
All information on this page reflects the FSAR resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI nause.
NRR LICEH$ING SYSTEM PAGE NO: 2-11 GRAND GULF l&2 LIC CURRENT STATUS REP 0RT REPORT AS OF 09/15/82' PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 H H E L:
DOCKET NO:
041680417 LIC. PM:
D. HOUSTON ASLB CHAIR: N/A APPLICANT:
MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:
A.
SCHWENCER MEMBER 1:-
N/A LOCATION:
25 MI S OF VICKSBURG, MISS LIC. LA.:
E. HYLTON MEMBER 2:
N/A REGION:
2 AE:
BECH COUNSEL:
M. WAGNER CONST. INSP: R. VANDORN REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP A. WAGNER DESIGN PWR: 3833 MWT/1250 MWE CONST: BECH RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRON: rNTAL MILESTONES:
SCHED. DATE ACTUAL DATE.
SER was issued on September 10, 1981.
An initial ACRS meeting was held Oct. 15, 1981.
SSERs were issued in ER DOCKETED:
06/05/78 06/30/78C December 1981 and in June and July 1982.
A second ACR$
ER SITE VISIT COMPLETE:
12/14/79C meeting was held on August 12, 1982 on Hydrogen. HCU INPUT TO DES TO PM:
04/30/81
'04/30/81C floor loads, and management staffing and capability.
ISSUE DES:
05/3t/8f 05/31/8fC The ACRS report on full power operation was issued RESPONSE TO COMMENTS ON DES:
08/15/81 08/15/81C August 18, 1982.
ISSUE FES:
09/15/81 10/09/81C CURRENT ENV. STATUS:
DES was issued in May 1981.
FES was issued October 9, 1981.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/28/78 04/28/78C SAR DCCKETED:
06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:
04/24/79C SAR AFPL. RESPONSE TD Q'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S No hearing is scheduled.
ISSUE DRAFT SER:
09/18/81C INPUT TO SER:
04/01/81 08/14/81C ISSUE SER:
06/00/81 09/10/81C ACRS LETTER RECEIVED:
07/00/81 08/18/82C INPUTS TO SE SUPPLEMENT 4:
09/20/82 ISSUE SE SUPPLEMENT 4:
09/30/82 FEMA LETTER RECEIVED:
09/25/82 CURRENT ANTITRUST:
OL review is in progress.
No significant chances have HEARING STARTED:
N/A occurred since the CP.
ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
TECH SPECS COMPLETED:
09/01/81 06/16/82C COMMISSION DECISION:
10/00/82 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C LATEST-AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
09/30/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
An operating license for Unit 1 authorizing feel load CONSTRUCTION COMPLETION - APPL.:
06/16/82C and up to 5% power operation was issued 06/16/82.
m NRR L I C E N S'I N G SYSTEM' PAGE NO: 2-12 HARRIS 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF: 09/15/82' P L A N T' CHARACTERI$ TIC 5:
KEY PERS0NNELa DOCKET NO:
0400-0401 LIC. PM:
E. LICITRA ASLB CHAIR ' 'J.
KELLEY APPLICANT:
CAROLINA POWER 8 LIGHT LIC. BC:
F. MIRAGLIA MEMBER 1:
G.
BRIGHT LOCATION:
20 MI SW OF RALEIGH, NC
.LIC. LA.:
J. LEE MEMBER 28 J. CARPENTER REGION:
2 AE EBASCO COUNSEL:
C. BARTH CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST J..RUTBERG RESID. INSP G. MAXWELL DESIGN PWR 2775 MWT/0915 MWE CONST DANIEL RM ANALYST:
M. ANDERSON CURRENT SAF.. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE F3AR was docketed on 12/22/81. Review has started.
Questions were sent to the applicant between 4/26/82 ER DOCKETED:
12/22/81 12/22/81C and 7/30/82. Most of applicant's responses were ER SITE VISIT COMPLETE:
04/08/82 04/08/82C received by 08/31/82.
INPUT TO DES TC PM:
09/15/82 ISSUE DES:
10/25/82 RESPONSE TO COMMENTS ON DES:
02/08/83 ISSUE FES:
03/31/83 CURRENT ENV. STATUS:
ER was docketed on 12/22/81. The site visit was complete on 04/08/82 and questions were sent to applicant on SAFETY / HEARING MILESTONES:
-04/28/82.
Most of the applicant's responses were received by August 17.-1982.
APPLICATION TENDERED:
06/26/80
~06/26/80C SAR DOCKETED:
12/22/81 12/22/81C SAR Q'S RECEIVED'BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/1S'82 Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:
12/01a62 Federal Register on January 27, 1982.
Several petitions INPUT TO SER:
06/01/83 were filed. Prehearing conference on petitions was held ISSUE SER:
07/08/83 on July 13-14, 1982.
ACRS F.ULL COMMITTEE MEETING:
08/11/83 INPUTS TO SE SUPPLEMENT 1:
12/01/83 ISSUE SE SUPPLEMENT 1:
01/09/84 FEMA LETTER RECEIVED:
04/00/84 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
06/01/84 ASLB INITIAL DECISION:
11/01/84 ASLB FINAL DECISION:
11/00/84 TECH SPECS COMPLETED:
11/01/84 COMf1ISSION DECISION: -
11/00/84 ISSUE LIC. WITH POWER RESTRICTIDH 12/01/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/01/84 FSAR Ho. 4 ER No. 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
12/01/84 04/14/82 A
v l
~
v
-p y-
NRR LICENSING SYSTEM PAGE NO 13 LASALLE 2 0L CURRENT STATUS REPORT REPORT AS OF: 09/15/82 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:
05000374 LIC. PM:
A.
BOURNIA ASLB CHAIR:
M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC. BC:
A.
SCHWEBCER MEMBER 18 F. SHON LOCATION:
11 MI SE OF OTTAWA, ILL LIC. LA.:
E. HYLTON MEMBER 28
- 0. PARIS REGIGHz 3
AE:
58L COUNSEL:
C. WO1DHEAD CONST. INSP H. WESCOTT REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP: W. GULDEMOND DESIGN PWR 3293 MWT/1078 MWE CONST: CWE RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981 SSER-2 was issued in February 1982.
SSER-3 was issued on April 16, 1982..
ER DOCKETED:
01/17/77 05/12/77C SSER-A was issued on July 14, 1982.
A low power ER SITE VISIT COMPLETE:
license to permit fuel load and low power testing was INPUT TO DES TO PM:
02/17/78 02/17/78C issued on April 17, 1982 for Unit 1.
A full-Power ISSUE DES:
03/22/78 03/29/78C License was issued on August 13, 1982 for Unit 1.
RESPONSE TO COMMENTS ON DES:
07/14/78 07/14/78C ISSUE FES:
09/22/78 11/03/78C CU5 RENT ENV. STATUS:
E..vironmental Protection Plan has been issued with Unit I license.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/01/76 09/01/76C SAR DOCKETED:
04/08/77 05/12/77C SAR Q'S RECEIVED BY PM:
07/22/77 07/27/77C SAR APPL. RESPONSE TO
','S RECEIVED: 12/15/77 08/18/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/06/78 11/08/78C No hearing.
ISSUE DRAFT SER:
INPUT TO SER:
12/29/78 02/27/81C ISSUE SER:
09/05/80 03/05/81C ACRS LETTER RECEIVED:
04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 5:
10/00/82 ISSUE SE SUPPLEMENT 5:
11/00/82 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Complete.
HEARING STARTED:
N/A r
ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
04/12/82 04/12/82C COMMISSION DECISION:
03/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:
ISSUE FULL F7WER LICENSE AMEND:
04/00/83 SCHED. DATE RECEIPT DATE NEW SLIPSrNOTES:
Lasalle Unit I criticality was achieved on June 21, 1982.
CONSTRUCTION COMPLETION - APPL.:
04/00/83 07/10/82 A
NRR LICENSING SYSTEM PAGE NO: 2-14 LIMERICK 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 09/15/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
035280353 LIC. PM:
H. ABELSON ASLB CHAIR L. BRENNER APPLICANT:
PHILADELPHIA ELECTRIC LIC. BC:
A.
SCHWENCER MEMBER 1 R. COLE I
LOCATION:
35 MI NW OF PHILADELPHIA, PA LIC.
LA.*
E. HYLTON MEMBER 2:
P. MORRIS REGION:
1 AE:
BECH COUNSEL:
S. LEWIS
'CONST. INSP 1
REAC. TYPE: BWR HSSS: GE ANTITRUST B. V0GLER RESID. INSP S. CHAUDHARY l
DESIGN PWR 3440 MWT/1065 MWE CONST: BECH RM ANALYST:
M.
ANDERSOM l
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAk on March 17, 1981.
SAR was docketed on 07/27/81.
ER DOCKETEO 07/27/81 07/27/81C PRA under review by Brookhaven National Laboratory; ER SITE VISIT COMPLETE:
08/20/82 08/20/82C l
NUREG/CR on PRA scheduled for issuance 11/30/82.
INPUT TO DES TO PM:
03/25/83 I
ISSUE DES:
05/06/83 RESPONSE TO COMMENTL ON DES:
09/06/83 ISSUE FES:
10/31/83 CURRENT ENV. STATUS:
ER was tendered with the FSAR on March 17, 1981 and was docketed on 07/27/81 ER site visit was completed SAFETY / HEARING MILESTONES:
on 8/20/82.
APPLICATION TENDERED:
01/00/81 03/17/81C SAR DOCKETED:
07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 10/07/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/07/83 l
Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:
02/04/83 Federal Register on August 21, 1981.
Pre-hearing INPUT TO SER:
07/01/83 conference held January 6-8, 1982.
A special pre-hearing ISSUE SER:
08/03/83 conference order was issued on June 1,
1982.
Early hearings on three contentions related to Point Pleasant diversion ACRS FULL CGMMITTEE MEETING:
09/08/83 will be held the week of October 4, 1982.
INPUTS TO SE SUPPLEMENT 18 10/07/83 ISSUE SE SUPPLEMENT 1:
10/30/83 FEMA LETTER RECEIVED:
10/07/83 CURRENT ARTITRUST Status to be determi..ed.
HEARING STARTED:
04/00/84 ASLB INITIAL DECISION:
09/00/84 ASLB FINAL DECISION:
10/00/84 TECH SPECS COMPLETED:
N/S.
COMMISSION DECISION:
LD/ 0 0/84 ISSUE LIC. WITH POWER RESTRICTIDH2 10/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICEhSE AMEMD:
N/S Rev. 5, August 31, 1982 (ER OL)
Rev.
9, August 31, 1982 (FSAR)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES CONSTRUCTION COMPLETION - APPL.:
10/00/84 04/27/82
~
NRR LICENSING SY$ TEM PAGE NO: 2-15 MCGUIRE 2 0L CURRENT STATUS REP 0RT REP 0'RT AS OF 09/15/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
05000370 LIC. PM:
R. BIRKEL ASLB CHAIR:
R. LAZO APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1:
X. HAND LOCATION:
17 MI N OF CHARLOTTE, NC LIC. LA.:
M.
DUNCAN MEMBER 2:
E. LUEBKE REGION
- 2 AE DUKE COUNSEL:
J. CUTCHIN CONST. INSP M. NUNT -
REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V00LER RESID. INSP P. BEMIS DESIGN PWR 3411 MWT/1180 t1WE CONST: DUKE RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Input for SSER 6 (SSER for unit 2) is due to DL on 12/01/82, with issuance of the supplement scheduled ER DOCKETED:
05/31/74 05/31/74C for 01/01/83.
ER SITE VISIT COMPLETE:
01/30/75 01/30/75C INPUT TO DES TO PM:
08/29/75 08/29/75C-ISSUE DES:
11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:
ISSUE FES:
05/07/76 04/20/76C CURRENT ENV. STATUS:
Complete.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
04/05/74 04/05/74C SAR DOCKETED:
04/29/75 05/05/75C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
Complete.
INPUT TO SER:
06/01/77 Ot/16/78C ISSUE SER8 02/21/78 03/01/78C ACRS LETTER RECEIVED:
04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6:
12/01/82 ISSUE SE SUPPLEMENT 6:
01/01/83 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
HEARING STARTED:
03/15/77 03/28/77C Complete.
ASLB INITIAL DECISION:
06/00/81
-06/08/81C ASLB FINAL DECISION:
TECH SPECS COMPLETED:
12/01/82 COMMISSION DECISION:
03/01/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/01/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/01/83 05/20/82
NRR LICENSING SYSTEM PAGE NO: 2-16 MIDLAND 1 & 2 0L CURRENT STATUS REP 0RT REPORT AS OF 09/15/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
033080329 LIO. PM:
R.
HERNAN DF00D ASLB CHAIR:
C. BECHHOEFER APPLICANT:
CONSUMERS POWER LIC. BC:
E. ADENSAN MEMBER 18 F. COWAN LOCATION:
SW BOUNDARY OF MIDLAND, MICH.
LIC. LA.:
M.
DUNCAN MEMBER 2:
J.
