ML20024G655

From kanterella
Jump to navigation Jump to search
Discusses Insp of License DPR-22 on 720508-09.No Items of Noncompliance Noted
ML20024G655
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/08/1972
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wachter L
NORTHERN STATES POWER CO.
Shared Package
ML20024G656 List:
References
NUDOCS 9102140407
Download: ML20024G655 (2)


Text

__.

  • [

-g UNITED STATES

~'

}

  1. f ATOMIC ENERGY COMMISSION DIRECTOR ATE OF REGULATORY OPERATIONS gij e,

3 p

REGION lit

%res et 799 ROOSCVELT ROAD TaLEPHONE GLEN ELLYN. ILLINOIS 60137 (312) 856-2660 June 8, 1972 Northern States Power Company Docket No. 50-263 ATTN Mr. Leo Wachtcr Vice President Power Production and Systea Operations 414 Nicollet Mall Minneapolis, Minocsota 55401 Centlement This refers to the inspection conducted by Mecors. Scyfrit Droher, Ogg, and Johnoon on May 8 and 9, 1972, of activitics at the Monticello plant authorized by AEC Operating Licence No. DPR-22,.ar.d to the discussions of our findings held by tha inspectors with Meocrs. Larson, Clarity, Jacobson, and Sparrow of the plant staff and with Monora. Fahlen cud Jokela of your engineering departuent staff at the conclusion of the inspection.

Areca examined during the innpcetien included raduaste facility construc-tion, quality accuranco program developncnt status, replacment of 3arksdalo AC prcosure switches, calfunction of the service votcr pressuro contro11cr on March 20, 1972, calibration of HPCI stem line high area tc=perature cuitchno, environmental data related to thercolumincocent dosir.ctes readingo, repairs to the 1AR trancforner, and operation and enintenance of the reactor coolant and certain reacter auxiliary nyctens.

Within there areas, the inepection consisted of selectivo examination of procedures and repr<.acntativo retordo, interviews with plant personnel, and observations by the inspectors.

No itens of ncincompliance with AEC requirements were identified within

?.hc scope of this inspection.

9 f

s.

\\;\\ <

v

's

\\jg Y.

N l

Jhg2iggg gj8ga O

s u

h Northern States Power Cor.pany June 8, 1972 I

No reply te this letter is necessary; however, should you have any ques-tions concerning this inspection, we will be glad to discuss the:a with you.

Sincerely yours, Boyce H. Crior Regional Direc;or ces Mr. A. V. Dienhart, Vice Prcsident - Engir.cering bec:

J. G. Keppler, RO R. H. Engelken. RO P. A. Morris, RO H. D. Thornburg, RO A. Giambusso, RO R0 Files DR Central Files i

PDR Local PDR

~

NSIC DTIE O

~

~

_