APPENDIX A
Georgia Power Company
Docket Nos. 50-321, & 50-366
Hatch 1 and 2
License Nos. OPR-57 & NPF-5
As a result of the inspection conducted on May 26 - June 21, 1982, and in
accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9,1982), the
following violation was identified.
A.
Technical Specification 6.8.1 requires that procedures controlling the
operation of safety-related systems be implemented.
Plant procedure
HNP-1-1200, Plant Service Water, Data Package 1, requires that PSW pump
cooling water isolation valves be locked open and other status be double
verified.
Contrary to the above, on June 18, 1982, the Unit 1 cooling water isolation
valve for ID Plant Service Water (PSW) pump was found by the inspector not
locked open and properly verified in that position as required by the
HNP-1-1200 procedure. The valve was later determined to be partially open.
This is a Severity Level IV Violation (Supplement I). This is a repeat
item. A similar occurrance was brought to your attention in our letter of
April 8,1982.
B.
Technical Specification 3.9.12.a requires that operations involving an
increase in reactor decay heat load or a positive reactivity change be
suspended when the Residual Heat Removal (RHR) system is inoperable.
Contrary to the above, on April 19, 1982, the licensee failed to declare the
Unit 2 "A" loop RHR system inoperable and halt refueling operations when
maintenance personnel de-energized the vertical portion of the 601 panel
(RHR section) in the control room. The vertical portion of the RHR rection
of the 601 panel had been de-energized for approximately 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> prior to
being identified to the licensee by the inspector.
This is a Severity Level IV Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to
l
this office within thirty days of the date of this Notice, a written statement or
explanation in reply, including:
(1) admission or denial of the alleged viola-
l
tion; (2) the reasons for the violation if admitted; (3) the corrective steps
!
which have been taken and the results achieved; (4) corrective steps which will
be taken to avoid further violations; and (5) the date when full compliance will
l
I
8209160250 020907
PDR ADOCK 05000321
G
%
.
, ,
.
,
.
.
,
,,
Georgia Power Company
2
Docket Nos. 50-321, & 50-366
be achieved. Consideration may be given to extending your response time for good
cause shown.
'