HARBOUR REGION:
3 AE BECN COUitS EL :
W. PATON CONST. INSP R.
LANDSMAN REAC. TYPE: PWR NSSS: 88W ANTITP.UST B. V0GLER RESID. INSP R. COOK DESIGN PWR: 2452 MWT/0818 MWE CONST: BECH RM ANALYST:
M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other agencies to complete some review areas is currently ER DOCKETED:
04/01/78 04/14/78C in progress. CP extension was issued 12/28/81. ACRS ER SITE VISIT COMPLETE:
09/08/78 09/08/78C Full Committec Meeting was. held 06/04/82.
SSER 81 INPUT TO DES TO PM:
02/03/82 02/03/82C responding to ACRS letter was issued 6/30/82.
SSER 82 ISSUE DES:
02/05/82 02/05/82C is scheduled to be issued 10/04/82.
RESPONSE TO COMMENTS ON DES:
07/08/82 07/08/82C ISSUE FES:
07/30/82 07/30/82C CURRENT ENV. STATUS:
The DES was issued 02/05/82. The FES was issued on July 30, 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/31/77 08/31/77C SAR DOCKETED:
09/30/77 11/18/77C SAR Q'S RECEIVED BY PM:
03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/01/78 12/01/78C Three prehearings ending 04/27-28/81 were held for a ISSUF DRAFT SER:
N/A separate hearing on soils settlement. Hearing on soils INPUT TO SER:
04/23/82 04/23/82C settlement began July 7, 1981 and is continuing.
ISSUE SER:
05/11/82 05/11/82C Discovery phase for OL hearing is in progress.
ACRS LETTER RECEIVED:
06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 28 08/16/82 08/16/82C ISSUE SE SUPPLEMENT 2:
10/04/82 FEhA LETTER RECEIVED:
11/01/82 CURRENT ANTITRUST:
Proceeding completed. License was amended 10/20/80.
HEARING STARTED:
10/00/82 ASLB INITIAL DECISION:
07/00/83 ASLB FINAL DECISION:
08/00/83 TECH SPECS COMPLETED:
10/25/82 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH PCWER RESTRICTION: 07/31/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S 107 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
07/31/83 03/31/82
.C
+
~
use.
.H R R L-I C.E'N S I N G
$ Y $ T'E.M PAGE NO: 2-17 1ALO VFRDE't.2.3 0L C.U R R E N.T STATUS REP 0RT
' REPORT AS.0F 09/15/82 P L AIN T' LC N'A R A'C T E R I $ T I C St KEY P E R S 0 N N E Le 1 DOCKET H0:1 0528-0530:
LIC. PM:
-E.
LICITRA ASLB CHAIR:
R..LAZD
. APPLICANT -
ARIZONA PUBLIC-SERVICE LIC. BC:
F.-MIRAGLIA.
' MEMBER 1 R. COLE LOCATION:
36 MI W OF PHOEMIX, AZ LIC..LA.:
J. LEE MEMBER 2:
- D. CALLINAN-REGION:
.5 AE
- BECH
' COUNSEL:
L. DEWEY CONST.-INSP L. VBRUEGGEN
!REAC. TYPE: -PWR.
MSSS: COMB ANTITRUST:
B. V0GLER-RESID.'INSPs.G. FIORELLI DESIGN PWR 3817 MWT/1304 MWE
.CONST BECH RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL.DATE-The' safety OL review is in progress. -Several " Independent Design Review" meetings have been completed. The SER ER DOCKETED:
07/01/80 06/20/80C.
. was i ssued on November. 11. 1981.
The SER supplement ER SITE VISIT COMPLETE:
-81/30/81 01/30/81C Hos. I and 2 were issued on February 5,-1982 and May*17,
-INPUT TO DES TO PM:
10/05/81 10/05/81C L
'1982, respectively. -SSER-3-is scheduled to be issued on ISSUE DES:
10/26/81
.10/26/81C i
September 24, 1982.
RESPONSE TO COMMENTS ON DES:
02/25/82 02/25/82C ISSUE FES:
03/11/82 03/11/82C a
CURRENT ENV. STATUS:
-The ER-(OL) review is complete. A site visit was completed on January 30. 1981.
The DES was issued on SAFETY / NEARING MILESTONES:
+
October 26,o1981 and the FES was issued on March 11, 10/05/79 10/05/79C i'
1982.
APPLICATION TENDERED:
SAR DOCKETED:
06/20/80 06/20/80C.
SAR 0'S RECEIVED BY PM:
4 SAR APPL. RESPONSE TO Q'S RECEIVED:
5 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
i l
Five contentions were initially admitted. Two contentions ISSUE DRAFT SER:
were dropped by the intervenor and two others were INPUT TO SER:
10/30/81 10/30/81C t
summarily disposed of.by the Board..The remaining ISSUE SER:
t1/11/81 11/11/81C
'5 contention deals with water availability. The hearing started April 27-30, 1982, resumed on May 25-28, 1982 ACRS LETTER RECEIVED:
12/18/81 12/18/81C and again on June 22, 1982. -Hearing record was closed INPUTS TO SE SUPPLEMENT 38 08/02/82 08/02/82C on June 25. 1982.
Findings by all parties have been filed.
ISSUE SE SUPPLEMENT 32 09/24/82 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Antitrust OL review is'in progress.
NEARING STARTED:
04/27/82
'04/27/82C ASLB INITIAL DECISION:
10/30/82 ASLB FINAL DECISION:
11/00/82
) -
TECH SPECS COMPLETED.
08/01/83 COMMISSION DECISI0H 07/00/83-i ISSUE LIC. WITH POWER RESTRICTION: 08/01/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/20/83 l
FSAR Amendment No. 9 i
ER Supplement No. 4 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/00/83 07/13/82 l-
'l b
I
HRR L ICEN$ING SYSTEM PAGE NO: 2-18 PERRY 1 82 0L CURRENT 5TATUS REPORT REPORT AS OF 09/15/82 PLANT CHARACTERI$TICSt KEY P E R S 0 N N'E L DOCKET NO:
044080441 LIC. PM:
J. STEFANJ ASLB CHAIR:
P. BLOCH-APPLICANT:
CLEVELAND ELECTRIC ILLUMINATING LIC. BC:
A.
SCHWENCER MEMBER is J. KLINE LOCATION:
7 MI NE OF PAINESVILLE, OHIO LIC. LA.:
E. HYLTON MEMBER 28-F. SHON REGION:
3 AE:
GIL COUNSEL:
B. V0GLER CONST. INSP: P.
PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER-RESID. INSP: M. GILDNER DESIGN PWR: 3759 MWT/1205 MWE CONST: GIL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.
The ACRS Report was issued on July 16, 1982.
SSER No. 1 ER DOCKETED
- 06/26/81 06/19/81C
-was issued on August 9, 1982.
SSER No. 2 to be issued ER SITE VISIT COMPLETE:
prior to start of ASLB hearings.
INPUT TO DES TO PM:
01/01/82 01/01/82C ISSUE DES:
02/26/82 02/26/82C RESPONSE TO COMMENTS ON DES:
06/30/82 06/30/82C ISSUE FES:
08/13/82 08/13/82C CURRENT ENV. STATUS:
Environmental acceptance review was completed on June 9,
1981 The ER was docketed June 19, 1981 FES SAFETY / HEARING MILESTONES:
issued on August 13, 1982.
APPLICATION TENDERED:
06/26/80 06/26/80L SAR DOCKETED:
01/09/81 01/30/81C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
02/24/82 02/24/82C A prehearing conference was held June 2-3, 1981 in ISSUE DRAFT SER:
02/26/82 02/26/82C Painesville Ohio.
By Board Orders eleven contentions INPUT TO SER:
04/10/82 05/10/82C were admitted as hearing issues. Two have since been ISSUE SER:
05/10/82 05/24/82C dismissed by the Board.
ACRS LETTER RECEIVED:
07/16/82 07/16/82C INPUTS TO SE SUPPLEf1ENT 28 07/16/82 07/16/82C ISSUE SE SUPPLEMENT 28 09/30/82 FEf1A LETTER RECEIVED:
12/00/82 CURRENT ANTITRUST:
CP antitrust review has been completed. OL antitrust HEARING STARTED:
03/00/83 status is under review.
ASLB INITIAL DECISI0H:
08/00/83 ASLB FINAL DECISI0H:
09/00/83 TECH SPECS C0ftPLETED:
06/00/83 COMf11SSION DECISION:
10/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENrMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/83 Humber 8 (8-25-82).
SCHED. DATE RECEIPT DATE HEU SLIPS / NOTES:
Start of hearing may slip to January or February 1983.
CONSTRUCTION COMPLETION - APPL.#
11/00/83 02/22/82 FEMA Ichter may slip to April 1983 due to incomplete offsi'te plans.
NRR-L7 CENSING SVSTEM PAGE NO: 2-19 RIVER BEND 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF 09/15/82 PLANT CHARACT ERIST I C S:
KEY PERS0NNELa DOCKET NO:
045880459 LIC. PM:
UNASSIGNED ASLB CHAIR:
B. COTTER APPLICANT:
GULF STATES UTILITIES LIC. PC:
A.
SCHWENCER MEMBER 1:
F. RErlICK LOCAIION:
24 til NNW OF B ATON ROUGE, L A LIC. LA.:
E. HYLTON MEMBER 2 R. COLE REGION:
4 AE:
58W COUNSEL:
L.
DEWEY CONST. INSP:
UNASSIGNED REAC. TYPE: EWR NSSS: GE ANTIIRUST:
B. V0GLER RESID. INSP R. BROWN DESIGN PUR: 3015 F1WT/0934 MWE CONST: 58W RM ANALYST:
M.. KING s
CURRENT SAF. STATUS:
ENVIRONMENTAL MIL ESTONES:
SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81.
FSAR uas docketed on 08/25/81. Draft SER targeted for ER DOCKETED:
08/25/81 08/25/81C 03/83.
ER SITE VISIT COMPLETE:
01/22/82 01/22/82C INPUT TO DES TO FM:
12/09/83 ISSUE DES:
01/09/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
06/08/84 CURRENT ENV. STATUS:
Applicant tendered ER for docketing on 04/24/81 ER was docketed on 08/25/81. DES targeted for 01/09/84.
S AFETY/ HEARING MILESTONE'P APPLICATION TENDERED:
04/24/81 04/24/81C SAR DOCKEIED:
08/25/81 08/25/81C.
SAR Q'S RECEIVED P/ PM:
12/07/81 12/16/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM 03/04/83 Notice of Opportunity for Hearing was published in the ISSUE CRAFT SER:
03/00/83 Federal Register on 09/04/81. Prehearing conference INPUT TO SER:
11/04/83 scheduled for 02/08/83.
ISSUE SER:
12/02/83 ACRS FULL COMMITTEE MEETING:
01/13/84-INPUTS TO SE SUPPLEMENT 1:
04/00/24 ISSUE SE SUPPLEMENT.18 05/00/84 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
10/00/84 ASLB INITIAL DECISION:
03/00/85 ASLB FINAL DECISION:
04/00/85 TECH SPECS CCt1PLETED:
COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85.
Number 4.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
NRR/0L revised the priority of the review on this case due CONSTRUCTION COMPLETION - APPL.:
04/00/85 04/15/82 to 18-month slip in construction schedule.
NRR L ICEN$ING SY$ TEM PAGE NO: 2-20 SAN ONOFRE 2 & 3 LIC CURRENT STATUS REP 0RT REPORT AS OF 09/15/82 PLANT CNARACTERI5 TICS KEY PERS0NNELa DOCKET NO:
036180362 LIC. PM:
H. ROOD ASLB CHAIR J. KELLEY APPLICANT:
SOUTHERN CALIFORNIA EDISON LIC. BC:
F. MIRAGLIA MEMBER 18 C. HAND LCCATION:
5 MI S OF SAN CLEMENTE, CA LIC. LA.:
J. LEE MEMBER 2:
E. JOHNSON REGION:
5 AE BECH COUNSEL:
L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP A.
CHAFFEE DESIGN PWR 3410 MWT/1100 MWE CONST: BECH RM ANALYST:
M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER on geological and-seismological matters was issued on 12/31/80.
ACRS subcommittee meetings were held 01/30/81 and ER DOCKETED:
03/01/77 03/23/77C 03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETE:
05/20/77 05/20/77C 03/12/81.
SER (Non-1MI matters), was issued on 02/06/81.
INPUT TO DES TO PM:
10/01/77 12/01/80C SER supplement on TMI issues was issued on 02/25/81 SER ISSUE DES
- 01/27/78 Ot/20/8tC supplement No. 2, 3, 4, 5, and 6 addressing open items were RESPONSE TO COMMENTS ON DES:
04/06/81 04/06/81C issued 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.
ISSUE FES:
04/00/81 04/29/81C ASLB PID was rendered on 01/11/82.
ASLB initial decision was issued on 05/14/82.
Low power OL issued 02/16/82; full power OL amendment issued 09/07/82.
