ML20024G657
| ML20024G657 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 06/09/1972 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | James Keppler US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20024G656 | List: |
| References | |
| NUDOCS 9102140410 | |
| Download: ML20024G657 (1) | |
See also: IR 05000263/1972003
Text
'?[f.! -
.
y$ ;;
-
-
-
.
<
UNITED STATES
f
ATOMIC ENERGY COMMISSION
['
..
- . j
oivislON OF COMPLIANCE
g
REOlON lit
799 ROOSEVELT ROAD
TTLIPHoHE
GLEN ELLYN, lLLINots 60137
(sia) ess-asso
June 9, 1972
J. G. Keppler, Chief, Reactor Testing and Operations Branch
Directorate of Regulatory Operations, Headquarters
NORTHERN STATES POWER COMPANY (MONTICELLO)
DOCKET No. 50-263
The attached report of a routine, unannounced inspection conducted on
May 8 and 9, 1972, is forwarded for information.
No items of noncompliance were identified during this inspection.
Initial inspection of construction activities associated with the addi-
tional vaste gas hold-up system was performed by F. Dreher, Region III
Reactor Construction Inspector, and was completed as part of this inspection.
During the inspection, the inspector was informed of the failure of a
reserve transformer on May 1, 1972. The transformer was returned to
service on May 5 after a temporary replacement cable was spliced into the
circuit. A new cable is on order for permanent installation.
The following Headquarters memo was covered during this inspection:
J. G. Keppler memo dated April 18, 1972, " Pressure Switch
Problems at Monticello".
[
Gaston Fiorelli, Chief
Reac'.or Operation s Bra'nch
.
A ttachment :
R0 Rpt No. 050-263/72-03 by
K. V. Seyfrit, F. A. Dreher,
P. H. Johnson, and W. Ogg
cc:
R. B. Minogue, RS (3)
R. S. Boyd, L (2)
R. C. DeYoung, L (2)
D. J. Skovholt, L (3)
H. R. Denton, L (2)
P. A. Morris, R0
R. H. Engelken, R0
H. D. Thornburg, R0
RO Files
DR Central Files
1
9102140410 720608
ADOCK 05000263
O
- _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _