Notice of Violation from Insp on 820526-0621
ML20027B008
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/14/1982
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20027A989 List:
References
50-321-82-20, 50-366-82-20, NUDOCS 8209160259
Download: ML20027B008 (2)


Text

,

t JUL 111332 APPENDIX A NOTICE OF VIOLATION Georgia Power Company Docket Nos. 50-321, & 50-366 Hatch 1 and 2 License Nos. DPR-57 & NPF-5 As a result of the inspection conducted on May 26 - June 21, 1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9,1982), the following violation was identified.

A.

Technical Specification 6.8.1 requires that procedures controlling the operation of safety-related systems be implemented.

Plant procedure HNP-1-1200, Plant Service Water, Data Package 1, requires that PSW pump cooling water isolation valves be locked open and other status be double verified.

Contrary to the above, on June 18, 1982, the Unit 1 cooling water isolation valve for ID Plant Service Water (PSW) pump was found by the inspector not locked open and properly verified in that position as required by the HNP-1-1200 procedure. The valve was later determined to be partially open.

This is a Severity Level IV Violation (Supplement I). This is a repeat item. A similar occurrance was brought to your attention in our letter of April 8, 1982.

B.

Technical Specification 3.9.12.a requires that operations involving an increase in reactor decay heat load or a positive reactivity change be suspended when the Residual Heat Removal (RHR) system is inoperable.

Contrary to the above, on April 19, 1982, the licensee failed to declare the Unit 2 "A" loop RHR system inoperable and halt refueling operations when maintenance personnel de-energized the vertical portion of the 601 panel (RHR section) in the control room. The vertical portion of the RHR section of the 601 panel had been de-energized for approximately 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.

This is a Severity Level IV Violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will 8209160259 820907 PDR ADOCK 05000321 G

PDR

l l

Georgia Power Company Docket flos. 50-321, & 50-366 llotice of Violation License fios. DPR-57 8 f1PF-5 be achieved. Consideration may be given to extending your response time for good cause shown.

JUL 141982 Date:

-~