CURRENT ENV. STATUS:
DES addressing class 9 accidents was issued 01-20-81, FES was issued 04-29-81 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/29/76 11/29/76C SAR DOCKETED:
03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:
08/15/77 09/29/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
02/10/78 08/11/78C Motions for summary disposition were granted by ASLB.
ISSUE DRAFT SER:
01/15/81 01/15/81C Hearing started 06/22/81 and ended 09/31/81.
.A INPUT TO SER:
06/23/78 01/15/8tC i
decision on low power operation was issued on 01/11/82.
ISSUE SER:
08/01/80 02/06/81C i
An ASLB initial decision on full power operation was issued on 05/14/82.
ACRS LETTER RECEIVED:
03/17/81 03/17/81C INPUTS TO SE SUPPLEMENT 7 08/30/82 08/30/82C ISSUE SE SUPPLEMENT 7:
09/07/82 09/07/82C CURRENT ANTITRUST:
The Staff is reviewing the OL antitrust information.
NEARING STARTED:
06/22/81 06/22/81C ASLB INITIAL DECISION:
05/14/82 05/14/82C ASLB FINAL DECISION:
07/00/82 07/00/82C TECH SPECS COMPLETED:
02/16/82 02/16/82C COMMISSION DECISION:
08/17/82 03/17/82C ISSUE LIC. WITH POWER RESTRICTION: 02/16/82 02/16/82C LATEST AMENDMENT:
ISSUE-FULL PCWER LICENSE AMEND:
09/07/82 09/07/82C SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
02/16/82C
~
NRR LICENSING SYSTEM PAGE NO: 2-21 SEABROOK 1 8'2 0L CURRENT STA1US REPORT REPORT AS OF: 09/15/82 P L A H T' CHARACTERISTICS KEY PERSONNEL DOCKET NO:
044380444 LIC. PM:
L. WHEELER
.ASLB CHAIR:
H. H0YT APPLICANT:
PUBLIC SERVICE OF HEW HAMPSHIRE LIC. BC:
F. MIRAGLIA MEMBER 1:
E. LUEBKE LOCATION" 10 MI S OF PORTSMOUTH, NH LIC. LA.:
J.
LEE NETIBER 2:
J. HARBOUR REGION
- 1 AE:
UEC COUNSEL:
R. LESSY CONST. INSP A.
TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP A.
CERNE DESIGN PWR*
3411 MWT/1198 MWE CONST: UEC RM ANALYST:
B. ST NARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in September 1981.
The FSAR was docketed October 5, 1981.
Applicant has ER DOCKETED:
10/05/81 10/05/81C' responded to round 1 Q's.
SER issuance has moved from ER SITE VISIT COMPLETE:
12/02/82 12/02/82C 09/07/82 to 11/08/82. Partial draft SER has been issued.
INPUT TO DES TO PM:
03/01/82 03/01/82C Human Factors and Operator Licensing input is outstanding.
ISSUE DES:
05/14/82-05/14/82C RESPONSE TO COMMENTS ON DES:
09/15/82 ISSUE FES:
10/05/82 CURRENT ENV. STATUS:
ER was tendered June 1981.
ER acceptance review was completed September 1981 The ER was docketed SAFETY / HEARING MILESTONES:
October 5, 1981.
DES was issued May, 1982.
Comments are being evaluated.
APPLICATION TENDERED:
06/29/81 06/29/81C SAR DOCKETED:
10/05/81 10/05/81C SAR Q'S RECEIVED BY PM:
01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S Notice for Opportunity for Hearing was published in ISSUE DRAFT SER8 07/30/82 08/13/82C the Federal Register on October 19, 1981 First prehearing INPUT TO SER:
10/08/82 conference was held May 6-7, 1982.
Second prehearing ISSUE SER*
11/08/82 conference was held July 15-16, 1982.
ACRS F.ULL COMMITTEE MEETING:
17/10/82 INPUTS TO SE SUPPLEMENT 1 12/10/82 ISSUE SE SUPPLEMENT 1:
12/30/82 FEMA LETTER RECEIVED:
12/20/82 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
06/00/83 ASLB INITIAL DECISION:
04/00/84 ASLB FINAL DECISION:
05/00/84 TECH SPECS COMPLETED:
COMMISSION DECISION:
05/00/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/00/84 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Applicant critical path construction progress is behind CONSTRUCTION COMPLETION - APPL.:
05/31/84 06/2" :2 schedule. Licensing schedule has been expanded six months.
NRR LICENSING SYSTEM PAGE N0: 2-22 SHOREHAM 0L CURRENT STATUS REPORT REPORT AS OF 09/15/82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000322 LIC. PM:
R. GILBFRT ASLB CHAIR L. BRENHER APPLICANT:
LONG ISLAND LIGHTING CO.
LIC. BC:
A.
SCHWENCER MEMBER 1:
P. MORRIS LOCATION:
BROOKHAVEN NY (LI)
LIC. LA.:
E. HYLTCH MEMBER 28 J. CARPENTER REGIGH:
1 AE:
S8W COUNSEL:
B. BORDENICK CONST. INSP L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST J. RUTBERG RESID. INSP J. HIGGINS DESIGN PWR 2436 MWT/0854 MWE CONST S8W RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981 SER Supplement 2 was issued in March 1982.
An additional ER DOCKETED:
01/26/76
-01/26/76C SER Supplement is scheduled for Nov. 1982 or earlier ER SITE VISIT COMPLETE:
08/06/76 08/03/76C to address resolution of outstanding matters.
INPUT TO DES TO PM:
11/22/76 11/29/76C ISSUE DES:
03/11/77 03/24/77C RESPONSE TO COMMENTS ON DES:
07/22/77 07/22/77C ISSUE FES:
10/21/77 10/18/77C CURRENT ENV. STATUS:
The environmental review is complete.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/00/75 09/04/75C SAR DOCKETED:
12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:
06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/15/77 08/01/77C Hearing sessions were held for August 24-27, 1982.
ISSUE DRAFT SER INPUT TO SER:
03/10/81 03/10/81C ISSUE SER:
04/10/81 04/10/81C ACRS LETTER RECEIVED:
09/18/81 10/19/81C INPUTS TO SE SUPPLEMENT 3:
N/S ISSUE SE SUPPLEMENT 3:
11/15/82 FEMA LETTER RECEIVED:
10/01/82 CURRENT ANTITRUST:
Not required.
HEARING STARTED:
05/04/82 05/04/82C ASLB INITIAL DECISION:
05/00/83 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COM11SSION DECISION:
06/00/83 ISSUE LIC. WITH POWER RESTRICTf0N: 02/00/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND.
05/00/83 FSAR Amendment 26 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
The current estimate for a partial initial ASLB decision CONSTRUCTION COMPLETION - APPL.:
09/20/82 04/30/82 on all matters except offsite emergency planning is the end of February, 1983.
A complete initial decision may not be available orior to Mav. 1983.
j
NRR L ICEHSING SYS7EM PAGE NO: 2-23 SOUTH TEXAS 1 82 0L CURRENT STATU$
.REPOR T REPORT AS OF2.09/15/82 PLANT-CHARACTER IST I C S:
KEY PERS0NNELa DOCKET NO:
049880499 LIC. PM:
D. SELLS ASLB CHAIR C. BECHHOEFER APPLICANT:
HOUSTON LIGHTING 8 POWER COMPANY LIC. BC:
F. MIRAGLIA MEMBER 18 J. LAMB LOCATION:
12 MI SSW OF BAY CITY. TEX LIC. LA.:
J. LEE MEMBER 2 E. HILL REGION:
4 AE BECH COUNSEL:
J. GUTIERREZ CONST. INSP REAC. TYPE: FWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP W. HILL DESIGN PWR: 3800 MWT/1250 MWE CONST: EBASCO RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Limited work being performed due to higher priorities.
BRRT has been replaced by Bechtel as the A/E.
BRRT ER DOCKETED:
07/17/78C has been replaced by Ebasco as the constructor.
ER SITE VISIT COMPLETE:
09/26/78 09/26/78C Non-safety related construction restarted on June 15. 1932.
INPUT TO DES TO PM:
08/00/85 Safety related construction restarted on August 15, 1982.
ISSUE DES:
09/00/85 Current FLD is 12/86.
Milestones now reflect a 12/86 FLD.
RESPONSE TO COMMENTS ON DES:
01/00/86 ISSUE FES:
02/00/86 CURRENT ENV. STATUS:
Schedule revised to reflect new 12/86 FLD.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
05/10/78 05/10/78C SAR DOCKETED:
07/17/78C 01/22/79 02/08/82C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG STATUS:
INPUT TO DRAFT SER TO PM:
03/00/85 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:
03/00/85 expedited hearing on QA programs and management was INPUT TO SER:
11/00/85 hold.
Thn record of this phase of the hearing ISSUE SER:
12/00/85 was closed on June 17. 1982. Phase II of hearing will consider all aspects of Quadrox Report.
ACRS FULL COMMITTEE MEETING:
01/00/86 Phase II is expected to begin in late '82 or early '83.
INPUTS TO SE SUPPLEMENT 18 01/00/86 ISSUE SE SUPPLEMENT 18 01/00/86 FEMA LETTER RECEIVED:
N/S CURPENT ANTITRUST:
ficmo and Order. i ssued May 6, 1982 approving settlements and HEARING STARTED:
06/00/86 proposed _ license conditions and dismissing proceeding.
ASLB INITIAL DECISION:
11/00/86
.ASLB FINAL DECISION:
12/00/86 TECH SPECS C0"PLETED:
01/00/86 CD:?lISSION DECISION:
12/00/86 ISSUE LIC. WITN POWER RESTRICTION:
LATEST AMENCMENT:
ISSUE FULL POWER LICENSE A!1END:
12/09/86 FStR anendment #25 was issued 03/15/82.
ER amend,ent #5 was issued 08/31/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
All schedules now reflect new official FLD of 12/86.
CONSTRUCTION COMPLETION - APPL.:
12/00/86 03/00/82
m NRR LICENSING SY$ TEM PAGE NO: 2-24 ST LUCIE 2 0L CURRENT STA TUS REP 0RT REPORT AS OF: 09/15/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
05000389 LIC. PM:
V. HERSES ASLB CHAIR E. BOWERS APPLICANT:
FLORIDA POWER 8 LIGHT LIC. BC:
F. MIRAGLIA MEf1B ER 1:
P. fl0RRIS LOCATION:
12 MI SE OF FT. PIERCE FLA LIC.
LA.'
J. LEE MEf1 DER 28 0.
PARIS REGION:
2 AE:
EBASCO COUNSEL:
W. PATTON CONST. INSP R. WRIGHT REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP: S.
ELROD DESIGN PWR 2700 MWT/0842 MWE CONST: EBASCO RM ANALYST:
M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l
Status of Q-1 and Q-2 review i s complete.
The SER was issued on 10/09/81. SE Supplement No. I was issued ER DOCKETED:
02/17/81C on 12/30/81. SE Supplement No. 2 is scheduled to be ER SITE VISIT COMPLETE:
02/18/81 02/18/81" issued on 09/17/82.
INPUT TO DES TO PM:
08/07/81 03/07/81C ISSUE DES:
10/16/88 10/16/81C l
RESPONSE TO COMMENTS ON DES:
02/08/82 02/08/82C ISSUE FES:
04/23/82 04/23/82C i
CURRENT ENV. STATUS:
The DES was issued on 10/16/81 and the FR Notice was published 10/30/81. The FES was issued on 04/23/82.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/17/8 t C SAR Q'S RECEIVED BY PM:
06/15/81 06/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
08/03/81 08/03/81C There have been no petitioners on matters dealing with ISSUE DRAFT SER:
08/10/81 08/10/81C health, safety and environment.
INPUT TO SER:
09/11/81 09/11/81C ISSUE SER:
10/09/81 10/09/81C ACRS FULL COMMITTEE MEETING:
11/12/81 ft/12/81C INPUTS TO SE SUPPLEMENT 23 08/20/82 08/20/82C ISSUE SE SUPPLEf1ENT 23 09/17/82 FEMA LETTER RECEIVED:
08/20/82 08/20/82C CURRENT ANTITRUST:
Settlement among the Department of Justice, the NRC Staff HEARING STARTED:
N/A and the licensee has been agreed upon.
Case dismissed ASLB INITIAL DECISION:
M/A 3/82 following summary disposition and settlement agreement.
ASLB FINAL DECISION:
N/A TECH SPECS C0ftPLETED:
09/30/82 C0" MISSION DECISION:
10/00/82 ISSUE LIC. WI1H POWER RESTRICTION: N/A LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/31/82 No. 12 (FSAR); No. 5 (ER)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
completion on Unit 2 is being reevaluated as a 10/28/82 03/31/82 Caseload Forecast Panel estimate for construction CONSTRUCTION COMPLETION - APPL.:
result of the June, 1982 site visit.
NRR LICENSING SYSTEM PAGE NO: 2-25 SUMMER l LIC CURRENT STATUS REP 0RT REPORT AS OF 09/15/82
~
PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:
05000395 LIC. PM:
W. KANE ASLB CHAIR:
H. GROSSMAN APPLICANT:
SOUTH CAROLINA ELECTRIC 8 GAS CO.
LIC. BC:
B. YOUNGBLOOD MEM2ER 1:
G.
LINENBERGER LOCATION:
26 MI NW OF COLUMBIA, SC LIC.
LA.-
N.
RUSNBCOOK MEMBER 2:
F. HOOPER REGIDH 2
AE GIL COUNSEL:
S. GOLDBERG CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: J. SK0LDS DESIGN PWR 2785 MWT/0900 MWE CONST: DANIEL RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER Supplement No. 1 was issued 04/28/81.
Supplement No. 2 to the SER was issued on 05/28/81. Supplement No.
ER DOCKETED:
01/21/77 02/24/77C 3'was issued in January 1982.
Supplement No. 4 was ER SITE VISIT COMPLETE:
06/30/78 06/07/73C issued on August 6, 1982.
An operating license with INPUT TO DES TO PM:
09/21/78 OS/29/79C a 5% power restriction was issued on August 6, 1982.
ISSUE DES:
10/30/73 06/22/79C Two amendments have been issued each involving changes RESPCNSE TO COMMENTS ON DES:
07/01/80 07/24/80C to the Technical Specifications.
ISSUE FES:
05/15/81 05/21/81C CURRENT ENV. STATUS:
DES supplement on Class 9 accidents was issued in
' November 1980.
The FES was issued in May, 1981 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
-12/10/76 12/10/76C SAR DOCKETED:
01/21/77 02/24/77C SAR Q'S RECEIVED BY PM:
02/03/78 03/08/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/21/78 09/18/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
06/16/78 02/21/79C The contested hearing began 06/88-and was completed in ISSUE DRAFT SER:
N/A January 1982.
ASLB Partial initial decision on seismic INPUT TO SER:
06/02/80 12/1S/80C issues was issued on July 20, 1982.
The renainder of the ISSUE SER:
08/01/80 02/06/81C decision was issued en August 4, 1982.
The intervenor has requested the ASLB to stay its decision because of
.ACRS LETTER RECEIVED:
03/18/81 03/18/81C cadweld allegations. This matter is under consideration INPUTS TO SE SUPPLEMENT 42 07/14/82 07/14/82C-by the ASLB.
ISSUE SE SUPPLEMENT 4:
07/16/82 08/06/82C FEMA LETTER RECEIVED:
11/13/81 11/13/81C CURRENT ANTITRUST:
The Attorney General sent his advice on significant HEARING STARTED:
06/22/81 06/22/81C changes to the Commission on 10/10/80. The Commission ASLB INITIAL DECISIGN:
07/00/82 08/04/82C on 06/26/81 denied Central Electric Power Coop., Inc.
ASLB FINAL DECISION:
10/00/82 petition for antitrust review.
TECH SPECS COMPLETED:
07/00/82 08/06/82C COMMISSION DECISION:
10/00/82 ISSUE LIC. WITH POWER RESTRICTION: 07/00/82 08/06/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/00/82 Humber 33.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.
08/10/82C
NRR L ICENSING SYSTEM PAGE NO: 2-26
$USQUENANNA 1 82 LIC CURRENT
$TA TUS REPORT REPORT AS'0F: 09/15/82' PLANT CHARACTERISTICS KEY P E R S O N N E La DOCKET NO:
058740388 LIC. PM:
R. PERCH ASLB CHAIR:
J. GLEASON APPLICANT:
PENHSYLVANIA POWER 8 LIGHT LIC. BC:
A.
SCHUENCER MEMBER 1:
G.
BRIGHT LCCATION:
7 MI NE OF BERWICK, PA LIC. LA.:
E. HYLTON MEMBER 2:
P.'PURDOM REGION:
1 AE BECH COUNSEL:
J.
CUTCHIH CONST. INSP:
L.
HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:
A.
H0D000H RESID. INSP: G. RHOADS DESIGN PWR 3440 MWT/1052 MWE CONST: BECH RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued 04/06/81 SSER #1 was issued 07/07/81.
Post ACRS SSER #2 was issued 09/10/81.
SSER #3 was ER DOCKETED:
-10/20/78 10/20/78C 06/10/78C issued 07/17/82. Full power license with a fuel load ER SITE VISIT COMPLETE:
and low power testing restriction was issued on 07/17/82.
INPUT TO DES TO PM:
03/30/81 03/30/81C ISSUE DES:
03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:
05/21/81 05/21/81C ISSUE FES:
06/15/81 07/02/81C CURRENT ENV. STATUS:
DES was issued on 03-30-81 FES was issued 07-02-81.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/05/78 04/10/78C SAR DOCKETED:
07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:
11/17/78 05/15/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DtAFT SER TO PM:
04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:
04-12-82.
INPUT TO SER:
03/23/81 03/23/81C ISSUE SER:
04/06/81 04/06/81C ACRS LETTER RECEIVED:
08/15/81C INPUTS TO SE SUPPLEMENT 35 07/16/82 07/16/82C ISSUE SE SUPPLEt1ENT 3:
07/00/82 07/17/82C FEMA LETTER RECEIVED:
06/00/82 06/00/82C CURRENT ANTITRUST:
Complete.
HEARING STARTED:
10/06/81 10/06/81C ASLB INITIAL DECISION:
04/12/82 04/12/82C ASLB FINAL DECISIGN:
TECH SPECS CCMPLETED:
C0rJ11SSION DECISION:
09/23/82 ISSUE LIC. WITH POWER RESTRICTION: 07/01/82 07/17/82C LATEST AMENDMENT:
ISSUE FULL PCWER LICENSE AMEND:
09/00/82 FSAR:
No. 30; ER:
No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
07/17/82C 05/11/82
NRR L2 CENSING SYSTEN
~PAGE NO: 2-27-.
. WASHINGTON NUCLEAR 1 0L CURRENT STATUS REP 0RT REPORT'AS OF - 09/15/82 PLANT CHARACTERI5TICSt KEY PERS0NNEL:
DOCKET NO:
05000460 LIC. Pfls
. UNASSIGNED ASLB CHAIR:
APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
E.-ADENSAM MEMBER la
. LOCATION:
to til N OF RICHL AND, WA LIC. LA.:
M.
DUNCAN MEf13ER 2:
REGION:
5 AE:
UEC COUNSEL -
M. YOUNG-CONST. INSP::P. NARBUT-REAC. TYPE: PUR NSSS: BRM ANTITRUST:
RESID. JNSP: 'A.
TOTH DESIGN PUR: 3760 MMT/1266 MNE CONST: BECH Rt1 ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE -ACTUAL DATE Application uas tendered on 11-25-81 This schedule is being reconsidered in light of a notice of d3ferral from ER DOCKETED:
07/00/82 07/16/82C the applicant. A review schedule will be established
-ER SITE VISIT COMPLETE:
folicwing construction resumption. Application was INPUT TO DES'TO PM:
docketed on July 16, 1982.
ISSUE DES:
N/S RESPONSE TO COMMENTS ON DES
- ISSUE FES:
N/S CURRENT ENV. STATUS:
DES issuance will be scheduled following resumption of construction.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/25/81 11/25/81C SAR DOCKETED:
07/00/82 07/16/82C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Notice of Opportunity for Hearing was published ISSUE DRAFT SER:
in the Fedoral Rcgister on August 16, 1982.
INPUT TO SER:
ISSUE SER:
N/S ACRS FULL COMMITTEE MEETINJ:
N/$
INPUTS TO SE SUPPLEMENT 1*
ISSUE SE SUPPLEMENT 1:
N/$
FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
HEARING STARTED:
N/S ASLB INITIAL DECISION:
N/S ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COT:!!ISSION LECISION:
ISSUE LIC. WITH PCWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/$
None SCHED. DATE~ RECEIPT DATE NEW SLIPS / NOTES:
Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.'
N/S 05/07/82 on 4/29/82.
. ~ _
NRR LICENSING SYSTEM PAGE N0s.2-28 WASHINGTON NUCLEAR 2 0L CURRENT STATUS REPORT REPORT AS OF: 09/15/82 PLANT CHARACTERI$TICSt KEY PERS0NNELa DOCKET NO:
05000397 LIC. PM:
R. AULUCK ASLB CHAIR E.
BOWERS.
APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEN LIC. BC:
A.
SCHWENCER.
MEMBER 1:
R.
COLE LOCATION:
30 MI HW OF RICHLAND, WASH LIC. LA.:
E. HYLTON MEMBER 2:
E. NILL REGION:
5 AE B8R COUNSEL:
W. FATON CONST. INSP A. TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP R. FEIL DESIGN PWR: 3323 MWT/1103 MWE CONST: BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MIL ESTONES:
SCHED. DATE ACTUAL DATE SER was issued 3/31/82. Geology / Seismology reviews is included in SSER No. 1 issued August 11, 1982.
ACRS ER DOCKETED:
02/28/77 04/20/77C meeting target date is October 1982.
ER SITE VISIT COMPLETE:
07/13/77 07/14/77C INPUT TO DES TO Pf1:
06/30/81 06/30/8tC ISSUE DES:
07/31/81 07/31/81C RESPONSE TO COMMENTS ON DES:
09/28/81 09/23/81C ISSUE FES:
12/31/81 12/31/81C CURRENT ENV. STATUS:
FES was issued 12-31-81 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/30/76 12/30/76C SAR DOCKETED:
04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:
01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/12/81 10/12/81C Not required ISSUE DRAFT SER:
11/17/81 11/17/81C INPUT TO SER:
05/30/82 05/30/82C ISSUE SER:
03/31/82 03/31/82C 2
ACRS FULL COMMITTEE MEETING:
10/07/82 INPUTS TO SE SUPPLE!1ENT 2:
10/22/82 ISSUE SE SUPPLEf1ENT 2 11/22/82 FEt1A LETTER RECEIVED:
05/01/83 CURRENT ANTITRUST:
Not required HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
N/A TECH SPECS C0f*PLETED:
08/30/82 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
09/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.*
09/00/83 05/07/82
'l NRR LICENSING SYSTEM
-PAGE NO: 2. 29-WASHINGTON NUCLEAR 3 0L C U R'R E N T STATUS REPQRT
-REPORT AS OF: 09/15/32 P L.A N T C:N A R A C T E R I S T I C St KEY P E R S 0 N N E L: '
DOCKET NO:
05000508 LIC, PM:
. UNASSIGNED 1 ASLB CHAIR:
R.
LAZO
-APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
F. f1IR AGL I A MEMBER:ts E.'LUEP".E LOCATION:
26 MI W 0F OLYMPIA, WA LIC. LA.:
J.
LEE MEf1BER 2:
D.
SCHINK RECJON:
5
~
'.AE EBASCO COUNSEL:
D. SWANSON CU!;S T. INSP:
D. KIRSCH.
REAC. TYPE:
FWR-NSSS: COMB ANTITRUST:
B..V00LER
'RESID. INSP: W. ALBERT EESIGN PWR: 3800 MWT/1242 MWE CONST: EBASCO Rf1 ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE -ACTUAL DATE.'
Appilcation was tendered on June 2, 1982, and was docketed on 08/27/82.
ER DOCKETED:
08/27/82 08/27/82C ER SITE VISIT C0f PLETE:
INPUT TO DES-TO Fil:
ISSUE DES:
05/00/83 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
10/00/83 CURRENT ENV. STATUS:
1982, and was
' Application was tendered on June 2, docketed on 08/27/82.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
06/02/*2 06/02/82C SAR DOCKETED:
03/27/82
'08/27/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Notice of Opportunity for Hearing is to be published ISSUE DRAFT SER:
in the Federal Register on 09/15/82.
INPUT TO SER:
ISSUE SER:
04/00/84 ACRS FULL COMMITTEE MEETING:
05/00/84 INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLErfENT 18 06/00/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST HEARING STARTED:
't0/00/24 ASLB INITIAL DECISION:
05/00/85 ASLB FINAL DECISION:
TECH SPECS Cer;?LETED:
Cor r1ISSION DECISION:
06/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:-
N/S SCHED. DATE RECEIPT DATE NEW-StIPS/ NOTES:
Schedule will be completed after docketing and management CONSTRUCTION COMPLETION - APPL.:
.12/00/85 03/31/82 approval. Caseload Forecast Panel visited site 8/31/82-9/2/82.
Detailed review is now being developed.
i t
4
NRR LICENSING SYSTEN PAGE N0: 2-30 WATERFORD 3 0L CURRENT STATUS REP 0RT REPORT AS 0F 09/15/82 l
PLANT CNARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000382 LIC. PM:
S. BLACK ASLB CHAIR:
S. WOLFE APPLICANT:
LOUISIANA POWER 8-LIGHT LIC. BC:
F. MIRAGLIA MEMBER 1:
W. JORDAN.
LOCATION:
20 MI W OF NEW ORLEANS, LA LIC.
LA.-
J.
LEE MEMBER 2:
H.
FOREMAN REGION:
4 AE:
EBASCO COUNSEL:
S.-TURK CONST. INSP
. UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B.
V0GLER RESID. INSP: L. CONSTABLE DESIGN PWR 3560 MWT/1151 MWE CONST: EBASCO RM ANALYST:
M.
KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The safety review was expedited. The SER was issued July 9, 1981.
Fuel load dato delayed until 05/83 by ER DOCKETED:
12/00/78 12/00/78C-applicant.
-ER SITE VISIT COMPLETE:
12/05/80 12/05/80C INPUT TO DES TO FM 04/06/81 04/06/81C ISSUE DES:
05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:
07/24/81 08/19/81C ISSUE FES:
09/30/81
- 9/30/81C CURRENT ENV. STATUS:
The DES was completed in May 1981 FES was completed September 1981 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/28/78 09/28/78C SAR DCCKETED:
12/18/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TU Q'S RECEIVED: 08/08/80 12/15/80 C CURRENT NRG. STATUS:
INPUT TO CRAFT SER TO PM:
10/0I/80 05/15/81C Contested bearing started 03/82.
Discovery among the ISSUE DRAFT SER:
parties has been held.
Nearing record closed 5/12/82.
INPUT TO SER:
05/08/d1 05/15/81C ISSUE SER:
07/09/81 07/09/81C ACRS LETTER RECEIVED:
08/08/81 08/08/81C INPUTS TO SE SUPPLEf1ENT 4 09/15/82 ISSUE SE SUPPLEMENT 4:
.10/15/82 fella LETTER RECEIVED:
11/30/82 CURRENT ANTITRUST:
Staff is reviewinq OL Antitrust information.
HEARING STARTED:
03/00/82 03/23/82C ASLB INITIAL DECISION:
10/00/82 ASLB FINAL DECISION:
11/00/82 TECH SPECS CCMPLETED:
02/28/83 COMMISSION DECISION:
04/30/83 ISSUE LIC..WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/00/83 ER #3 - 8/81 FSAR 828 - 7/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.'
05/00/83 08/24/82 emergency plan.
On 08/24/82, LP8L advised FLD slip to 05/83 and commercial operation slip to 01/84.
NRR LICEN5ING SYSTEM PAGE NO: 2-31 WATTS BAR. 1 8 2..
OL C U R R E.N T S T A.T U S REP 0RT REPORT AS OF 09/15/82 P L'A N T C H A R A C T'E R-I S T I C St KEY' PERSONNELa FOCKET.NC:
039080391 LIC. FM T. KENYOH ASLB CHAIR: N/A AFPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. DC:
E. ADENSAM MEMBER 1 N/A LOCATION:
- 10 MI S OF SPRING CITY, TENN LIC. LA.:
M.
DUNCAN MENDER 2 N/A REGION:
2 AE:
TVA COUNSEL:
M. YOUNG CONsT. INSP R. CRLENJAK REAC. TYPE: PWR NSSS: WEST ANTITRUST:
-J.
RUTBERG RESID. INSP T. HEATHERLY DESIGN PWR: 3411 MWT/1165 MWE CONST.TVA Rt1 ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 ccmpletion data at 08/83.
.SER published 07/82.
ACRS subcommittee meetings held ER DOCKETED:
01/05/77 11/23/76C 04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE:
03/18/77 02/25/77C held 08/13/82. ACRS letter received 08/16/82.
INPUT TO DES TO PM:
07/06/77 08/18/77C ISSUE DES:
11/29/77 06/02/78C RESPONSE TO COMMENTS ON DES:
N/A ISSUE FES:
11/24/78 12/29/78C CURRENT ENV. STATUS:
Complete except for environmental tech specs.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/30/76 06/30/76C SAR DOCKETED:
10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:
12/IS/76 05/20/77C SAR APPL. RESPONSE 70 v'S RECEIVED: 03/23/77 02/10/78C CURRENT HRG. STATUS:
, INPUT TO DRAF SER TO PM:
06/18/80 12/18/81C No hearings are assumed.
ISSUE DRAFT SER:
12/30/81 12/30/81C INPUT TO SER:
06/04/82 06/04/82C ISSUE SER:
07/01/82 0 7/ 01/82C ACRS LETTER RECEIVED:
09/00/82 08/16/82C INPUTS TO SE SUPPLEMENT 1:
08/27/82 09/03e82C ISSUE SE SUPPLEMENT 1:
09/17/82 FEMA LETTER RECEIVED:
04/00/83 CURRENT ANTITRUST:
Complete HEARING STAPTED:
N/A ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
11/00/82 COMMISSIDH DECISIDH:
07/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/00/83 FSAR No. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/00/83 04/09/82
MRR L ICENSING SYST EM PAGE NO: 2-32 WOLF CREEK 1 0L CURR NT STATUS REP 0RT REPORT AS OF 09/15/82 PLANT.
CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:
05000482 LIC. PM:
J. NOPKINS ASLB CHAIR:
J. GLEASON APPLICANT:
KANSAS GAS 8 ELECTRIC LIC. EC:
B. YOUNGBLOOD MEMBER 1:
G. ANDERSON LOCATION:
3.5 MI NE OF BURLINGTON, KAN LIC. LA.:
M.
RUSHBROOK MEMBER 2:
H. PAXTON REGION:
4 AE:
BECH COUNSEL:
M.
KARMAN CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: T. VANDEL DESIGN PWR 3425 MWT/1150 MWE CONST: DANIEL RM ANALYST S. HEDLUND CURRENT GAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued in April 1982.
SSER-1 was issued in August 1982.
ER DOCKETED:
11/25/80 11/25/80C ER SITE VISIT COMPLETE:
07/28/81 04/21/81C INPUT TO DES TO PM:
10/01/81 10/01/81C ISSUE DES:
01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:
05/14/82 05/14/82C ISSUE FES:
06/11/82 06/11/82C CURRENT ENV.' STATUS:
The DES was issued in January 1982.
The FES was issued in June 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/21/80 02/21/80C SAR DOCKETED:
08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/12/82 03/12/82C Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
Federal Register on 12/18/80.
Two petitions for INPUT TO SER:
03/19/82 03/19/82C leave to intervene were filed.
A special combined ISSUE SER:
04/07/82 04/07/82C prehearing conference was held on 4/15/81.
ACRS LETTER RECEIVED:
05/11/82 05/11/82C INPUTS TO SE SUPPLEMENT 18 08/10/82 08/10/8 2C ISSUE SE SUPPLEMENT 1:
08/26/32 08/26/82C FEMA LETTER RECEIVED:
04/01/83 CURRENT ANTITRUST:
OL antitrust review is in progress.
HEARING STARTED:
06/00/83 ASLB INITIAL DECISION:
11/00/83 ASLB FINAL DECISION:
12/00/83 l
TECH SPECS COMPLETED:
N/S.
COMMISSION DCCISION:
49/00/84 ISSUE LIC. WITH PCWER RESTRICTION: N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:-
10/00/84 SHUPPS FSAR - No. 95 Wolf Creek Site Addendum - No. 9; ER - No. 3.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
10/00/84 08/24/82
NRR LICENSING SYSTEM PAGE Not.2-33 ZIMMER 1 0L CURRENT STATUS REP 0RT REPORT AS OF: 09/15/82 P L A'N T CNARACTERISTICSt KEY
.P E R S 0 N N E L:
DOCKET NO:
05000358 LIC, PM:
G.
DICK ASLB CHAIR:
J.
FRYE APPLICANT:
CINCINHATI GAS 8 ELECTRIC LIC. DC:
B. YOUNGSLOOD MEMBER 1:
F. HOOPER LOCATION:
24 MI SE OF CINCINNATI, ON LIC.
LA.-
M.
RUSHDROOK MEMEER 28 M.
LIVINGSTON REGION:
3 AE:
SIL COUNSEL:
C.
BAPTH CONST. INSP: D. HUNTER REAC. TYPE: BWR NSSS: GE
- ANTITRUST S. LEWIS RESID. INSP:
F. CHRISTIANSON
- DESIGN PWR 2436 MWT/0810 MWE CONST: KAISER RM ANALYST M.
ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SE Supplement was issued on 06/04/81. SE Supplement #2 was issued 10/81 SE Supplement #3 was issued on 08/23/82.
ER DOCKETED:
09/10/75 09/10/75C ER SITE VISIT COMPLETE:
10/09/75 10/09/75C INPUT TO DES TO PM:
05/20/76 05/19/76C ISSUE DES:
10/15/76 10/15/76C RESPONSE TO COMMENTS ON DES:
03/25/77 04/01/77C ISSUE FES:
06/10/77 06/10/77C CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/15/75 05/09/75C SAR DOCKETED:
09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:
10/29/76 01/06/77C SAR APPL. RESPONSE (0 Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01c28/77 03/11/77C Nearing was completed March 5, 1982.
Board decision was ISSUE CRAFT SER:
N, A rendered in Juno, 1982.
The Board exercised its sua INPUT TO SER:
05/20/77 12/07/77C sponte authority to admit as Board issues night new ISSUE SER:
07/29/77 01/31/79C contentions. The Commission reviewed the action and directed the Board to issue an appropriate order ACRS LETTER RECEIVED:
09/16/77 03/13/79C dismissing the eight contentions. from the proceeding.
INPUTS TO SE SUPPLEMENT 3:
06/17/82 OS/02/82C ISSUE SE SUPPLEMENT 3:
08/23/82 08/23/82C FEMA LETTER RECEIVED:
04/15/82 04/15/82C CURRENT ANTITRUST Antitrust review is now closed. Federal Register Hotice HEARING STARTED:
02/26/82 02/26/82C was published 04/09/82.
ASLB INITIAL DECISIDN 06/2..'82 06/21/82C ASLB FINAL DECISION:
11/20/82 TECN SPECS COMPLETEDs 11/00/82 COMMISSION DECISION:
11/00/82 LATEST AMENDMENT:_
ISSUE LIC. IIITH PCUER RESTRICTION:
ISSUE FULL POWER 8.ICENSE AMEND:
12/00/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Applicant slipped construction completion to 12/82.
CONSTRUCTION COMPLETION - APPL.
12/00/82 04/19/82 Therefore, Zimmer is not impacted. Construction completion date may slip further due to the time required for imolementation of the Quality Confirmation Proaram.
,. - + - - - - -.
~ +
4 :
NRR L I C E'N $-I N G SYSTEM PAGE NO: 2-34
~P L.A N.T C H A R A C T-E R I S T I C St KEY PERS0NNELa t
' DOCKET NO:
05000466 LIC. PM:
C. MOON ASL8 CHAIR:
- 5. WOLFE APPLICANT:
HOUSTON LIGHTING 8 POWER COMPANY LIC. BC:
E. ADENSAM MEMBER in E. CHEATUM LOCATION:
45 MI W OF HOUSTON, TX LIC. LA.:
M.
DUNCAN MEMBER 2 G. LINENBERGER i
REGIONI-4 AE2 EBASCO COUNSEL:
R. BLACK CONST. INSP:
REAC. TYPE: BWR NSSS: GE ANTITRUST:
A.
HDDGDON RESID. INSP*
DESIGN PWR 3758 MMT/1150 MWE CONST EBASCO Rif ANALYST:
B. ST T1ARY.
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER3 on TMI issues, was issued Auoust 6, 1981 The ACRS did not plan to review TMI issues ER DOCKETED:
12/07/73.
12/07/73C for Allens Creek.
SSER4 on non-Till issues including ER SITE VISIT COMPLETE:
03/08/74 03/08/74C emergency planning, financial capability; unresolved safety INPUT TO DES TO PM:
06/07/74 06/07/74C issue; containment,-ultimate heat sink, and fuel designs ISSUE DES:
07/05/74 07/05/74C was-issued October 30, 1981.
On August 26, 1982 HL8P RESPONSE TO COMMENTS ON DES:
09/23/74 10/01/74C.
announced cancellation of Allens Creek.
ISSUE FES:
11/18/74 11/18/74C CURRENT ENV. STATUS:
A draft second FES supplement was issued in Decomber, 1980.
The final second supplement was issued March 13, 1981 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/24/73 08/24/73C SAR DOCKETED:
12/07/73 12/07/73C SAR Q'S RECEIVED BY PM:
03/22/74 03/22/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/03/74 07/03/74C CURRENT HRG. STATUS:
. 05/15/81 ISSUE DRAFT SER:
INPUT TO DRAFT SER TO PM:
08/09/74 09/20/74C Env. hearing commenced 01/12/81 and ended on Safety sessions were held May 18-22 and June 1-12.
INPUT TO SER:
10/11/74 11/01/74C Further. sessions were held on-10/5-9/81, 10/26-30/81, ISSUE SER:
11/07/74 11/15/74C 11/16-20/81, 12/7-11/81, 12/14-16/81 and 04/12-14/82.
3 On 08/26/82.HLtP announced cancellation of Allens Creek.
ACRS LETTER RECEIVED:
12/20/74 12/13/74C On 09/02.'82 the Hearing Board terminated effort on INPUTS TO SE SUPPLEMENT 42 01/10/75 03/28/75C writing an Initial Decision and stated that it awaits ISSUE SE SUPPLEMENT 4:
10/15/81 10/30/81C HL8P's pleading proposing disposition of this case.
CURRENT ANTITRUST:
-A set of proposed license conditions was submitted to.the HEARING STARTED:
03/11/75 03/11/75C Licensinq _ Board in the Scuth Texas antitrust proceeding.
ASLB INITIAL DECISION:
N/S The South Texas antitrust review was completed in May of ASLB FINAL DECISION:
N/A 1982.
License conditions will be attached to the South TECH SPECS COMPLETED:
N/A Texas and Allons Creek licenses upon issuance.
COMMISSION DECISION:
N/S CP ISSUED:
N/S i
LATEST AMENDMENT:
NEM SLIPS /HOTES:
4
-e
,w.~
,m
+
NRR LICENSING SYSTEM PAGE NO 2-35 CLINCH RIVER CP CURRENT STATUS REPQRT REPORT AS OF 09/15/82 PLANT CHARACTERISTIC 5:
KEY PERS0NNEL COCKET NO:
05000537 LIC. PM:
. STARK LEECH ASLB CHAIR:
M. MILLER APPLICANT:
PROJECT MANAGEMENT CORP.; DOE;TVA LIC. BC:
C.
THOMAS MEMBER 1:
G.
LINENBERGER L O C a. T I O N :
25 t1I W OF KNOXVILLE, TN LIP. LA.:
P.
SHUTTLEWORTH MEMBER 2:
C. HAND REGION:
2 AE:
B8R COUNSEL:
S. TREBY CONST. INSP REAC. TYPE: LMFBR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP DESIGN PUR 0975 MWT/0350 MWE CONST: S8U RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safety revico uns reinitiated in October 1981.
A revision to the Site Suitability Report was issued June 18, 1902.
ER DOCKETED:
04/11/75 04/11/75C On Aucust 17, 1982, NRC issued an order granting Clinch ER SITE VISIT COMPLETE:
River's request to begin site preparation activities.
ItPUT TO DES TO Pit:
The Site Suitability Report hearing sessions were held ISSUE DES:
02/12/76C in Oak Ridge during the week of August 23, 1982.
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
02/07/77 02/07/77C CURRENT ENV. STATUS:
The FES ums i ssued in February 1977.
A document updating the FES was issued on July 19, 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/15/74 10/15/74C SAR DOCKETED:
06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:
04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVEE 05/15/82 05/15/82C CUPRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/16/82 0 7/16 /82 C Hearing sess: ens on the SSR took place on August 23-27, ISSUE DRAFT SER:
09/27/82 1982.
The FES hearings are scheduled for November 15, 1982.
INPUT TO SER:
01/14/83 ISSUE SER:
03/04/83 ACRS FULL COMMITTEE MEETING:
05/06/83 INPUTS TO SE SUPPLEMENT 1:
06/10/83 ISSUE SE SUPPLEMENT 1:
07/01/83 CURRENT ANTITRUST:
HEARING STARTED:
08/23/82 08/23/82C ASLB INITIAL DECISION:
05/01/84 ASLB FINAL DECISION:
TECH SPECS CC"PLETED:
COM:1ISSION DECISION:
06/01/84 CP ISSUED:
06/01/84 LATEST AMENDMENT:
NEW SLIPS / NOTES:
NRR L ICENSING SY$T EM PAGE NO: 2--36 PEBBLE SPRINGS 1 42 CP CURRENT STATUS REP 0RT REPORT AS OF 09/15/82 PLANT' CHARACTERISTICSt KEY PERSONNEL DOCKET N0:
051480515 LIC. FN:
D. SCALETTI ASLB CHAIR:
I. SMITH APPLICANT:
PORTLAND GENERAL ELECTRIC LIC. BC:
E. ADENSAf1 MEl1BER 1:
- 0. PARIS LOCATION:
3 MI NU OF ARLINGTON, ORE LIC. LA.6 M.
DUNCAN NEf13ER 2:
W.
JORDAN REGION:
5 AE BECH COUNSEL B.
BORDENICK CONST. INSP:
REAC. TYPE: PWR NSSS: B8W ANTITRUST B. V0GLER RESID. INSP:
DESIGN PWR 3760 MWT/1260 MWE CONST: BECH RM ANALYST:
L.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Amendment 13 to the PSAR in response to 10CFR50.34(f)
-(CP/ML rule) was filed 1/29/82.
The staff's review of ER DOCKETED:
08/06/74 08/06/74C the TMI-2 issues is presently in a hold status awaiting ER SITE VISIT COMPLETE:
a decision by PGE whether or not to continue their INPUT 70 DES TO PM:
10/11/74 12/11/74C application at a different site (see Environmental Status).
ISSUE DES:
11/15/74 01/06/75C A decision is expected within 2 months.
RESPONSE TO COMMENTS ON DES:
03/07/75 03/22/75C ISSUE FES:
04/07/75 04/16/75C CURRENT ENV. STATUS:
On 4/9/82 PGE withdrew their application, before the Dragon Energy facility siting council, for the Pebble SAFETY / HEARING MILESTONES:
Springs site.
The alternative sites hearing before the ASLB scheduled for 4/20/82 was cancelled.
APPLICATION TENDERED:
06/07/74 06/07/74C SAR DOCKETED:
10/18/74 10/13/74C SAR Q'S RECEIVED BY PM:
12/13/74 01/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/14/75 02/04/75C CURRENT HRG. STATUS:
INPUT TO DR AFT SER TO Pit:
04/11/75 05/23/75C A prehearing conference on alternative sites was held ISSUE DRAFT SER:
on December 1,
1981 INPUT TO SER:
09/01/75 12/08/75C ISSUE SER:
01/05/76 01/12/76C ACRS LETTER RECEIVED:
11/12/76 02/12/76C INPUTS TO SE SUPPLEMENT 6 09/09/76 12/14/77C ISSUE SE SUPPLEMENT 6:
N/S CURRENT ANTITRUST Antitrust review is complete.
HEARING STARTED:
ASLB INITIAL DECISION:
N/S ASLB FINAL DECISION:
TECH SPECS CCMPLETED:
COMMISSION DECISION:
N/S CP ISSUED:
N/S LATEST AMENDMENT:
Amendment 13 to the PSAR in response to 10CFR50.34(f).
NEW SLIPS / NOTES:
NRR L I C E N $ I.H G SYSTEM PAGE ND:.2 _SKAGIT/HANFORD 182
_C P C.U R R E N T STATUS REP 0RT REPORT AS OF '09/15/82;
.P[L A.N T CHARACTERISTICSt KEY PERS0NNEi DOCKET NO:
052280523 LIC. PM:
C. MOON
-ASLB CHAIR:
J. UCLF E. ADEMSAM MEMBER 1:
F. HOOPER-APPLICANT: :PUGET SOUND POWER 8 LIGHT LIC. BC '
N.
DUNCAN MEM3ER 2
-G.
LINENBERGER:
LOCATION:
30 MI, NW OF RICHLAND, WA.
LIC. LA.:
REGION:
5 AE2 BECH COUNSEL:
R.
BLACK CONST. INSP REAC. TYPE : BWR-NSSS: GE ANTITRUST B. V0GLER RESID. INSP3.
DESIGN PWR 3833 MWT/1277 MWE CONST: BECH RM ANALYST S. HEDLUND CURRENT SAF.-STATUS:
. ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI-related action items.
Site relocation ER amendment and PSAR ER DOCKETED:
09/30/74 09/30/74C amendment were submitted on 12/31/8f. The applicant is
'ER SITE VISIT C0FPLETE:
02/05/82-02/05/S2C relocating the site to the Hanford Reservation.
INPUT TO DES TO Pits 04/07/82 04/09/82C On 7/16/82, the staff requested additional ecological ISSUE DES:
05/04/82 05/04/82C field data.
Submittal and review of this data will RESPONSE TO COMMENTS ON DES:
09/30/82 require a delay in issuance of supplement No. 3 to ISSUE FES:
12/00/82 SER to 11/82.
CURRENT ENV. STATUS:
' Site relocation (to Nanford) DES was issued on May 4, 1982..The FES is expeated to be issued 12/82.
SAFETY / HEARING MILESTONES:
AFPLICATICH TENDERED:
03/06/74 08/06/74C.
SAR DOCKETED:
01/15r 7 5 01/15/75C SAR Q'S RECEIVED BY PM:
02/10/82 02/10/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/82 CURRENT NRG. STATUS:
INPUT 70 DRAFT SER TO PM:
A special prehearing conference was held on May 5, 1982.
ISSUE D3 AFT SER:
Safety hearings are expected to begin in 02/83.
INPUT TO SER:
07/11/77 07/11/77C Environmental hearings, except for need-for power, are ISSUE SER*
03/31/77 08/31/77C expected to begin in 04/83.
Need-for power hearing is expected to begin in 05/83 after the Regional Power ACRS FULL COMMITTEE MEETING:
01/00/83 Council publishes a regional conservation and electric INPUTS TO SE SUPPLEMENT 3:
10/15/82 power plan.in 04/83.
ISSUE SE SUPPLEMENT 3 11/15/82 CURRENT ANTITRUST:
Complete HEARING STARTED:
07/15/75 07/15/75C ASLB INITIAL DECISICH:
04/00/83 ASLB FINAL DECISICN:
N/S TECH SPECS CCMPLETED:
N/A COMMISSION DECISION:
07/00/83 CP ISSUED:
07/00/33 LATEST AMENDMENT:
NEW SLIPS / NOTES:
i
NRR' L I.C E N $ I N G S Y S.T E M -
PAGE NO ' 2'- ' 38.
-IBOP)BOPSSAR/BSAR-205 PDA CURRENT STATUS R.E P O R T
~ REPORT.AS OF 09/15/82 P L A_N T fC H A R A'C T E R I S T I.' C S t.
KEY P E R S 0 N N'E L -
DOCKET NO:
05000560 LIC. FM
. UNASSIGNED ASLB CHAIR:
APPLICANT:
FLUOR POWER SERVICES LIC. BC:
C. THOMAS MEMBER-1
-LOCATION:
N/A LIC. LA.:
P.
ANDERSON MEMBER 2:
REGIDH 1 -
AE2 FLUOR COUNSEL:
'N/A CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP DESIGN PWR 0000 MWT/00r,0 MWE-CONST:
RM ANALYST S. HEDLUND CURRENT SAF. STATUS'
'SCHED. DATE ACTUAL DATE d
ENVIRONMENTAL MILESTONES Review in abeyance pending the future of standardization.
ER DOCKETED:
ER SITE VISI: COMPLETE:
INPUT TO DES TO PM:
ISSUE DFS RESPUNSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/31/77 10/31/77C SAR DOCKETED:
10/31/77-10/31/77C GAR Q'S RECEIVED BY PM:
04/14/78 06/20/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/02/78 07/31/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/25/78 07/07/78C ISSUE DRAFT'SER:
INPUT TO SER:
08/21/78 10/17/78C ISSUE SER:
10/02/78 12/29/78C ACRS LETTER RECEIVED:
11/17/78 02/16/79C INPUTS TO SE SUPPLEMENT 1 12/08/78-03/21/79C ISSUE SE SUPPLEMENT 1:
N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
CCl*"ISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST-AMENDMENT:
NEW SLIPS / NOTES:
b
+
' d ; ' g;a ' ),-_p, 9t y n m yg k,_
,,g
- ~
-9 a....~.
K su..' * :
s-'
j
,, -..'.~'t..n."
n q.; ".'
' :. ' g h.
, y-.
... '=.
- _.. ^
L'__
9 +.'., iN; n..).
y-HRR LICEN5 ING SYSTEM PAGE NO: 2-39
.P (BOP)ESSAR/BSAR-205 PDA CURR ENT STATUS REPORT REPORT AS OF: 09/15/32 PL A NT CHA R A'C T E R I S T I C S:
KEY P E R S 0 N N E Le DOCKET NO:
00002591 LIC. PM:
UNASSIGNED ASLB CHAIR APPLICANT:
EDASCO SERVICES LIC. LC:
C.
THOMAS MEMBER 1:
LOCATICN:
N/A LIC. LA.:
P.
ANDERSON MEMGER 2
~
REGION:
0 AE:
EBASCO COUNSEL:
UNASSIGNED CONST. INSP:
i PEAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PUR: 0000 MMT/0000 MWE CONST:
RM ANALYST M.
KING A
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyanco pending the future of standardization.
and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO C0"t1ENTS ON DES:
T ISSUE FES:
a CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 ft/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S N.i x
SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT
- EG. STATUS:
IMPUT TO DRAFT SER TO PM:
N/S ISSUE CRAFT SER.
}~
INPUT TO SER:
N/S ISSUE SER:
N/S
,y h
ACRS FULL COMi1ITTEE MEFTING:
N/S
~
INPUTS TO SE SUPPLEMENT :
N/S ISSUE SE SUPPLEMENT 1:
N/S
?
CURRENT ANTITRUST:
r HEARING STARTED:
ASLB INITIAL DECISION:
COM1ISSION DECISION:
m SPECIAL PROJECT COMPLETE:
N/S
'T LATEST AMENCMENT:
NEW SLIPS / NOTES:
5'
' '. ' J %f
, q
.t.'.,. >- [ -
' ", ; ' 1
- j(, _..- %
7.'
(_,% ; ' c '.,, ; j G,p c-
.., c -
~
,'[ $ '.,;p.,;.4:g Ih. '.' 4,.,.,
'T+4^*_'Y.i, ~
~~[
(-
'.,,'f*.
3, V
~. ^;.
'. - F '
}
f
/-
1
, _ -}
- ,d "Y..,,. '.,' I-
,1,- [l' J.I-
-[ jy..,
kN
'..y
- : -.. n z t.
8,.,e v-s
- . e -
9,
~...c.
~..
..h..
. yv
, 7 ' t....
a g. g,.;y. g,.t $g.s -
y,
+
,~
..- ~,
74 l,f., ;
sa
- v. ',p_
,- !'q
.z;,y,..
NRR LICENSING SYSTEM PAGE NO: 2-40 (80P)ESSAR/CESSAR-80 PDA CURRENT STATUS REP 0RT REFORT AS OF: 09/15/S2 PLANT CHARACTERISTIC 5:
KEY PERS0NNEL:
DOCKET NO 05000591 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
EBASCO SERVICES LIC. DC:
C.
THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE:
EBASCO COUNSEL:
. UNASSIGNED CONST. INSP:
REAC. TYPE: BOP HSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR 3800 MWT/0000 MWE CONST:
RM ANALYST:
M.
KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILC: TONES:
SCHED. DATE ACTUAL DATE Review in abovence pending the future of standardization, and resourcea '%econduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:
N/S CURRENT NRG. STATUS:
ISSJE DRAFT SER:
INPUT TO SER:
N/S IS$UE SER:
N/S ACRS FULL COP.MITTEE MEETING:
N/S INPUTS TO SE Sur'LEMENT 1:
N/S ISSUE SZ SUPPLEMENT 1:
N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
CCCMISSION DECISION:
SPECIAL PROJECT COMPLETF N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
NRR L ICENSING SYSTEN PAGE NO: 2-41 (BGP)ESSAR/RESAR-414 PDA CURRENT STATUS REPORT REPORT AS OF 09/15/82 i
PLANT CHARACTERISTICSt K EY P E R S O N N E L:
DOCKET NO:
00007591 LIC. PM:
, UNASSIGNED ASLB CHAIR:
APPLICANT:
EBASCO SERVICES LIC. BC:
C.
THOMAS MEMBER 1:
LOCATION:
N/A LIC.
LA.+
P. ANDERSON NEMBER 2:
REGION:
0 AE:
EBASCO CCUNSEL:
UNASSIGNED CONST. INSP:
REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0 0 0 0 MWT/ 0 0 0 0 M'a E CONST:
RM ANALYST:
M.
KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO FM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY FM:
N/$
SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT NRG. STATUS:
INPUT TO CRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1:
N/S ISSUE SE SUPPLEMENT 1:
N/S CURRENT ANTITRUST:
NEARING STARTED:
ASLB INITIAL DECISICN:
CC ::1!SSION DECISIGN:
SPECIAL PROJECT COMPLETE:
N/S i
LATEST AMENDMENT:
NEW SLIPS / NOTES:
=
NRR L ICENSING SYSTEM PAGE NO: 2-42 (BOP)GAISSAR PDA CURRENT STATUS REPQRT REPORT AS OF 09/15/82 PLANT CHARA CTERI$T I C St KEY P E R S 0 N N E L:
COCKET NO:
05000595 LIC. PM UNASSIGNED ASLB CHAIR:
APPLICANT:
GILBERT COMMONWEALTH LIC. BC:
C.
THOMAS MEf1BER 1:
LOCATION:
N/A LIC. LA.
P.
ANDERSON MEMBER 2:
REGION:
4 AE:
WEST COUNSFL:
M.
KARMAN CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PUR 0000 MWT/0000 MUE CONST:
RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/24/78 02/24/78C SAR DOCKETED:
08/2'/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO CRAFT SER TO PM:
N/S ISSUE DRAFT SER:
N/S INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1:
N/S ISSUE SE SUPPLEMENT 1:
-H/S CURRENT ANTITRUST:
)
HEARING STARTED:
ASLB INITIAL DECISION:
CCr**1ISSION DECISICN:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
I NEW SLIPS / NOTES:
,c-
?f '
}., e# '- ' ] "-Q f, &@.'i..,l;,~ ~,f * ?JN' % ; f } 3,;-%
'E i. _.; Y Y __7 t l.~' _'_. _. 7. $., " f
.?
1.
f-L HRR L ICENSING SYSTEM PAGE NO: 2-43 (BOPJGIBBSSAR (W)
PDA CURRENT STATU$
REP 0RT REPORT AS 3F: 09/15/82 m
PLANT C H A R A C T E R I $ T I C S:
KEY PERS0NNELa DOCKET NO:
050005S4 LIC. PM:
UNASSIGNED ASLB CHAIR:
ArPLICANT:
GIBBS 1..LL LIC. BC:
C.
TH0f ?AS
,1E f13 E R 1:
LOCATION:
N/A LIC. LA.
'P.
ANDERSON MEf1 DER 2:
REGION:
0 AE:
GNDR COUNSEL:
M. UACHER CONST. INSP:
REAC. TYPE: 20P NSSS:
ANTI! RUST:
RESID. INSP:
DESIGN PUR: 0000 MUT/0000 PWE CONST:
RM ANALYSTr M.
ANDERSON i
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Rovicu in abeyanco pending the future of standardization and resources to conduct review.
ER DOCKETED:
ER SITE VISIT CCMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
' RESPONSE TO COMMENTS ON DES:
ISSUE FES:
B g
CURRENT ENV. STATUS:
SAFETY /HEARIMG MILESTONES:
APPLICATI0?! TENDERED:
10/15/76 10/15/76C SAR DOCKETED:
04/08/77 05/10/77C SAR Q'S RECEIVED BY PM:
02/03/78 03/16/79C F
SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO ORAFT SER Tc PM:
N/S b
ISSUE D2 AFT SER:
INPUT TO SER:
N/S L
ISSUE SER:
N/S r
ACR$ FULL CCMMITTEE MEETING:
N/S II; PUTS TO SE SUPPLEMENT 1:
N/S ISSUE SE SUFPLEMENT 18 N/S g
I CURRENT ANTITRUST:
HEtRING STARTED:
ASL5 INITIAL DECISION:
CC'"1ISSION DECISICH :
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEL
.IPS/ NOTES:
r A
?
E
NRR LICENSING SYSTEN PAGE NO: 2-44 (BOP)$WESSAR/BSAR-205 PDA CURRENT STATUS REPORT REPORT AS OF 09/15/82 PLAHT CHARACTERISTIC $8 KEY PERS0NNEL DOCKET NO:
00000595 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
STONE 8 WEBSTER LIC. BC:
C.
THOMAS met 1BER 1 LOCATION:
N/A LIC. LA.:
P.
ANDERSON MEf1BER 2:
REGION:
0 AE:
S3W COUNSEL:
. UNASSIGNED CONST. INSP:
REAC. TYPE: BOP HSS$:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST: N/A RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Rowlew in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
N/A ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/15/75 12/22/75C SAR DOCKETED:
12/22/75 12/22/75C SAR Q'S RECEIVED BY PM:
11/12/76 04/04/77C SAR APPL. RESPONSE 70 Q'S RECEIVED: 01/14/77 05/20/77C CURRENT nRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE CRAFT SER:
INPUT TO SER:
09/09/77 10/13/77C ISSUE SER:
10/19/77 12/02/77C-ACRS LETTER RECEIVED:
01/15/78 01/13/78C INPUTS TO SE SUPPLEMENT 1:
!I/S ISSUE SE SUPPLEMENT 1:
N/S l
CURRENT ANTITRUST NEARING STARTED 1
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/$
LATEST AMENDMENT:
NEW SLIPS / NOTES:
I
NRR L ICEN5ING SYSTEM PAGE NO: 2-45 (NSS)CESSAR SYSTEM 80 FDA CURRENT STATUS REP 0RT REPORT AS OF: 09/15/82 PLANT CHARACTERI$T I C St KEY PERSONNELe DOCKET NO - 05000470 LIC. FM:
C.
CRIMES ASLB CHAIR:
APPLICANT:
COMBUSTION ENGINEERING LIC. CC:
C.
TH0r*AS f E!!3ER 1:
LOCATION:
N/A LIC. LA.:
P.
ANDERSON ttET; DER 2:
REGION:
0 AE:
COUNSEL:
ti. WAGNER CONST. INSP:
REAC. TYPE: PWR NSSS: COMB ANTITRUST:
RESID. INSP DESIGN PWR: 3800 MWT/1295 MWE CONST:
Rf1 ANALYST:
M.
KING CURRENT SAF. STATUS:
ENVIR0!i1ENT AL MILESTONES:
SCHED. DATE ACTUAL DATE SER (NUREG-0852) issued 11/81 Awaiting documentation to resolve ACRS, open, and confirmatory issues.
ER DOCKETED:
ER SITE VISIT COMPLETE:
I t'F U T TO DES TO FM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
N/A.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/27/78 10/27/78C SAR DOCKETED:
12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:
09/01/83 09/01/8tc SAR APPL. RESPONSE TO Q'S RECEIVED: 01/08/81 07/15/81C CURRENT NRG. STATUS:
INPUT TO CRAFT SER TO PM:
N/S N/A.
ISSUE DRAFT SER:
N/S INPUT TO SER:
11/01/81 11/13/81C ISSUE SER:
05/01/C2 ft/10/81C ACRS LETTER RECEIVED:
06/21/82 12/1S/81C INPUTS TO SE SL:FPL Ef*ENT 1:
02/23/83 ISSUE SE SUPPLEMENT 1:
03/30/83 CURRENT ANTITRUST:
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A CC!171ISSIO N DECISION:
07/00/83 SPECIAL PROJECT COMPLETE:
07/29/83 LATEST AMENDMENT:
NEW SLIPS / NOTES:
l
- " h.y.
t
- ,- -
- d.' %..
,... ' ~, '. + '
.- &,.. : z.y
. (-
,,..? :.i - -
y,...
.~s.
.~.:--
c-
.l.--
. y-
- g. _
_. pg;.. ',. e- :... '.
?. N g-
..'g.;'...,;-.
< :".q. n.3. g,,
.. y '.
,e s
.'t.....,,..
. :, ~
g.
rg.y' g.:..; *:. _
E.
9
'u m.
,?.
'~-aur
- J
<~ Y; bi... >.
~
~
+.-
.. '/.e n.&<.aJ.y.
L
,,7 e,
V,.
~.
q.
v
.e.
. z t
't
[ ' -l' 3.
..s.
- . t.,'
s.
.\\.,'
- ' ~,
_ r ~.-
. ~
c
NRR LICEN$ING SYSTEM PAGE NO: 2-46 (NSS)GESSAR SEVERE ACC FDA CURRENT STA TUS REPORT REPORT AS OF 09/15/82 PLANT CNARACTERISTICSt KEY PERS0NNEL DOCKET NO:
00007447 LIC. PM:
D.
LYNCH ASLB CHAIR N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C.
T H0f1 A S MEMBER 1:
N/A LOCATION:
N/A LIC. LA.
P. ANDERSON MEMBER 2 N/A REGION:
0 AE:
ERAUN COUNSEL:
B. BORDENICK CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:
RESID. INSP:
DESIGN PWR: 3579 MWT/1220 MWE CONST RM ANALYST:
B.
ST MARY ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
GESSAR II was docketed 02/82; review is in progress.
Sone generic issues are being identified / resolved in ER DOCKETED:
conjunction with LRG-II.
Dates shown reflect review ER SITE VISIT COMPLETE:
for the severe accident design.
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
09/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 IFTUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
ISSUE DRAFT SER:
INPUT TO SER:
02/01/84 ISSUE SER:
03/01/84 ACRS FULL COMMITTEE MEETING:
04/06/84 INPUTS TO SE SUPPLEMENT 1:
04/21/34 ISSUE SE SUPPLEMENT 1:
05/2S/84 CURRENT ARTITRUST:
FDA antitrust review is in progress.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A CCt71I S SI O N DECISION:
05/00/84 SPECIAL PROJECT COMPLETE:
05/00/84 LATEST AMENDMENT:
FDA Amendment No. 6 was received in August, 1982.
NEW SLIPS / NOTES:
?
.?.
~
..-.m NRR L ICENS ING SY$ TEM PACE NO: 2-47 (NSS)GESSAR-238 HI FDA CURRENT STATUS REP 0RT REPORT AS OF: 09/15/82 PL ANT CHARACTERISTIC $*
KEY PERS0NN E L:
DOCKET NO:
05000447 LIC. PM:
D. LYNCH ASLB CHAIR: N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C.
THOMAS MEMBER 1:
N/A LOCATION:
N/A LIC. LA.:
P.
ANDERSON MEMBER 2:
N/A REGION:
0 AE:
BRAUN COUNSEL:
B.
BORDENICK CONST. INSP:
REAC. TYPE: EWR NSSS: GE ANTITRUST:
RESID. INSP DESIGN PWR: 3579 MWT/1220 MWE CONST:
RM ANALYST:
B.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82.
The foundation analysis issue will require special attention. PRA for severe ER DOCKETED:
accident desion was rubmitted 4/82.
Severe accident ER SITE VISIT COMPLETE:
design modifications were submitted 6/82 in Amendment INPUT TO DES TO PM:
No.
4.
GE has recuested the EDO to accelerate the ISSUE DES:
PRA review schedule to coincide with the FDA.
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DCCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
10/15/82 SAR APPL. RESPGNSE TO Q'S RECEIVED: 12/30/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE CRAFT SER:
INPUT TO SER:
02/01/83 ISSUE SER:
03/02/83 ACRS FULL CCMMITTEE MEETING:
04/08/83 INPUTS TO SE SUPPLEMENT 1:
04/15/83 ISSUE SE SUPPLEMENT 1:
05/1?/83 CURRENT ANTITRUST:
FDA antitrust review is in progress.
HEt. RING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMF1ISSION DECISION:
05/00/83 SPECIAL PROJECT COMPLETE:
05/00/83 LATEST AMENDMENT:
FDA Amendment No. 6 was received in August, 1982.
NEW SLIPS / NOTES:
v NRR L ICENSING SYSTEM PAGE NO: 2-49 (SP)FHP t-8 (MANUF.)
$PC CURRENT STATUS REP 0RT REPORT AS OF 09/15/82 PLANT CHARACTERISTICSt KEY PERSONNEL DOCKET NO:
05000437 LIC. PM:
UNASSIGNED ASLB CHAIR:
S. WOLFE APPLICANT:
OFFSHORE PCWER SYSTEMS LIC. BC:
E. ADENSAM MEMBER 1:
D. SCHINK LOCATIDH JACKSONVILLE, FLA.
LIC. LA.:
M. DUNCAN MEMBER 2:
G. BRIGHT REGION:
2 AE:
OPS COUNSEL:
D. GODDARD CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP DESIGN PWR: 3411 MWT/1150 MWE CONST: OPS RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE ML matters have been addressed by applicant. SSER 4, covering TMI requirements and other previous unresolved ER DOCKETED:
07/05/73 07/05/73C issues, was issued 09-29-81.
An ACRS subcommittee ER SITE VISIT COMPLETE:
08/16/73 08/16/73C meeting was held on 10-15-81.
The ACRS sent a favorable INPUT TO DES TO PM:
07/01/74C letter on 10-19-81.
Commission Decision is projected ISSUE DES:
04/12/74 07/26/74C RESPONSE TO COMMENTS ON DES:
for 09-82.
ISSUE FES:
10/06/75 10/06/75C CURRENT ENV. STATUS:
All environmental statements have been issued.
SAFETY / HEARING MILE;f0HES:
APPLICATION TENDERED:
05/07/73 05/07/73C SAR DOCKETED:
07/05/73 07/05/73C SAR Q'S RECEIVED BY PM:
02/15/74 02/15/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/08/74 04/08/74C l
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/25/75 07/25/75C Suppl. 4 to the SER was entered into the record on 12-4-81.
ISSUE DRAFT SER:
Hearing reopened and closed on 12-4-81.
Licensing Board INPUT TO SER:
08/22/75 C8/22/75C issued an Initial Decision on 6-30-82, authorizing the ISSUE SER:
09/30/75 09/30/75C Director of HRR to issue a manufacturing license, subject to a condition, to OPS for the manufacturing by the end ACRS LETTER RECEIVED:
10/19/81 10/19/81C of 1999 of eight standardized floating nuclear plants at INPUTS TO SE SUPPLEMENT 4:
02/20/76 G3/05/76C Blount Island, Jacksonville, Florida.
ISSUE SE SUPPLEMENT 4:
09/00/81 09/29/8fC l
CURRENT ANTITRUST:
HEARING STARTED:
06/17/76 06/15/76C l
ASLB INITIAL DECISI0H:
06/30/82 06/30/82C COMMISSION DECISION:
09/00/82 SPECIAL PROJECT COMPLETE:
09/00/82 LATEST AMENDMENT:
NEW SLIPS / NOTES:
1 1
I
NRR LICEN$ING SYSTEM PAGE NO: 2-49 CARROLL SITE E5R CURRENT STA TUS REP 0RT REPORT AS OF 09/15/82 P L A N'T CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000599 LIC. PM:
J. WILSON ASLB CHAIR:
J. W3LF APPLICANT:
COMMONWEALTH EDISON LIC. BC:
C.
THOMAS T1EM3ER 12 3.
BRIG;iT LOCATION:
CARROLL COUNTY. IL.
LIC. LA.:
P.
ANDERSON METISER 2:
R. NOLTON REGION:
3 AE:
COUNSEL:
R.
LESSY CONST. IdSP:
REAC. TYPE:
NSSS: WEST ANTITRUST:
A.
HODGDON RESID. INSP:
DESIGN PWR 0000 MWT/1120 MWE CONST:
NM ANALYST:
S.
HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The commercial operation date has been postponed until 1999 - 2000.
This Itcense ER DOCKETED:
04/07/79 04/07/790 is not under active r aview.
ER SITE VISIT COMPLETE:
N/S INFUT TO DES TO PM:
N/S ISSUE DES:
N/S RESPONSE TO COMMENTS ON DES:
N/S
}
ISSUE FES:
N/S CURRENT ENV. STATUS:
Portions of the alternate site study are under review by DOE.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/20/78 12/20/78C SAR DOCKETED:
SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Five intervenors have been admitted.
ISSUE DRAFT SER:
INPUT TO SER:
ISSUE SER:
INPUTS TO SE SUPPLEMENT
+
ISSUE SE SUPPLEMENT CURRENT ANTITRUST:
Awaiting updated antitrust information from applicant.
HE/ RING STARTED:
N/S ASLB INITIAL DECISION:
N/S SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
1 l
l 1
f
T HRR LICEHSIHG SYSTEM AS OF809/15/82 H0H-POWER REACT 0RS INPUT ISSUE EARLIEST ISSUEN TO SER ISSUE FES OR START ISSUE NON-POWEP FACILITY E0fEEI RES TO Fft 118 EIA ff E APING gl C OP"1EN T S AFRRI, ?RIGA 1000.0000W TANK ESTIMATED DATE: 10/80 N/A 01/82 N/S 09/82 N/S CONTESTED CASE ACTUAL DATE:
10/80C 01/32C NBSR 10.0000W T ESTIMATED DATE: 12/80 02/82 11/82 08/82 01/83 PONER INCREA!E TO 20 MW ACTUAL DATE:
12/30C 02/32C 03/82C INCLUDED IN RENEWAL TEXAS A8M, TRIGA 1000.0000W POOL ESTIMATED DATE: 07/79 N/A 10/82 11/82 11/82 ACTUAL DATE:
07/79C U. OF FLA., ARGONAUT 100.0000W GRAPH ESTIMATED DATE: 01/81 N/A 06/82 09/82 N/A 09/82 ACTUAL DATE:
01/81C 06/82C U. OF VA.
2000.0000W POOL ESTIMATED DATE: 03/77 N/A 10/82 10/82 N/A 10/82 ACTUAL DATE:
03/77C WORCHESTER POLY TECH 10.0000W ESTIMATED DATE: 07/79 H/A 10/32 N/S N/A 10/82 ACTUAL DATE:
07/79C N FOR TEST REACTORS ONLY
M M
Z Q
w H
U LLJ en
NRR LICEN5ING SYSTEM PAGE NO: 2-0L CURRENT
$TATUS REPQRT REPORT AS OF PLAN T C H A R A C T E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCXET NO:
Docket No.or Project No.,if not docketed LIC. PM:
Licensing Project Manager ASLB CHAIR ASLB Chairman APPLICA:li Utihty LIC. BC:
Licensing Branch Chief f1Et1B ER 18 on panel LOCATIDH:
Miles and direction from nearest major town LIC. LA.:
Licensing Assistant MEMBER 2a on panet REGION:
1 through 5 AE:
Architect / Engineer COUNSEL:
Attorney assigned to case CONS T. INSP Construction Inspector F F /. C. TYPE:
PWR, BWR, HTGR or LMFBR NS*,S : Nuclear Steam Systems Supplier ANTITRUST Antitrust Attorney RESID, INSP Resident inspector EESIGN F C : Megawatts electric & ' thermal CCNST: Constructor r:PA ANALYST: MPA analyst assigned to track project CUri'EdT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safety status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late input from ER DOCKETED:
Environmental Report v
T 0ttP ETE:
review branches should be indicated, along with indication of the critical path.
P O
rf p
ISSUE DES:
Draft Environmental Statement RESPONSE TO COMMENTS ON DES:
ISSUE FES:
Final Environmental Statement C U R EN T ENV. STATUS:
Environmental status for this reporting period only. It consists of accomplishments.and
(
schedule changes occurring since the last issue of Blue Book. Outstanding issaaes and late SAFETY / HEARING MILESTONES:
1 input from review branches should be indicated, j
APPLICATION TENDERED:
SAR DOCKETED:
Safety Analysis Report SAR C'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CU"REMT H2G. STATUS:
INPUT TO DRAFT SER TO PM:
Changes in the hearing siates since the last issue of Blue Book. Changes in intervention and ISSUE D': AFT SER Safety Evaluation Report contentions should be indicated.
IMPUI T0 $ER:
ISSUE SER:
ACRS LETTER RECEIVED:
Advisory Committee INPUTS TO SE SUPPLE:tEMT 3:
on Reactor Safeguards ISSUE SE SUPPLE 1ENT 3:
CURRENT ANTITRUST:
Changes in the antitrust status since the last issue of B!ue Book.
HEARING STARTED:
ASLB INITIAL DECISION:
Atomic Safety & Licensing Board ASLB FINAL DECISION:
TECH SPECS CO:iPLETED:
CCt:1ISSION DECISION:
ISSUE PARTIAL FOMER LICENSE:
L AT EST ATIENDi'EMT :
ISSUE FULL PO'.4ER LICENSE:
The latest amendment submitted by the applicant.
SCHED. DATE RECEIPT DATE N Q SLIPS / NOTES:
Slips or potential problems that should be brought to management's attention.
CONSTRUCTIGN C0t:PL ETION - APPL. I hh,can t of e"
ny construction m construction completion completion
+
I
y i
""f,'
"" 335 U S. NUCLE AR RE GUL ATORY COMMISSION BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vol. 11 No.9 2 (Leave bra,al 4 1tT LE AND SUBT ST LE (Adc vorurne No, of appecpo atel Regulatory Licensing Status Summary Report 3 "' NS *
- SS' ""
(Blue Book) 5 D AT E RE PO HT C O*.'PL E 1 F D
- 7. AUTHOR tS) l4 EAR MONTH Septen.ber 1982 DATE RE PORT ISSUED fr PE RF ORMING ORG ANIZ ATION N AME AND M alLING ADDRE SS //nciade lp Cooel l'1982
'^"
"C"'"
Office of Resource Management September Management Information Branch 6'*
U. S. Nuclear Regulatory Cormission Washington, D.C.
20555 g,
i2. SPcNSORING ORG ANIZ ATION N AYE AND f." AILING ADDRE SS limcluor 2 0 Caoel O PHOJF Cl T ASA WOHK UNIT NO Office of Resource Management ii. CONT R AcT No Management Infomation Branch U. S. Nuclear' Regulatory Comission Wasnington, D.C.
20555 rt nico covl RE D floclus-ve cates) 13 TYPE OF REPORT August 17, 1982 - September 15, 1982 14 fleeve t>a'al 15 SUPPLE MENT ARY NOTES 16 ABSTR ACT (200 *oros or iessl Provide a review of the status of the progress of the licensing reviews for all i
construction permits, operating license, special project and non-power reactor renewals under review, as reported to Congress.
17a DE SC rip T ORS 17 KE Y WORDS AND DOCUME NT AN ALYSIS I
$170 IDENTIFIE RS OPEN ENDE D TE RMS 19 SE CURS T Y C L ASS #TA s "An*f' 21 ' 0 08 P #- '! O
=
IS AV AIL ABILITY S1 ATE *JE NT Unclassi f_ied Unlimited sec m tr' s ow-
- " Ct Un cl a.T Y.
ssi te s
NUCLEAR REGULATORY OMMISSION G " ',(' 5 ' ' O WASHINGTON. D C. 20655
- - c PENALTY F R PRN ATE E. $300
.c
_ - - _ _ _ _ _ - _ _